| Fund Name: NIGAM NIDHI 2024-25 |
| SRNO | WORK ID | WORK ORDER NO | WORK NAME | ESTIMATE COST & DATE | TENDER AMOUNT & DATE | AGREEMENT DATE & ACTUAL WORK START DATE | TARGET DATE OF WORK COMPLETION | CONTRACTOR NAME & PHONE NO. | ENG. NAME AND PHONE NO | FUND NAME | STATUS | Work Progress | Work Before Start | Work In-Progress | Work After Compelition |
|
1
| 1 | 28 | Remaining plumbing work in Uttaranchal Bhawan. | 7.70 20/01/2024 | 7.70 11 Jun 2024 | 18 Jul 2024 18 Jul 2024 | | Arun Const.Co. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
2
| 2 | 58 | Street construction work with drain and interlocking tiles in the street of Smt. Chanchal Chauhan in Ward-60 Shyampur Main. | 21.24 02/03/2024 | 21.24 01 Aug 2024 | 21 Sep 2024 21 Sep 2024 | | Yes Enter. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
3
| 3 | 27 | Sliding, door railing, paint on doors and ACP sheet etc. remaining work in Uttaranchal Bhawan. | 9.77 20/01/2024 | 9.77 11 Jun 2024 | 18 Jul 2024 18 Jul 2024 | | Arun Const.Co. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
4
| 5 | 32 | Construction work of secondary point for C&D waste in the empty plot adjacent to RRTS Metro station in Ward-61 under Vasundhara Zone. | 3.64 25/05/2024 | 3.64 01 Aug 2024 | 24 Sep 2024 24 Sep 2024 | | H.R. Builders | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
5
| 6 | 32 | In view of the Kanwad Yatra in the city zone, barricading work is being done from Mahamaya flyover to Hindon Bridge under the Thakurdwara flyover, in the Sai Upvan temple complex and from Shri Dudheshwarnath temple to the clock tower gate and other places. | 9.77 03/07/2024 | 9.77 08 Jul 2024 | 29 Jul 2024 20 Jul 2024 | | | NAGENDRA SHARMA 8882460223 Junior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
View
|
View
|
View
|
|
6
| 7 | 26 | Construction work of drain and culvert in front of GDA market in Ward-47, Shastrinagar F-block. | 4.01 29/06/2024 | 4.01 08 Jul 2024 | 01 Aug 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
7
| 8 | 32 | Work of interlocking tiles from Pushpram Sadan house to Pramod Kumar house in Ward 16, Vardhamanpuram. | 7.10 29/06/2024 | 7.10 08 Jul 2024 | 02 Sep 2024 02 Sep 2024 | | Bashoya Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
8
| 9 | 36 | Interlocking tiles work in Ward-46, Mainapur from Mudit's shop/Satish's house via Tilak Ram Tyagi's house to Madhuban Bapudham Road. | 28.22 25/06/2024 | 28.22 08 Jul 2024 | 23 Sep 2024 23 Sep 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
9
| 10 | 21 | Repair of damaged road on Pipeline Road and gravelling work on side track. | 29.48 03/07/2024 | 29.48 08 Jul 2024 | 20 Jul 2024 22 Jul 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
10
| 12 | 33 | Construction work of CC road and drain from E-6 to E-7/7 in Ward-96, Nehrunagar Third E-Block. | 8.07 11/06/2024 | 8.07 08 Jul 2024 | 09 Aug 2024 09 Aug 2024 | | Pramood Kumar Singhal | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
11
| 13 | 28 | Improvement work by interlocking tiles in single storey C-101 to C-106, C-91 to C-95 and C-90 to C-86 in Ward-68, Brajvihar. | 8.22 11/06/2024 | 8.22 08 Jul 2024 | 21 Sep 2024 21 Sep 2024 | | V.K. Contr. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
12
| 14 | 39 | Improvement work through drain and C.C. in the damaged street from H.No.-89 to Nanak Chand's house in Rajbagh Colony, Ward-70, Janakpuri. | 12.67 22/06/2024 | 12.67 08 Jul 2024 | 07 Aug 2024 07 Aug 2024 | | A.V. Enter. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
13
| 15 | 45 | Construction work of drain and street through C.C. on both sides from C-157 Hanuman Bansal's building to C-265 in C-block, lane no. 08, ward-70, Janakpuri. | 13.57 05/07/2024 | 13.57 08 Jul 2024 | 14 Aug 2024 14 Aug 2024 | | Aasutos Const. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
14
| 16 | 21 | Repair work of damaged road from Suryanagar Police Chowki to Liquor Emporium Wine Shop, Ward-97, under Vasundhara Zone on 311 Smart City App by Dense. | 7.08 11/06/2024 | 7.08 08 Jul 2024 | 08 Aug 2024 08 Aug 2024 | | Arun Const.Co. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
15
| 17 | 26 | Repair and painting work of damaged dividers in Ward-89,76,77 in Vasundhara Zone on complaint received on 311 Smart City App. | 9.12 25/06/2024 | 9.12 08 Jul 2024 | 22 Aug 2024 22 Aug 2024 | | V.K. Contr. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
16
| 18 | other | Road improvement work by RCC drain and CC from Dr. Bengali Clinic to Arun Medical on complaint on 311 Smart City App under Vasundhara Zone. | 6.32 24/05/2024 | 6.32 08 Jul 2024 | | | Mahalaxmi Infra. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
17
| 19 | 35 | Repair work of damaged road from D-206 to D.V. Medical in Ward-97, Ramprastha under Vasundhara Zone on 311 Smart City App by DANS. | 5.61 11/06/2024 | 5.61 05 Sep 2024 | 06 Nov 2024 09 Oct 2024 | | RG BuildTech Engg. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
18
| 20 | 59 | Repair work of damaged road by patching in Ward-89, 76, 77 in Vaishali under Vasundhara Zone on complaint received on Smart City App No. 311. | 5.56 18/06/2024 | 5.56 05 Aug 2024 | 15 Oct 2024 10 Oct 2024 | | RG BuildTech Engg. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
19
| 21 | 60 | Repair work of damaged road by patching based on complaint received on 311 Smart City App under Vasundhara Zone. | 9.97 11/06/2024 | 9.97 05 Sep 2024 | 02 Dec 2024 10 Oct 2024 | | Kamlesh Engg. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
20
| 22 | 35 | Construction work of interlocking tiles on the road in front of Ret Mandi Community Centre, Ward 49, Nandgram Road. | 10.00 19/06/2024 | 10.00 25 Jun 2024 | 10 Sep 2024 | | Anuj kumar Contr. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
21
| 24 | 125 | Road improvement work by Danes from Shaheed Ashfaqulla Khan to Ramzan Hotel on Ward 95 Kaila Bhatta Main Road. | 9.84 22/07/2024 | 9.84 05 Sep 2024 | 14 Oct 2024 | | Prateek Enter. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
22
| 25 | 138 | In Ward 01 Krishnanagar Bagu, from Pawan Sharma's house to Ravindra Sharma's house, from Mahesh Sharma Girish Raghav's house, from Ramveer to Devdutt Shri Kumar to Narendra Yadav's house, repair of drains and improvement work of damaged road by C.C. road. | 9.03 13/06/2024 | 9.03 26 Nov 2024 | 24 Dec 2024 | | Pardhan Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
23
| 26 | 57 | Supply of precast concrete drain cover in Mohannagar zone. | 9.95 11/06/2024 | 9.95 01 Aug 2024 | 18 Sep 2024 18 Sep 2024 | | P.S. Consaltance | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
24
| 27 | 32 | Road and drain construction work through interlocking tiles in the damaged street from Mohan Provision Shop in Ward-07 Sudamapuri D-Block via Kanti Memorial School to Satveer Pal's house. | 13.96 22/06/2024 | 13.96 01 Aug 2024 | 03 Sep 2024 03 Sep 2024 | | Yes Enter. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
25
| 28 | 129 | Work of installing wire fencing on the side tracks of the newly constructed road from the Gurudwara to the corner in front of Allahabad Bank in Ward 72, Vaishali Sector 1. | 13.49 18/10/2020 | 13.49 01 Aug 2024 | 30 Dec 2024 30 Dec 2024 | | Zuber Const. | POOJA SINGHJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
26
| 29 | 30 | Repair of damaged road, drain and interlocking tiles from Sunil to Saurabh, Ashok to Gaur, Rana Sagaram School to Satveer's house in Ward-27, Shanti Nagar. | 8.43 06/02/2024 | 8.43 01 Aug 2024 | 09 Aug 2024 09 Aug 2024 | | Nikhil Asso. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
27
| 31 | 31 | Road improvement work by interlocking tiles on the damaged road from H.No. 882 to H.No. 945 in Ward-01, Bhimnagar Street No. 09 under Vijayanagar Zone. | 2.30 18/07/2024 | 2.30 01 Aug 2024 | 12 Sep 2024 12 Sep 2024 | | J.P. Shakti Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
28
| 32 | 115 | Patch repair work of damaged road near Sahibabad Station Road and Jal Nigam Colony Road and Shani Temple near Chhath Ghat in Ward-60, Shyampur Main. | 9.99 18/07/2024 | 9.99 05 Apr 2024 | 04 Dec 2024 10 Oct 2024 | | Kamlesh Engg. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
29
| 33 | 56 | Construction work of damaged culvert in front of Dr. Taru Singh's clinic in Ward-80, Rajendra Nagar Sector-02 through RCC. | 4.31 18/07/2024 | 4.31 01 Aug 2024 | 10 Sep 2024 | | Anuj kumar Contr. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
30
| 34 | 36 | In Ward-31, Subhash Nagar, from Dushyant's house to Subhash Chand's house via Radheshyam's house and Dr. Upadhyay's street and from Suresh Chand Sharma's house to Panna's house and from K.S. Memorial School to Chhote Lal Upadhyay's house, work of C.C.C. and drain. | 18.14 12/07/2024 | 18.14 01 Aug 2024 | 17 Sep 2024 | | Zuber Const. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
31
| 35 | 33 | Road construction work by interlocking tiles in Ward-56, Malti Colony. | 28.14 12/07/2024 | 28.14 01 Aug 2024 | 17 Sep 2024 | | Zuber Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
32
| 36 | 37 | Work of drain and interlocking tiles in Sardar Wali Gali, from Kailash's house to Yashoda's house in Ward-32, Harvanshnagar Krishnanagar. | 2.33 19/07/2024 | 2.33 01 Aug 2024 | 19 Sep 2024 | | J.P. Shakti Const. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
33
| 37 | 60 | Drain repair work in front of SB-10 in Ward-47, Shastri Nagar. | 1.56 25/07/2024 | 1.56 05 Sep 2024 | 22 Jan 2025 09 Oct 2024 | | A3R Ent | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
34
| 39 | 34 | Repair work of toilets on ground floor and first floor near Hon'ble Court. | 9.63 23/07/2024 | 9.63 01 Aug 2024 | 21 Sep 2024 21 Sep 2024 | | Royal Const.Co. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
35
| 40 | 35 | Repair work of toilets on the second and third floors near Hon'ble Court. | 5.50 23/07/2024 | 5.50 01 Aug 2024 | 23 Sep 2024 | | Chandra Mohan Singh Raguwanshi | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
36
| 42 | 38 | Construction work of interlocking tiles road from H.No. 60 to H.No. 65 in Ward-39, Nehrunagar Third H-Block. | 2.38 29/07/2024 | 2.38 01 Aug 2024 | 20 Sep 2024 20 Sep 2024 | | Ek Danth Const. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
37
| 43 | 58 | Repair work through drain and CCC in the damaged street from H.No. D-74 to Maurya ji's house in D-block, Ward-70, Janakpuri. | 16.66 29/07/2024 | 16.66 01 Aug 2024 | 23 Sep 2024 23 Sep 2024 | | R.R. Const. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
38
| 44 | 54 | Construction work of damaged drain in front of ITS College from Shani Mandir to Petrol Pump in Ward-38, Arthala by RCC. | 29.89 19/07/2024 | 29.89 01 Aug 2024 | 10 Sep 2024 10 Sep 2004 | | Prateek Enter. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
39
| 45 | 46 | Work of drain and interlocking tiles from Devendra Ghodi Wale to Anil Pandit's house in Ward 53, Raispur. | 5.62 25/07/2024 | 5.62 05 Sep 2024 | 04 Oct 2024 | | A.S. Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
40
| 46 | 48 | Work of interlocking tiles from Sampat Singh's house to Yatyavati's house near Shiva temple in Ward 46, Peepal Wali Colony. | 4.72 30/07/2024 | 4.72 05 Sep 2024 | 15 Oct 2024 04 Oct 2024 | | JSS Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
41
| 47 | 41 | Work of drain and interlocking tiles from Kaklu's house to Sheeshpal's house in Ward 53, Raispur. | 3.61 25/07/2024 | 3.61 05 Sep 2024 | 14 Oct 2024 04 Oct 2024 | | Vinod kumar Contr. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
42
| 49 | 50 | Work of construction of drain from Punjabi Daba to D.P. Yadav's plot in Ward 24, Shankar Vihar Lal Kuan. | 9.98 26/07/2024 | 9.98 05 Sep 2024 | 14 Oct 2024 04 Oct 2024 | | Vansh Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
43
| 50 | 45 | Road improvement work by Danes from K-24 to 37 in K-Block, Ward 67, Sanjay Nagar. | 9.38 25/07/2024 | 9.38 05 Sep 2024 | 15 Oct 2024 04 Oct 2024 | | RG BuildTech Engg. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
44
| 51 | 64 | Repair work of rain water harvesting chambers at various places in Ward 67, Sanjay Nagar P-Block. | 8.52 25/07/2024 | 8.52 05 Sep 2024 | 27 Jan 2025 09 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
45
| 52 | 44 | Road improvement work by Danes from P-139 to P-150 and P-91 to P-100 in Ward 67, Sanjay Nagar P-Block. | 9.83 25/07/2024 | 9.83 05 Sep 2024 | 15 Oct 2024 04 Oct 2024 | | R.G. Builtach Engg. Ltd. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
46
| 53 | 98 | Construction work of C.C. road and drain from primary school to Jeet's house, from Dweepchand Sharma's house to Nandu's house in Ward-31, Sihani. | 5.57 07/08/2024 | 5.57 05 Sep 2024 | 14 Oct 2024 | | Prakash Const | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
47
| 54 | 115 | Construction work of drain and interlocking tiles in Ward-32, Harvansh Nagar from Bhagwat Thekedar to Ramesh's house via Pawan's house and in Rajaram Wali Gali. | 7.75 19/07/2024 | 7.75 05 Sep 2024 | 15 Jan 2025 14 Oct 2024 | | J P Sakti | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
48
| 55 | 97 | Construction work of CC road and drain from Banwari's house to the front of Naveen Tyagi and Ishwar Tyagi's house in Ward-31, Sihani. | 1.53 12/08/2024 | 1.53 05 Sep 2024 | 04 Feb 2025 14 Oct 2024 | | Shree Balaji Enterp. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
49
| 57 | 47 | Construction work of CC road and drain from Bachpan Gift Shop to H.No.-09 in Ward-39, Rakesh Marg, R.K. Puram. | 7.71 25/07/2024 | 7.71 05 Sep 2024 | 10 Oct 2024 05 Oct 2024 | | A.S. Const. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
50
| 58 | 43 | Construction work of CC road and drain from Shri Banke Bihari Hardware Shop to Anil's house in Ward-39, Rakesh Marg, RK Puram. | 8.17 25/07/2024 | 8.17 05 Sep 2024 | 10 Oct 2024 05 Oct 2024 | | A.S. Const. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
51
| 59 | 43 | Construction work of interlocking tiles road and drain from H.No.-B/323 to Hanuman Temple in Ward-52, New Panchvati. | 9.98 18/07/2024 | 9.98 05 Sep 2024 | 05 Oct 2024 | | A.S. Const. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
52
| 63 | 74 | Patch repair work at various places in Wards 22, 33, 39 and 52 of City Zone. | 9.82 19/09/2024 | 9.82 05 Sep 2024 | 15 Oct 2024 25 Jul 2024 | | Prateek Enter. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
53
| 64 | 41 | Ward-49, work of interlocking tiles from pre-constructed drain to Diwan Farm. | 9.98 28/08/2024 | 9.98 05 Sep 2024 | 04 Oct 2024 | | Anuj kumar Contr. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
54
| 65 | 40 | Ward - 49, Work of interlocking tiles from C&D waste factory to pre-constructed drain. | 9.99 14/08/2024 | 9.99 05 Sep 2024 | 04 Oct 2024 | | Anuj kumar Contr. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
55
| 66 | 147 | Repair work through drain and C.C. in the damaged lane from Kismati Devi's house to Priya Beauty Parlour in Indra Garden, Ward-60, Shyampur Main. | 6.08 22/07/2024 | 6.08 05 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Manveer Singh Cont. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
56
| 67 | other | Work of drain and interlocking tiles in the damaged street from Choudhary Jagveer to Satyaveer Choudhary's company in Rajendra Nagar Ind. Area of ​​Ward-60, Shyampur Main. | 9.99 22/07/2024 | 9.99 05 Sep 2024 | | | | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
57
| 558 | 94 | Work of laying interlocking tiles on the road from Priya Automobile to house no. 200/2 near Ambersaria Bank in Ward 76, Vaishali. | 14.97 10/09/2024 | 14.97 19 Sep 2024 | 15 May 2025 15 Oct 2024 | | S.R.S. Buildcon | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
58
| 560 | 91 | In Ward 77 Sec 3 Vaishali, the road behind Shiv Temple and from Khushi Sweets 920 to Nikhil Egg Store 874 and from 496 to 517 and 445 to 447, road repair work with old interlocking tiles. | 14.92 10/09/2024 | 14.92 19 Sep 2024 | 15 Oct 2024 | | Mahalaxmi Infra. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
59
| 561 | 88 | Road repair work by laying interlocking tiles on the road behind Jain temple, the road between the temple and the park, and the road from the rear corner of Jain temple to Chaaya Public School and the road leading to the water tank in Ward 77 Sec 3, Vaishali. | 13.48 10/09/2024 | 13.48 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Mahalaxmi Infra. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
60
| 563 | 80 | Road repair work by laying interlocking tiles on the road from H.No. 177 to 235 and from Jitendra Singh Co. to New Hospital Road and from 69 to 91 in Ward 77 Sec 3 Vaishali. | 13.46 10/09/2024 | 13.46 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | V.K. Contr. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
61
| 564 | 183 | Construction work of damaged street by C.C. from plot no. 298 to plot no. 575 in ward 78, Shalimar Garden Ex-2. | 25.07 12/09/2024 | 25.07 09 Nov 2024 | 12 Dec 2024 12 Dec 2024 | | Maheshn Cand Contr. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
62
| 566 | 122 | Repair work of damaged road from gate no. 1 to gate no. 2 in Anukampa Green Society in ward 79 Abhay Khand 2 and from H.No. 321 to 322 and H.No. 7 in Gyan Khand 1 by Dense. | 18.19 10/09/2024 | 18.19 19 Sep 2024 | 16 Dec 2024 16 Dec 2024 | | R.G. Builtach Engg. Ltd. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
63
| 567 | 104 | In Ward 79 Nyay Khand, from H.No. 8 to H.No. 25, H.No. 1039 to H.No. 508 and H.No. 513 to 540 and other subsidiary streets, construction of drains and road improvement work through CC. | 25.68 10/09/2024 | 25.68 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | R.R. Const. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
64
| 568 | 146 | Street improvement work by laying drain and interlocking tiles in the damaged street from Nagar Dairy to A/32 in Ward 80, Rajendra Nagar. | 29.75 12/09/2024 | 29.75 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
65
| 570 | 126 | Repair work of damaged road from H.No. 570 to H.No. 720 along with green belt and adjacent to Mother Dairy booth no. 890 in ward 81 Niti Khand by DANS. | 22.93 10/09/2024 | 22.93 19 Sep 2024 | 16 Dec 2024 16 Dec 2024 | | R.G. Builtach Engg. Ltd. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
66
| 571 | 71 | Repair work of damaged road from H.No. 354 to Aman Plaza and from Guptaji Sweets Corner to Park in Ward 81, Shakti Khand 4 by Dense. | 27.70 10/09/2024 | 27.70 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
67
| 572 | 151 | Construction work of drain and damaged street by C.C. from Tavdeep's house to Movie Palace Road in Ward 82, Jawahar Park. | 10.15 12/09/2024 | 10.15 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Solanki Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
68
| 573 | 177 | Construction work of drain and damaged street through C.C. from Billu's house to Bhatna Gad School in Ward 82, Jawahar Park. | 14.23 12/09/2024 | 14.23 07 Oct 2024 | 25 Nov 2024 25 Nov 2024 | | Bijender Singh | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
69
| 574 | 179 | Construction work of drain and C.C. in the damaged street in Rasan wali gali in ward 82, Jawahar Park. | 15.73 12/09/2024 | 15.73 19 Sep 2024 | 18 Nov 2024 18 Nov 2024 | | Bijender Singh | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
70
| 683 | 155 | Road improvement through drain and C.C. in Ward-03 Vijayanagar Sector-09, from K-119A to K-135 and in the street of Maa Bhagwati General Store. | 9.67 26/07/2024 | 9.67 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Ariti Const.Co. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
71
| 684 | 156 | Repair work of damaged road from Parveen to Kishan in Ward-14 Sector-12 Sarvodayanagar by C.C. | 8.21 03/09/2024 | 8.21 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Ariti Const.Co. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
72
| 686 | 158 | Road improvement by interlocking tiles from Ward-55 D-Block H.No. 487 (Pravati) to corner of triangular park. | 9.96 05/09/2024 | 9.96 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | R.D. Enter. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
73
| 687 | 156 | Ward-62 Govindpuram C-Lock C-278 via Primary School to C-274, road improvement through drain and Dense. | 28.70 14/10/2024 | 28.70 26 Nov 2024 | 30 Dec 2025 30 Dec 2025 | | R.G. Builtach Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
74
| 575 | 154 | Dens door road improvement work of the damaged road from A-82 to 16 and A-74 in Ward 83 Shyampur X. | 17.64 12/09/2024 | 17.64 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
75
| 692 | 25 | Construction work of side track from HIG C-12 to HIG C-34 in Ward 67, Sanjay Nagar. | 6.82 21/10/2024 | 6.82 26 Dec 2024 | 26 Dec 2024 26 Dec 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
76
| 693 | 157 | Road repair work through C.C. on the damaged road from Sher Khan to Prabhas, Sachin to Naresh in Ward 58, Mawai Street No. 06. | 6.79 03/09/2024 | 6.79 26 Dec 2024 | 04 Feb 2025 04 Feb 2025 | | Vansh Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
77
| 694 | other | Road and drain repair work through C.C. on the damaged road from H.No. 173/1 to Choudhary Dham Singh, Pramod Kumar Sharma to Rajesh Master ji in Ward No. 26, Gaupuri. | 8.47 02/12/2024 | 8.47 31 Jan 2025 | | | A.H Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
78
| 696 | 32 | Tiles work near health centre/water tank in Ward-16, Sikrod village. | 4.29 05/12/2024 | 4.29 31 Jan 2025 | 26 Dec 2024 26 Dec 2024 | | Ek Danth Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
79
| 698 | 170 | Work of construction of culvert at Swadeshi Polytex Ltd. cut in Ward-65, Kavi Nagar Industrial Area. | 5.66 24/10/2024 | 5.66 31 Jan 2025 | 26 Dec 2024 26 Dec 2024 | | A.K. Contr. & Builders | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
80
| 576 | 144 | Dens door road improvement work of the damaged road from Anand Medical Store to Ambe Hospital Road in Ward 83 Shyampur X. | 20.75 12/09/2024 | 20.75 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
81
| 577 | other | In Ward 84, Raj Nagar RDC, RDC-167 to RDC-173, RDC-166 to RDC-156, RDC-173 to RDC-156, RDC-22 to RDC-12, RDC-23 to RDC-29, RDC-36 to RDC-30, RDC-42 to RDC-55, RDC-66 to RDC-56, RDC-67 to RDC-77, RDC-85 to RDC-91, RDC-144 to RDC-138, Road improvement work by DANS from RDC-92 to RDC-114, RDC-131 to RDC-137. | 22.18 10/09/2024 | 22.18 07 Oct 2024 | 16 Nov 2024 16 Nov 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
82
| 578 | 118 | Road improvement work of internal roads of Ward 84, Rajnagar Sector-10 by Dans. | 20.04 10/09/2024 | 20.04 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
83
| 579 | 173 | Construction work of drain and interlocking in the damaged street from house no. 44 to house no. 63 and from Shiv Mandir to Chhabra Tyre in ward 85, Lajpat Nagar II, street no. 2. | 27.46 12/09/2024 | 27.46 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Mohit Choudhary | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
84
| 580 | 172 | In ward 85 Lajpat Nagar, in F Block from F.131 to F.116 and F.131 to F.132 and F.61 to F.72, F.142 to S.155, F.142 to F.155 and F.122 to F.111, F.192 to F.196 and F.66 to F.21, in front of F.92 and other places, construction work by interlocking. | 13.54 12/09/2024 | 13.54 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Mohit Choudhary | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
85
| 582 | 168 | Construction of drain work by RCC from SPS Apartment to Agarwal's house in Ward 86, Rajendra Nagar. | 24.94 12/09/2024 | 24.94 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Univershal Vanchar | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
86
| 583 | 66 | In Ward-87 Nyay Khand 03, improvement work by interlocking tiles in house no. 596 to 592, house no. 501 to 512 via 480 and house no. 525G to 520 and house no. 459 to 457 and house no. 472 to 469, house no. 253 to 248 and house no. 237 via 230 to 232, house no. 821 to 800 and house no. 768 to 761 and house no. 445 to 461. | 22.58 10/09/2024 | 22.58 19 Sep 2024 | 14 Oct 2024 14 Oct 2024 | | R.R. Const. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
87
| 584 | 120 | Repair of damaged road from house no. 868 to Sneh General Store, house no. 860 to 872 and from Shiv Dairy to Vivekanand School in Ward-87, Nyay Khand 03, Indirapuram by Dense and work of interlocking tiles on side patri. | 21.51 10/09/2024 | 21.51 19 Sep 2024 | 16 Dec 2024 16 Dec 2024 | | R.G. Builtach Engg. Ltd. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
88
| 701 | 195 | Construction work of RCC wall around the garbage transfer station in Ward-44, Sanjay Colony and work of installing metro sheet from Purvanchal side. | 19.86 14/10/2024 | 19.86 31 Jan 2025 | 20 Feb 2025 20 Feb 2025 | | Solanki Const. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
89
| 704 | 190 | Work of painting, repair and laying of tiles in the health garage in Mohannagar zone. | 2.44 30/11/2024 | 2.44 26 Dec 2024 | 10 Feb 2025 10 Feb 2025 | | T.R. Enter. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
90
| 706 | 197 | Construction work of big drain through RCC from Ward-78, Shalimar Garden Ex-01 to Plot No. 842 to 846. | 21.59 14/10/2024 | 21.59 31 Jan 2025 | 21 Feb 2025 21 Feb 2025 | | Prateek Enter. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
91
| 585 | 142 | Construction of drain and interlocking tiles in front of H.No. 266 in Ward-88, Ramnagar and H.No. 13 to 17 in Vidya Vihar. R.C.C. drain work near Surya Apartment. | 15.73 12/09/2024 | 15.73 26 Nov 2024 | 30 Dec 2024 30 Dec 2024 | | A.H Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
92
| 587 | 136 | Construction work of C.C. road and drain in Ward-88, Turabnagar from H.No. 144 Rohtash to Deepak via H.No. 143, 144, 139. | 13.03 10/09/2024 | 13.03 26 Nov 2024 | 30 Dec 2024 30 Dec 2024 | | Zuber Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
93
| 588 | 150 | Construction work of C.C. road and drain in front of H.No. 64, 62, 63 in Ward-88, Gandhinagar and H.No. 259 behind temple in Ramnagar till H.No. 263 Agrawal House. | 11.17 12/09/2024 | 11.17 07 Oct 2024 | 20 Jan 2025 20 Jan 2025 | | Pramood Kumar Singhal | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
94
| 589 | 192 | Construction work of drain and C.C. road in the damaged lane from Zahid's house to Mehtab's house in Ward No. 90, Shaheed Nagar III. | 9.98 05/09/2024 | 9.98 19 Sep 2024 | 15 Feb 2025 15 Feb 2025 | | Star Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
95
| 591 | 169 | Construction work of drain and C.C. road in the damaged lane from Ali Clinic to Younis Malik's house in Ward No. 90 Shaheed Nagar III. | 9.98 05/09/2024 | 9.98 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Star Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
96
| 592 | 121 | Work of construction of park side RCC drain from KC/E-91 to KC/E-77 via KC/E-14 in Ward 91, Kavinagar C-Block. | 10.69 12/09/2024 | 10.69 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | M.S. Buildwal | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
97
| 593 | 139 | Work of repairing drain and placing drain cover on the drain from KD-25/06 to KD-83 in Ward 91, Kavi Nagar D-Block. | 11.70 12/09/2024 | 11.70 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Sakhar Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
98
| 595 | 93 | Construction work of tin shed in the community centre located in Ward-92, Islamnagar. | 21.70 10/09/2024 | 21.70 19 Sep 2024 | 14 Oct 2024 14 Oct 2024 | | Chandra Mohan Singh Raguwanshi | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
99
| 598 | 442 | Construction work of drain through RCC from house no. A-31 to house no. A-22 in Ward-94 Rampuri. | 14.58 10/09/2024 | 14.58 19 Sep 2024 | 06 Dec 2024 06 Dec 2024 | | Asutosh Kumar Cont | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
100
| 599 | 76 | Road repair work through CC on the damaged road from B-01 to B-08 in Ward 94 Suryanagar Rampuri. | 13.19 10/09/2024 | 13.19 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | V.K. Contr. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
101
| 600 | 114 | Repair of damaged road from house no. A-349 to A-366, house no. A-354 to A-351 and house no. A-339 to A-344 B in ward-94 by Dense and work of interlocking tiles on site plate. | 13.02 10/09/2024 | 13.02 07 Oct 2024 | 16 Dec 2024 16 Dec 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
102
| 601 | 73 | Repair work of damaged road from house no. A-328 to A-323A, house no. A-318B to A-310B and house no. A-314B to A-317B, from A-363 to A-360 by Dense in ward-94. | 10.61 10/09/2024 | 10.61 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
103
| 604 | 151 | Ward-96, Nehrunagar-Third F-1/13 to 1/8, construction work of drain and C.C. | 10.84 10/09/2024 | 10.84 07 Oct 2024 | 20 Jan 2025 20 Jan 2025 | | Pramood Kumar Singhal | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
104
| 605 | 127 | Work of interlocking tiles on side track from Ganesh Apartment to Balaji Apartment in Ward-96, Nehru Nagar-Second B-Block and near H.No. 167 and in front of Telephone Exchange and from Sec-B-59 to Sec-B-53. | 16.87 10/09/2024 | 16.87 19 Sep 2024 | 14 Oct 2024 14 Oct 2024 | | Pramood Kumar Singhal | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
105
| 606 | 77 | Construction of C.C. road from Chandranagar Chowk to the main gate of B.E.L. Colony in Ward-97 Chandranagar. | 12.57 10/09/2024 | 12.57 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Mahalaxmi Infra. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
106
| 607 | 89 | Construction of C.C. road from B.E.L. Colony to Ajnara in Ward-97 Chandranagar. | 13.46 10/09/2024 | 13.46 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Mahalaxmi Infra. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
107
| 608 | 87 | Construction work of CC road from Ajnara to Aditya Society in Ward-97 Chandranagar. | 13.41 10/09/2024 | 13.41 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Mahalaxmi Infra. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
108
| 609 | 94 | Construction work of CC road from Aditya Society to water tank in Ward-97 Chandranagar. | 12.99 10/09/2024 | 12.99 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | S.R.S. Buildcon | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
109
| 610 | 72 | Repair work of damaged road from Reesav Properties to Himalaya Tower and Angel Jupiter in Ward 98 Ahimsa Khand 2 by Dense | 29.77 10/09/2024 | 29.77 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
110
| 611 | 81 | Repair work of damaged road from Aditya Apartment to Windsor Apartment near Vaibhav Park roundabout in Ward 99 Vaibhav Khand by Danes. | 20.63 10/09/2024 | 20.63 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
111
| 613 | 71 | Repair work of damaged roads from Plot No. 367 to Plot No. 333 and from Plot No. 271 to Tikona Park near Cottage in Ward-100 Shipra Suncity by Dense. | 22.30 10/09/2024 | 22.30 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
112
| 614 | 103 | Repair work of damaged road in Ward 100 Vaibhav Khand 3, from Roundabout 3, Bus Stop 2 Cottage Society to Cottage Gate 3 and from Cottage Gate to Plot No. 17 and from Plot No. 17 to 47 via C-38 by Dense. | 29.56 10/09/2024 | 29.56 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
113
| 615 | 149 | Construction work of drain and C.C. road in the damaged lane from Haji Manzoor's house to Siffian Mosque in lane no. 03 in ward 90 Shaheednagar. | 9.28 05/09/2024 | 9.28 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Malik Const. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
114
| 616 | 167 | Construction work of drain and C.C. road in the damaged lane from Siffian Mosque to park in lane no. 03 in ward 90 Shahid Nagar. | 9.75 05/09/2024 | 9.75 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Star Enter. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
115
| 617 | 166 | Construction work of drain and C.C. road in damaged lanes of side lane Salim wali, Israr wali, Wasim wali and Anees Razai wali in lane no. 03 in ward 90 Shahid Nagar. | 7.82 05/09/2024 | 7.82 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Star Enter. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
116
| 618 | 96 | Work of drain construction and interlocking tiles from Rajendra Tyagi to Mullu's house and from Jaiveer Singh to Chhotu's house in Ward-32, Master Colony. | 27.40 12/09/2024 | 27.40 19 Sep 2024 | 14 Oct 2024 14 Oct 2024 | | Juber Const | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
117
| 619 | 145 | Resurfacing work on Rajnagar side service road under flyover in Ward-67, Sanjaynagar. | 9.87 05/09/2024 | 9.87 19 Sep 2024 | 04 Dec 2024 04 Dec 2024 | | R.G. Builtach Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
118
| 620 | 110 | Construction work of CC road and drain from Shailendra Tyagi's shop to Sanjeev (Jai Vishwakarma)'s shop in Ward-31, Sihani. | 6.42 10/09/2024 | 6.42 19 Sep 2024 | 14 Oct 2024 14 Oct 2024 | | Sachin Builders | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
119
| 622 | 146 | Work of drain and interlocking tiles from Bhure's house to Binder's house in Ward-30, Sadarpur. | 9.56 05/09/2024 | 9.56 07 Oct 2024 | 12 Dec 2024 12 Dec 2024 | | A.K. & Asso. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
120
| 623 | 159 | Patch repair work in the road from Neela Ghoda to Pvt. Ltd. in Ward-27, Dundahaida and in the road leading to Akbarpur Green Hotel in Ward-35. | 5.97 25/07/2024 | 5.97 19 Sep 2024 | 21 Feb 2025 21 Feb 2025 | | Shantanu Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
121
| 624 | 135 | Work of interlocking tiles in front of KB-78/03 in Ward-91, Kavinagar B-Block. | 2.01 09/09/2024 | 2.01 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | TR Enter. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
122
| 625 | 133 | Construction work of interlocking tiles and drain from Dharampal's house to Santosh Devi's house in Ward-32, Harvanshnagar. | 9.30 19/07/2024 | 9.30 19 Sep 2024 | 10 Dec 2024 10 Dec 2024 | | Zuber Const. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
123
| 626 | 136 | CC work in service lane near KF-136A in Ward-91, Kavinagar F-Block. | 3.02 03/09/2024 | 3.02 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | TR Enter. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
124
| 628 | 123 | Resurfacing work from AE-216 to AE-222 and DD-8A to DD-12A in Ward-56, Avantika I. | 9.59 05/09/2024 | 9.59 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
125
| 629 | 149 | Work of construction of culvert by removing channel near St. Paul's Academy in Ward-84, Rajnagar. | 2.45 05/09/2024 | 2.45 19 Sep 2024 | 12 Dec 2024 12 Dec 2024 | | Prakesh Const.Co. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
126
| 630 | 122 | Work of drain and footpath from KC-76 to KC-80 in Ward-91, Kavi Nagar. | 6.09 02/09/2024 | 6.09 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | M.S. Buildwal | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
127
| 633 | 126 | Work of interlocking tiles from Pappu Yadav's house to Sushil's house in Ward-42, Bamheta. | 8.35 02/09/2024 | 8.35 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
128
| 634 | 129 | Work of interlocking tiles from Arun Kumar's house to Rakesh Yadav's house in Ward-42, Bamheta. | 8.17 02/09/2024 | 8.17 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
129
| 635 | 132 | Work of drain and interlocking tiles from Ramphal's house to Babu Ali's house in Ward-42, Bamheta. | 1.88 02/09/2024 | 1.88 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
130
| 637 | 138 | Construction work of drain from house no. A/118 to house no. A/81 via A/79 in ward-39, Nehrunagar third A. | 9.60 18/09/2024 | 9.60 26 Nov 2024 | 30 Dec 2024 30 Dec 2024 | | Zuber Const. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
131
| 640 | 81 | Construction work of C.C. road from water tank to the gate of Panchavati Parivar Society in Ward-97, Chandranagar. | 13.69 17/09/2024 | 13.69 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Mahalaxmi Infra. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
132
| 641 | 92 | Repair work of damaged road from 10A/97 to near 10A/89 and from 10A/61 to near 10A/45 in Ward-61, Sector-10 by Danes. | 11.96 17/09/2024 | 11.96 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
133
| 642 | 78 | Improvement work by interlocking tiles on the damaged side track from H.No. 5/1404 to H.No. 5/1313 and along the edge of the park in Ward-54, Vasundhara Section-05. | 9.48 18/09/2024 | 9.48 19 Sep 2024 | 15 Oct 2025 15 Oct 2025 | | H.R. Builders | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
134
| 643 | 111 | Road improvement from Sona Jewellers to Diwakar Public School and in front of R Optical by Dense in Ward-83 Shyampur Ex. | 9.49 10/10/2024 | 9.49 19 Sep 2024 | 10 Oct 2024 10 Oct 2024 | | R.G. Builtach Engg. Ltd. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
135
| 644 | 100 | Improvement by Dense in front of Shiv Repair Park, Jain Kulfi Deepak Marble, Sagar Tailors and Police Post on Jindal Road in Mohan Nagar Zone. | 9.51 23/09/2024 | 9.51 19 Sep 2024 | 09 Oct 2024 09 Oct 2024 | | Maheshn Cand Contr. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
136
| 645 | 147 | Laying of interlocking tiles in the drain and damaged street from Sonu Mishra's house to Ajay Pal's house in Ward-29 Bhaupura. | 9.51 23/09/2024 | 9.51 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
137
| 646 | 139 | Construction of secondary point for C&D waste collection under Vijayanagar Zone. | 20.00 09/09/2024 | 20.00 26 Nov 2024 | 24 Dec 2024 24 Dec 2024 | | Chandra Mohan Singh Raguwanshi | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
138
| 648 | 135 | Improvement of damaged streets from B-Block B-134 to B-139 in Ward-68 Brajvihar by providing drains and interlocking tiles. | 4.67 30/09/2024 | 4.67 07 Oct 2024 | 20 Jan 2025 20 Jan 2025 | | V.K. Contr. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
139
| 649 | 146 | Patch repair on the road adjacent to Mangal Bazar and Shriram Chowk road under Indirapuram. | 9.67 05/10/2024 | 9.67 09 Oct 2024 | 21 Feb 2025 21 Feb 2025 | | A.K. Const. | POOJA SINGHJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
140
| 652 | 145 | Patch repair on the roads in front of and adjacent to Jayanti Park under Indirapuram. | 9.83 05/10/2024 | 9.83 09 Nov 2024 | 21 Feb 2025 21 Feb 2025 | | A.K. Const. | POOJA SINGHJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
141
| 653 | 150 | Work of making table top on right cuts from Mohan Nagar crossing to U.P. Gate. | 9.95 05/10/2024 | 9.95 26 Dec 2024 | 27 Feb 2025 27 Feb 2025 | | A.K. Const. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
142
| 654 | 73 | Patch repair on Ramleela route in Ward-59 Old City. | 9.34 19/09/2024 | 9.34 27 Sep 2024 | 10 Oct 2024 10 Oct 2024 | | Prateek Enter. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
143
| 655 | 128 | In Ward-40, Sahibabad village, construction of drain from Pradeep Fauji's house to RK Online Service and drain in Mangal Wali Gali and RCC drain from Rakesha Chandra to Rajkumar Rame's house and road improvement by interlocking tiles. | 3.68 27/09/2024 | 3.68 09 Nov 2024 | 30 Dec 2024 30 Dec 2024 | | Shiv Shakti Enter. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
144
| 656 | 182 | Road improvement by patch work from Shiv Mandir to 2/77 in Ward-80 Rajendra Nagar. | 8.44 23/09/2024 | 8.44 09 Nov 2024 | 12 Dec 2024 12 Dec 2024 | | Maheshn Cand Contr. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
145
| 657 | 185 | Ward-75/85 Lajpat Nagar A-253 Road improvement by patch till Laxmi Garment Police Chowki. | 8.38 23/09/2024 | 8.38 09 Nov 2024 | 12 Dec 2024 12 Dec 2024 | | Maheshn Cand Contr. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
146
| 658 | 184 | Road improvement by Dense on left side of Jindal Road, Mohan Nagar Zone. | 9.81 23/09/2024 | 9.81 09 Nov 2024 | 12 Dec 2024 12 Dec 2024 | | Maheshn Cand Contr. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
147
| 662 | 141 | Installation of drain and interlocking tiles from Avshesh Pandit to Rajkumar's house in Ward-87 Makanpur. | 13.15 23/12/2024 | 13.15 04 Feb 2025 | 04 Feb 2025 04 Feb 2025 | | Mahamaya Const.Co. | POOJA SINGHJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
148
| 663 | 142 | Construction of damaged wall of girls school in Ward-87 Makanpur. | 9.11 05/11/2024 | 9.11 04 Feb 2025 | 04 Feb 2025 04 Feb 2025 | | Mahamaya Const.Co. | POOJA SINGHJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
149
| 664 | 133 | Construction of damaged divider above the canal bridge of Ward-54 Kanawani culvert through RCC. | 5.94 08/10/2024 | 5.94 26 Nov 2024 | 20 Jan 2025 20 Jan 2025 | | I.W. Const.Co. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
150
| 665 | 154 | Footpath work near Ward-47 Shastri Nagar SB-8. | 1.57 15/10/2024 | 1.57 26 Nov 2024 | 27 Dec 2024 27 Dec 2024 | | M.S. Buildwal | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
151
| 666 | 157 | Construction of culvert at RTO Chowk in Ward-24 Bulandshahr Road and area. | 6.46 10/10/2024 | 6.46 26 Nov 2024 | 31 Dec 2024 31 Dec 2024 | | Shree Ran Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
152
| 667 | 164 | Ward-84 Rajnagar Sector-10 Repair of drain in front of GDA market. | 4.28 23/10/2024 | 4.28 04 Feb 2025 | 05 Feb 2025 05 Feb 2025 | | M.S. Buildwal | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
153
| 668 | 165 | Installation of interlocking tiles from the house of Pintu Tyagi in Ward-46 Mainapur to the main gate of Garden Enclave Tiraha. | 9.97 17/12/2024 | 9.97 04 Feb 2025 | 05 Feb 2025 05 Feb 2025 | | Mahamaya Const.Co. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
154
| 670 | 167 | Installation of drain and tiles from Kushanpal's house to Sanjay Gandhi's house in Ward-16, Sikrod village. | 9.34 05/12/2024 | 9.34 04 Feb 2025 | 11 Feb 2025 11 Feb 2025 | | A.S. Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
155
| 671 | 168 | Installation of drains and tiles from Sector-24A to Sector-17E in Ward-30 Indra Colony. | 9.98 30/11/2024 | 9.98 04 Feb 2025 | 15 Feb 2025 15 Feb 2025 | | JSS Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
156
| 672 | 169 | Construction of drain in Ward-84 Rajanagar Sector-14 GDA Market. | 6.23 09/10/2024 | 6.23 26 Nov 2024 | 15 Feb 2025 15 Feb 2025 | | B.S. Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
157
| 673 | 164 | Installation of interlocking tiles in lane no. 06 near ward-52 old Aryanagar Devi temple. | 3.32 07/12/2024 | 3.32 26 Dec 2024 | 13 Feb 2025 13 Feb 2025 | | Trinetra Infra | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
158
| 674 | 145 | Construction of road and drain through C.C. on the damaged roads from Sharma Sadan to Sadu Gurjar, Shri Radheshyam to Shri Balaji General Store, Sanjeev to Gurjar Niwas in Ward-26 Madhopura. | 8.62 03/09/2024 | 8.62 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | A.H Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
159
| 675 | 146 | Construction of road and drain through C.C. on the damaged road from Ward-26 Gaupuri H.No.-173/1 to Choudhary Dhamsingh, Pramod Kumar Sharma to Master Rajesh. | 8.47 04/09/2024 | 8.47 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | A.H Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
160
| 676 | 147 | Improvement of damaged lane/road from Monu's house to Satish Devi's house to Vedram's house in Ward-02 Siddharth Vihar, Lane No. 04 by interlocking tiles. | 10.40 23/12/2024 | 10.40 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Nirban Infra | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
161
| 677 | 148 | Construction of interlocking tiles and drain from Rinku's house to Lalit's house in Ward-02 Siddharth Vihar. | 7.88 02/09/2024 | 7.88 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Nirban Infra | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
162
| 678 | 149 | Patch repair at various places in Ward-23 Kailashnagar Ward-51, Pratap Vihar Sector-11 and Ward-55 Pratap Vihar. | 9.16 25/07/2024 | 9.16 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Shantanu Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
163
| 679 | 150 | Patch improvement work of main roads of Wards 14, 15, 26 and 58 under Vijayanagar Zone. | 9.26 25/07/2024 | 9.26 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Shantanu Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
164
| 680 | 151 | Repair of damaged road from power house to drain culvert on Plant Road in Ward-27 Dudhaida by DENSE. | 26.99 10/09/2024 | 26.99 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Shantanu Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
165
| 681 | 152 | Road improvement by patch work at various places in Ward-25 Vijayanagar Industrial Area and Ward-03. | 9.50 25/07/2024 | 9.50 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Shantanu Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
166
| 682 | 153 | Repair of damaged road from Khemchand to Ramgopal, Sharda's house to Dr. Rakesh, Kiranpal to Shripal in ward-58, Mawai through C.C. | 9.20 03/09/2024 | 9.20 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Ariti Const.Co. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
167
| 711 | 198 | Road improvement work by laying interlocking tiles and Dense on both sides from Indian Bank road and Akash Plaza to Euro Arpa in Ward-86, Rajendra Nagar Sector-05. | 9.93 10/10/2024 | 9.93 31 Jan 2025 | 25 Feb 2025 25 Feb 2025 | | R.G. Builtach Engg. Ltd. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
168
| 713 | 178 | Ward - 46 Mansi Vihar Road improvement by Dense from H.No. 159 to 151 via H.No. 144 and from H.No. 218 to 210 via H.No. 204. | 16.44 20/02/2024 | 16.44 31 Jan 2024 | 31 Jan 2025 31 Jan 2025 | | R.G. Builtach Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA 2024-25(II) |
|
169
| 714 | 31 | Repair and painting work of Shri Amarjeet's quarter in Ward-71 Sanjaynagar F-Block Tanki Compound. | 3.76 03/02/2024 | 3.76 08 Jul 2024 | 27 Aug 2024 27 Aug 2024 | | Mahalaxmi Infra. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
170
| 775 | 1 | Construction work of interlocking tiles from Ward-74 S-17 B 601 to the corner of Shaheed Bhagat Singh Park. | 6.27 05/03/2025 | 6.27 21 Mar 2025 | 24 May 2025 24 May 2025 | | J.P. Shakti Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA 2024-25(II) | Completed |
|
|
|
|
| Fund Name: 15th Finance Commission(SWM) |
|
171
| 778 | 10 | Improvement work by interlocking tiles in house no. B 133 to B-134 in B-block in Ward-97 Ramprastha. | 6.36 05/03/2025 | 6.36 21 Mar 2025 | 29 May 2025 29 May 2025 | | A.V. Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA 2024-25(II) | Completed |
|
|
|
|
|
172
| 1307 | 430100 | 1 No. - 30 HP Tube-well Installation in Kavi Nagar Zone, Ward No. 47, Mahindra Enclave. | 47.72 29/08/2024 | 47.72 | | | Gopal Electric Engineering | Pooja RaI 8178016854 Junior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
173
| 1308 | 600 | 1 No. - 30 HP Tube-well Installation in Vasundhara Sector-02A. | 47.72 29/08/2024 | 47.72 | | | Gopal Electric Engineering | Pooja RaI 8178016854 Junior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
174
| 1309 | 300 | 2870 Mtr. - HDPE pipeline Replacement (Dia-110, 160 mm) in Vasundhara Zone, Ward No. 94, Surya Nagar C-Block. | 114.52 29/08/2024 | 114.52 | | | Hanumat Enterprises | Pooja RaI 8178016854 Junior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
| Fund Name: Awasthapna |
|
175
| 1312 | 400 | 1 No. - 30 HP Tube-well Installation in Vasundhara, Sector-15 Park. | 47.72 29/08/2024 | 47.72 | | | Gopal Electric Engineering | Pooja RaI 8178016854 Junior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
176
| 1111 | 90 | Construction of Government Ayurvedic/Unani Hospital. | 60.00 23/10/2023 | 60.00 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | P.S. Consultancy | Vinod KumarJunior Engineer | Awasthapna | Completed |
|
|
|
|
| Fund Name: 15th Finance Commission(SWM) |
|
177
| 1113 | 71 | Construction work of drain for water drainage of Ward 51, Pratap Nagar Prime Minister Housing Scheme. | 58.20 22/09/2023 | 58.20 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | A.H. Cons. | SHIV KUMAR SAROJJunior Engineer | Awasthapna | Completed |
|
|
|
|
|
178
| 1114 | 75 | Construction of drain by RCC from IMS College to Road No. 04 big drain in Ward 24, Bulandshahr Road Indian Area. | 557.09 23/09/2023 | 557.09 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | DKS Infra India Pvt. Ltd. | Rajender SinghJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
179
| 1115 | 68 | Construction work of RCC drain for the damaged drain from Ward-68, Brijvihar Sai Prayas Medical Centre to D-349 and from Sri Durga Temple to Balbharati School. | 147.79 22/09/2023 | 147.79 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | Zuber Cons. | POOJA SINGHJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
180
| 1116 | 66 | Ward-78, Shalimar Garden Main, on 80 feet road from plot no. 41 to 790, construction work of residual drain and RCC drain construction work on both sides of the road from 80 feet road to Bikaner Sweets. | 228.50 22/09/2023 | 228.50 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | Malik Cons. | Vinod KumarJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
181
| 1117 | 74 | Construction of RCC drain in Ward - 59, Old City Navyug Market from Morena Gajak Shop via Ambedkar Park to GDA culvert/Atlas Cycle Shop and from Police Chowki (Allahabad Bank) to Remains Showroom. | 148.71 23/09/2023 | 148.71 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | Madan Cons. | Preeti BansalJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
182
| 1118 | 72 | Ward-67 Sanjaynagar: Construction work of damaged drain at various places from State Bank of India to Fortune Hotel via Yashoda Hospital. | 105.00 22/09/2023 | 105.00 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | Kotak Builders | Rajender SinghJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
183
| 1119 | 73 | Under Vasundhara Zone, RCC drain construction work from Sec-10 crossing the road near water tank through Sec-11 to Canal Service Road and from Mahavir Chowk to Canal Service Road, Parshuram Chowk to Canal Service Road and from Atal Chowk to Gurudwara Marg. | 467.43 23/09/2023 | 467.43 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | Shreeji Infra. Project Pvt.Ltd | POOJA SINGHJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
184
| 1120 | 69 | Construction of RCC drain from Marshall Palace to NH-9 in Ward 24 Kavi Nagar. | 82.50 22/09/2023 | 82.50 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | Kotak Builders | Rajender SinghJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
185
| 1121 | 69 | Construction of drain by RCC from Rose Valley Public School to Mangat Gurjar's house in Ward No. 1, Christian Nagar Bagu, under Vijayanagar Zone. | 31.56 23/09/2023 | 31.56 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | Keshram Cons. | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
186
| 1122 | 70 | Ward-55: Construction of RCC drain from Kuti Mandir to Krishna Park via Garhwali Park. | 36.96 23/09/2023 | 36.96 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | Keshram Cons. | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
187
| 1123 | 67 | Construction of residual drains in WAD-72 Kaushambi. | 63.00 22/09/2023 | 63.00 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | north india developers | POOJA SINGHJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
| Fund Name: 15th Finance Commission(AQI/NCAP) |
|
188
| 1124 | 70 | Ward-25 South Site GT Industrial Area: Construction of drain work by RCC from Balaji Traders to Carbon Factory big drain. | 112.75 22/09/2023 | 112.75 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | Zuber Cons. | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
189
| 1125 | 82 | Road improvement work by Danes on Rakesh Marg from Shani Mandir to GT Road. | 98.80 03/10/2023 | 98.80 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Aspiration Kansa. | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
190
| 1126 | 76 | Road repair work by Dense from Kalkagarhi Chowk to the top of the bridge via Holy Child Square. | 51.74 03/10/2023 | 51.74 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | King Cons | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
191
| 1127 | 81 | Ward-59, from Navyug Market GDA Corner via Siddharth School to Durga Bhabhi Chowk to the corner of Hapur Road Valmiki Park and the road in front of Udupi Hotel and road near Bank of India behind Ambedkar Park by Danes. | 167.00 03/10/2023 | 167.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | DKS Infra India Pvt. Ltd. | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
192
| 1128 | 64 | Improvement work of the main road from Kanavani culvert to Gurjar Chowk via Buddha Chowk under Vasundhara Zone. | 46.47 20/09/2023 | 46.47 10 Oct 2023 | 29 Nov 2023 29 Nov 2023 | | G.M. Cons. | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
193
| 1129 | 91 | Improvement work of main road from Bridge Vihar Road to Municipal Corporation Public Service Centre and Shanti Marg, Maharana Pratap Marg and from Delhi Border to near railway line in Ramprastha and Chandra Nagar under Vasundhara Zone. | 70.00 23/10/2023 | 70.00 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Shreeji Infra. Project Pvt.Ltd | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
194
| 1130 | 65 | Road improvement work through C.C. on the damaged road from Navjeevan Hospital to H.No. 8/198 Shiv Mandir in Block 8, Ward-80, Rajendra Nagar. | 48.48 20/09/2023 | 48.48 10 Oct 2023 | 29 Nov 2023 29 Nov 2023 | | Star Enterprises | Vinod KumarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
195
| 1131 | 93 | Repair work of damaged road from Gol Park to Shanti Chowk in Ward-80 and 83 Rajendra Nagar by Dense. | 55.29 23/10/2023 | 55.29 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | G.M. Cons. | Vinod KumarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
196
| 1132 | 78 | Road construction work from NH-09 to Municipal Corporation Girls Inter College in Ward 24, Mehrauli. | 59.83 03/10/2023 | 59.83 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Modern Engg. Assoc. | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
197
| 1141 | 86 | Ward-24: Road widening work from Diamond Flyover to NH-9. | 488.00 23/10/2023 | 488.00 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Shantanu Kans. | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
198
| 1142 | 51 | Road construction work from NH-09 to Tigri roundabout under Vijaynagar zone. | 309.96 01/09/2023 | 309.96 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
199
| 1143 | 52 | Repair work of damaged roads of Ward-54 Sector-03 by Danes. | 217.98 01/09/2023 | 217.98 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
200
| 1144 | 53 | Repair work of damaged road of Sunday Market in Ward-73 Shalimar Garden Ex-II by Dense. | 37.11 01/09/2023 | 37.11 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Kamlesh Engg. | Vinod KumarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
201
| 1145 | 54 | Ward-54 Vasundhara Sector-01 LIG and MIG Colony, all roads and road between LIG and MIG will be improved by Danes. | 150.00 01/09/2023 | 150.00 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
202
| 1146 | 55 | Resurfacing work in Ward-62 Govindpuram J-Block (from Maruti Washing Center to Temple, from J-127 to J-49, from J-65 to J-29, from J-09 to Park Corner, from J-87 to Park Side) | 267.90 01/09/2023 | 267.90 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
203
| 1147 | 56 | Construction work of internal road from Holy Heart School to Chowk in Ward-58 A-Block, Sector-09, Mawai Vijayanagar. | 68.95 01/09/2023 | 68.95 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | north india developers | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
204
| 1148 | 57 | Road improvement work by Danes from the road in front of Ward-14 and 58 Zonal Office and from Vikas Khari's house to B-49 and B-27 Singh House to B-34 and A-103 Charan Singh Sharma and E-160 to E-163 via Raju wali gali till E-177. | 29.97 01/09/2023 | 29.97 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Kamlesh Engg. | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
205
| 1149 | 58 | Work of resurfacing of service road from KD 16 to KD-01 in Ward-91 Kavi Nagar. | 48.14 01/09/2023 | 48.14 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Prateek Enterprises | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
206
| 1150 | 59 | Resurfacing work from Hapur Road to St. Mary's Convent School in Ward-47 Shastri Nagar. | 21.87 01/09/2023 | 21.87 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Prateek Enterprises | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
207
| 1151 | 60 | Resurfacing work in Ward-56 Avantika from Gate No. 01 through DD-162 to DD-208. | 45.77 01/09/2023 | 45.77 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Prateek Enterprises | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
208
| 1152 | 92 | In Ward-80 Rajendra Nagar, from Bazirbad Road to Ekta Park and from 150 Feet Road to S.M. World Square, the work of resurfacing the damaged road. | 72.16 23/10/2023 | 72.16 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Modern Engg. Assoc. | Vinod KumarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
209
| 1153 | 61 | In ward-61, repair work of the damaged roads in front of Subhash Park and the main road between 4B and 4C and the road behind Mewar Institute and next to 4A Kamna. | 101.95 01/09/2023 | 101.95 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | Sanjay GangwarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
210
| 1154 | 62 | Repair work of various damaged roads of Ward-15 H-Block by DANS. | 46.12 01/09/2023 | 46.12 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Prateek Enterprises | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
211
| 1155 | 63 | Construction work of approach road of dumping ground near the pipeline in Kavinagar zone. | 140.00 01/09/2023 | 140.00 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | A.K. Cons. | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
| Fund Name: Smart City |
|
212
| 1156 | 1 | Road construction work from Raj Medical Store to T.C. Institute on Nandgram Ashram Road. | 290.00 22/04/2024 | 290.00 12 May 2024 | 01 Jul 2024 01 Jul 2024 | | Shantanu Kans. | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
213
| 1265 | 308/GM(N-9)/E-Tender/2024 | Work on the Senior Care Center project. | 178.00 11/08/2023 | 178.00 01 Dec 2023 | 23 Jan 2024 23 Jan 2024 | | M/s Prem Ganga Associates, Kanpur | Jitendra JauhariJunior Engineer | Smart City | Completed |
|
|
|
|
|
214
| 1267 | other | Construction of a green crematorium in Indirapuram, Block-04. | 43.00 10/08/2022 | 43.00 25 Aug 2022 | 19 Oct 2022 19 Oct 2022 | | Arun Cons Co | POOJA SINGHJunior Engineer | Smart City | Completed |
|
|
|
|
|
215
| 1268 | 1 | Construction of smart classes in the schools of Ghaziabad Municipal Corporation. | 131.00 21/01/2023 | 131.00 05 Feb 2023 | 01 Apr 2023 01 Apr 2023 | | M/s Telecommunications Consultants India ltd | All JEJunior Engineer | Smart City | Completed |
|
|
|
|
|
216
| 1269 | 4 | Work to convert Composite School Madhuban Bapudham into Abhyudaya Composite School. | 172.00 24/06/2023 | 172.00 09 Jul 2023 | 02 Sep 2023 02 Sep 2023 | | Shakumbri Cons | Rajender SinghJunior Engineer | Smart City | Completed |
|
|
|
|
|
217
| 1270 | 3 | Work to convert Composite School Noornagar Sehani into Abhyudaya Composite School. | 164.00 24/06/2023 | 164.00 09 Jul 2023 | 02 Sep 2023 02 Sep 2023 | | Sunil Garg And Company | Preeti BansalJunior Engineer | Smart City | Completed |
|
|
|
|
|
218
| 1271 | 2 | Work on the installation of the Surya Namaskar Statue. | 26.00 15/05/2023 | 26.00 30 May 2023 | 24 Jul 2023 24 Jul 2023 | | Dynamic Association | POOJA SINGHJunior Engineer | Smart City | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
219
| 1275 | 485/GM(N-1)/E-Tender/219 | Construction of multi-level Car Parking Project in Ghaziabad. | 3883.00 08/12/2021 | 3883.00 05 Jan 2022 | 14 Mar 2022 15 Mar 2022 | | M/s Sunil Garg & Co. Ghaziabad | Jitendra JauhariJunior Engineer | Smart City | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
220
| 1294 | 57 | Work of interlocking tiles on side track from K-70 to K-43 in K-Block, Ward-96, Nehrunagar-Third. | 4.24 05/09/2024 | 4.24 09 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | R.R Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
221
| 1295 | 39 | Work of supply and spreading of sand in Ward-91, Kavi Nagar Ramlila Ground. | 4.41 02/09/2024 | 4.41 19 Sep 2024 | 09 Oct 2024 01 Oct 2024 | | R.D. Enter. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
222
| 1296 | 153 | Repair of damaged road from Khemchand to Ramgopal, Sharda's house to Dr. Rakesh, Kiranpal to Shripal in ward-58, Mawai through C.C. | 9.20 03/09/2024 | 9.20 26 Dec 2024 | 30 Jan 2025 30 Jan 2025 | | Ariti Const.Co. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
223
| 69 | 65 | Work of drain and street through CCC and culvert through RCC from the corner of Maharana Pratap Park to H.No. 88-1-1 to building no. 50 in Ward-70, Rajbagh. | 9.97 26/07/2024 | 9.97 05 Sep 2024 | 12 Nov 2024 07 Oct 2024 | | Prateek Enter. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
224
| 70 | 60 | Construction work of drain and C.C. street and R.C.C. culvert on both sides from Manish Sharma's house to Ramraj Orphanage in Ward-70, Janakpuri, Ramnagar. | 9.93 24/07/2024 | 9.93 05 Sep 2024 | 07 Oct 2024 | | Prateek Enter. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
225
| 522 | 117 | Repair work of damaged road from Jain temple to the road between Sec 10 and 12 in ward 61 Sec 10 by Danes. | 10.95 10/09/2024 | 10.95 07 Oct 2024 | 16 Dec 2024 16 Dec 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
226
| 523 | 104 | Work of interlocking tiles from C-71 to C-49 via C-59 and from C-95 to C-85 in Ward 62, RK Puram. | 27.22 10/09/2024 | 27.22 19 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | SG Enterprises | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
227
| 524 | 101 | Work of construction of RCC drain from C-257 to C-246 in Ward 62, Govindpuram C-Block, Lane No. 07. | 16.77 10/09/2024 | 16.77 19 Sep 2024 | 12 Dec 2024 14 Oct 2024 | | J.R. Builtack | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
228
| 525 | 140 | Work of drain and CC road in ward 62, Madiya village from Vijendra Singh's house via Amit Rathi's house to Sunil's house. | 12.18 10/09/2024 | 12.18 19 Sep 2024 | 12 Dec 2024 15 Oct 2024 | | Ek Danth Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
229
| 526 | 139 | Construction work by interlocking tiles in the drain and damaged street from the house of Haji Jabruddin to the house of Haji Mohd. Shahjad and from the house of Choudhary Ibrahim to the house of Salman, under ward 63. | 20.06 12/09/2024 | 20.06 19 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | Mohit Choudhary | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
230
| 527 | 140 | Construction work by interlocking tiles in the drain and damaged street from the house of Isaad to the houses of Farooq, Mansoor and Banno under ward 63. | 12.34 10/09/2024 | 12.34 19 Sep 2024 | 12 Dec 2024 14 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
231
| 530 | 136 | Construction work of drain and damaged street with interlocking tiles from Dr. Rhees's house to Sarif's house in Ward 64 Garima Garden. | 17.27 12/09/2024 | 17.27 19 Sep 2024 | 15 Feb 2025 14 Oct 2024 | | Anuj kumar Contr. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
232
| 531 | 107 | Road improvement work by DANS from KH-124 to KH-107 and KH-92 to KH-70 in Ward 65, Kavi Nagar H-Block. | 21.13 10/09/2024 | 21.13 19 Sep 2024 | 14 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
233
| 532 | 111 | Road improvement work by DANS in Ward 65, Kavi Nagar H-Block from KH-145 to KH-135, KH-263 to KH-247, KH-183 to KH-171, KH-220 to KH-198, KH-170 to KH-156. | 26.38 10/09/2024 | 26.38 19 Sep 2024 | 14 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
234
| 533 | 141 | Road improvement work by DANS from KH-41 to Railway Ring Road in Ward 65, Kavi Nagar H-Block. | 14.24 10/09/2024 | 14.24 19 Sep 2024 | 15 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
235
| 534 | 175 | Improvement work of damaged street from Chaudhary Medical Store to Chaudhary Mustakim's house under Ward No. 66 by providing drain and interlocking. | 13.27 12/09/2024 | 13.27 19 Sep 2024 | 12 Nov 2024 15 Oct 2024 | | Mohit Choudhary | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
236
| 535 | 164 | Improvement work of the damaged lane from Rahisu's house to Niaz Bhai's house and from Feuji's house to Dr. Nura and from Rajkumar's house to Nasir's house under ward 66 by providing drain and interlocking tiles. | 20.40 12/09/2024 | 20.40 19 Sep 2024 | 12 Dec 2024 15 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
237
| 72 | 70 | Repair work through drain and C.C. in the damaged street from the temple to Ramveer's house in Jal Nigam Colony, Ward-60, Shyampur Main. | 8.42 26/07/2024 | 8.42 05 Sep 2024 | 28 Nov 2024 07 Oct 2024 | | Akruti Const. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
238
| 536 | 138 | Improvement work of damaged street from Deen Maulana's house to Zahid's house under ward 66 by providing drain and interlocking tiles. | 16.47 12/09/2024 | 16.47 19 Sep 2024 | 14 Oct 2024 | | Anuj kumar Contr. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
239
| 537 | 119 | Construction work of RCC drain from J-373 to J-421 and J-514 to J-600 in Ward 67, Sanjay Nagar J-Block. | 14.96 10/09/2024 | 14.96 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
240
| 538 | 107 | Improvement work by interlocking tiles in the damaged lanes from single story C-113 to C-130 and C-81 to C-85 in Ward-68 Brajvihar. | 11.19 10/09/2024 | 11.19 19 Sep 2024 | 30 Dec 2024 15 Oct 2024 | | V.K. Contr. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
241
| 540 | 132 | Work of drain and C.C. in service lane from C-78 to C-154 in Ward-69, Lohianagar C-Block and work of drain and interlocking tiles from Golden Bakery to Saini Compound and in front of Deepak Tyagi in C-Block. | 16.36 10/09/2024 | 16.36 19 Sep 2024 | 07 Jan 2025 14 Oct 2024 | | Modern Const.Co. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
242
| 541 | 06-12-2024 | Work of drain and C.C. road in Ward-69, Lohianagar Lal Quarter from H.No.-53/1 to 53/8 and H.No.-3/1 to 1/1 and H.No.-2/8 to 6/1 and H.No.-8/1 to 8/8. | 11.36 10/09/2024 | 11.36 07 Oct 2024 | 23 Mar 1900 09 Dec 2024 | | A.V. Enter. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
243
| 73 | 68 | Work of interlocking tiles in the damaged street from Sanjay's house to Narendra's house in Durga Colony, Ward-60, Shyampur Main. | 6.29 26/07/2024 | 6.29 05 Sep 2024 | 07 Oct 2024 | | JSS Const. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
244
| 543 | 160 | Ward 70, Janakpuri A Block, lane no. 4, from A-94 to Raj Bahadur's house to Jagriti Public School and from Councilor's office Manjeet Rana's house to Vishwakarma's house, construction work of drain and C.C. lane. | 29.76 12/09/2024 | 29.76 19 Sep 2024 | 15 Oct 2024 | | Prateek Enter. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
245
| 544 | 115 | Road improvement work by Danes in Ward 71, Sanjay Nagar E-Block from E-106 to E-116, E-131 to E-116, E-132 to E-150, E-190 to E-95. | 14.27 10/09/2024 | 14.27 19 Sep 2024 | 15 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
246
| 545 | 117 | Road improvement work by DANS from E-569 to Forest Department office in Ward 71, Sanjay Nagar. | 12.12 10/09/2024 | 12.12 19 Sep 2024 | 15 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
247
| 546 | 127 | Repair of damaged road from house no. B-57 to house no. B-49 in Radha Krishna Society, Ward-72, Kaushambi through Dense and work of interlocking tiles on side patri. | 14.68 10/09/2024 | 14.68 21 Oct 2024 | 16 Dec 2024 16 Dec 2024 | | Arun Const.Co. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
248
| 549 | 143 | Ward-72 Vaishali Sector-01: Repair work of damaged road from Thursday to transformer by Dense. | 13.74 10/09/2024 | 13.74 07 Oct 2024 | 20 Feb 2025 | | Prateek Enter. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
249
| 74 | 62 | Repair work through drain and C.C. in the damaged street from Sanjay Sharma's house to Israr's house in Rajiv Colony, Shyampur Main, Ward-60. | 5.06 26/07/2024 | 5.06 05 Sep 2024 | 07 Oct 2024 | | Akruti Const. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
250
| 550 | 155 | Construction work of drain and damaged street through C.C. from S.K. Sharma's house to C-43 in Ward 73, Shalimar Garden Ex-1. | 26.53 12/09/2024 | 26.53 19 Sep 2024 | 12 Nov 2024 15 Oct 2024 | | Univershal Vanchar | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
251
| 551 | 145 | Construction work of drain and damaged street through CC from Nathulal's house to SK Sharma in Ward 73, Shalimar Garden Ex-1. | 23.47 12/09/2024 | 23.47 19 Sep 2024 | 12 Nov 2024 15 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
252
| 552 | 132 | In Ward-74 Sec-15 Vasundhara, repair work of damaged wall from house no. 15/1100 to house no. 15/1146 and construction work of interlocking tiles from house no. 15/1131 to house no. 15/1127. | 10.94 10/09/2024 | 10.94 07 Oct 2024 | 30 Dec 2024 30 Dec 2024 | | V.S. Buildcon.Co. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
253
| 553 | 84 | Repair work of damaged road from house no. C-18 to C-31 in ward-74 by Dense. | 13.67 10/09/2024 | 13.67 19 Sep 2024 | 22 Nov 2024 15 Oct 2024 | | Prateek Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
254
| 554 | 65 | Construction work of damaged interlocking tiles in Ward-74 to 13, from house no. 13/394 to house no. 403 and house no. 389 to 388 and house no. 13/335 to 13/356 and house no. 13/332. | 10.81 10/09/2024 | 10.81 19 Sep 2024 | 06 Nov 2024 14 Oct 2024 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
255
| 555 | 85 | Repair of damaged road from 6/210 to 6/225 in Ward-74 Sec-06 Vaishali by Dense and work of interlocking tiles on site plate. | 14.55 10/09/2024 | 14.55 19 Sep 2024 | 22 Nov 2024 15 Oct 2024 | | Prateek Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
256
| 556 | 157 | Construction work of damaged street through C.C. from D-173 to D 132, D 200 to D 137, D 196 to D 180, D 330 to 84, D 115 to D 21, D 113 to D 24 and D 176 to D 57, near power house in D Block, Ward 75, Lajpat Nagar. | 20.18 12/09/2024 | 20.18 19 Sep 2024 | 18 Jan 2025 15 Oct 2024 | | S.R.S. Buildcon | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
257
| 75 | 61 | Construction work of drain and CC road in the street from Arif's house to Premvati's house in Ward-34, Shaheednagar First. | 4.46 26/07/2024 | 4.46 05 Sep 2024 | 20 Jan 2025 07 Oct 2024 | | H.R. Builders | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
258
| 311 | 42 | Ward-25, Repair and painting work of Ramlila Ground. | 4.32 18/09/2024 | 4.32 19 Sep 2024 | 08 Oct 2024 01 Oct 2024 | | Keshram Const. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
259
| 312 | 35 | Repair and painting work of Ramlila Ground near Tanki Complex in Ward-55, C-Block. | 2.10 18/09/2024 | 2.10 19 Sep 2024 | 03 Oct 2024 01 Oct 2024 | | Jai Shanidev Const | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
260
| 313 | 36 | Repair and painting work of Ramlila Ground in Ward-51, Pratap Vihar E-Block. | 1.38 18/09/2024 | 1.38 19 Sep 2024 | 03 Oct 2024 01 Oct 2024 | | Jai Shanidev Const | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
261
| 314 | 37 | Repair and painting work of Ramlila Ground near Tanki Complex, Ward-51. | 2.45 18/09/2024 | 2.45 19 Sep 2024 | 03 Oct 2024 01 Oct 2024 | | Jai Shanidev Const | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
262
| 315 | 51 | Repair and painting work of Ward-71 Sanjay Nagar Ramlila Ground. | 5.74 11/09/2024 | 5.74 19 Sep 2024 | 09 Oct 2024 08 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
263
| 316 | 38 | Repair and painting work of Ramlila Ground and Arya Samaj Temple park in Ward-84 Rajnagar Sector-10. | 6.82 11/09/2024 | 6.82 19 Sep 2024 | 05 Oct 2024 01 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
264
| 317 | 33 | Work of repair and painting etc. of Chhath Ghat located at various places under Vasundhara Zone. | 9.52 17/09/2024 | 9.52 19 Sep 2024 | 11 Nov 2024 05 Oct 2024 | | A H Const | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
265
| 318 | 43 | Under Vijayanagar Zone, Ward-07, Sudamapuri C-Block Balaji Temple, A/600 Tikona Park, in front of Sarvodaya Inter College (Mata Ahilyabai Holkar Park), Ward-15, K Block Temple Park, L-Block Ram Janaki Park, Ward-27 Shanti Nagar Near Water Tank, Ward-35, Shiv Temple and Radha Krishna Temple Complex and Ward-58 A-Block A-491 Park, repair and painting work of Chhath Ghats built earlier. | 2.34 18/09/2024 | 2.34 19 Sep 2024 | 08 Oct 2024 01 Oct 2024 | | Manveer Singh Cont. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
266
| 76 | 63 | Construction work of drain and CC road in the street from Haji Akbar's house to Budhba's house in Ward-34, Shaheednagar I. | 4.92 26/07/2024 | 4.92 05 Sep 2024 | 12 Nov 2024 07 Oct 2024 | | H.R. Builders | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
267
| 77 | 67 | Work of drain and interlocking tiles in the kutcha lane from Amrish's house to Nanak's house in lane no. 10 of Rajiv Colony, Bhaupura, ward-20. | 5.64 15/12/2023 | 5.64 05 Sep 2024 | 12 Nov 2024 07 Oct 2024 | | Mohit Choudhary | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
268
| 78 | 141 | Ward - 10, Pappu Kalani, Street No. 06, from Yashpal Pehalwan's house to Mahendra Singh Parcha's house, drain and C.C. work. | 9.67 25/06/2024 | 9.67 05 Sep 2024 | 14 Oct 2024 14 Oct 2024 | | A.S. Const. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
269
| 79 | 158 | Ward - 10, Pappu Kalani, Street No. 06, from Jagpal's house to Yashpal's house, drain and CC work. | 9.85 28/06/2024 | 9.85 05 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | A.S. Const. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
270
| 80 | 163 | Ward - 10, Pappu Kalani, Street No. 06, from Subodh Das's house to Jagpal's house, drain and CC work. | 9.32 01/07/2024 | 9.32 05 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | A.S. Const. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
271
| 81 | 66 | Work of boundary wall of vacant land of Municipal Corporation near Chikamberpur GT Road Shahidnagar Metro Station and Shani Temple, Ward-34, Shahidnagar First. | 14.90 02/08/2024 | 14.90 05 Sep 2024 | 15 Oct 2024 07 Oct 2024 | | Mohit Choudhary | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
272
| 82 | 70 | Patch repair work in Ward-22, Industrial Area Amrit Steel Compound. | 9.75 25/07/2024 | 9.75 05 Sep 2024 | 15 Oct 2024 10 Oct 2024 | | Prateek Enter. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
273
| 83 | 44 | Work of drain and interlocking tiles from Nutan's house via Horam's house to Diamond Steel shop in Ward-02, Siddharth Vihar. | 17.35 13/06/2024 | 17.35 05 Sep 2024 | 28 Nov 2024 01 Oct 2024 | | Satnam Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
274
| 84 | 38 | Ward-55, in front of Kuti Ashram, from Radha Sweets to the corner of the park (H.No. 288) and from B-338 to Satnam Halwai, repair work of interlocking tiles. | 10.00 05/09/2024 | 10.00 05 Sep 2024 | 08 Oct 2024 01 Oct 2024 | | Pragati Enterprises | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
275
| 85 | 39 | Construction work of interlocking tiles from Balaji Stationery to Garhwali Park and on the tank side (side track) in front of Kuti Ashram in Ward-55, D-Block. | 6.73 05/09/2024 | 6.73 05 Sep 2024 | 07 Oct 2024 01 Oct 2024 | | Pragati Enterprises | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
276
| 86 | 41 | Drain construction work in H.No. 205 to 260, H.No. 450 to 435, H.No. 451 to 466 and H.No. 546 to 335 in Ward-55, D-Block. | 9.22 05/09/2024 | 9.22 05 Sep 2024 | 01 Oct 2024 | | Keshram Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
277
| 87 | 40 | Drain construction work in H.No. 188 to 196, H.No. 200 to 197, H.No. 522 to 511 and H.No. 499 to 377 in Ward-55, D-Block. | 9.38 05/09/2024 | 9.38 05 Sep 2024 | 08 Oct 2024 01 Oct 2024 | | Keshram Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
278
| 88 | 125 | Road improvement work through drain and CC from Surjeet's house to Sundar's house in Ward-03, Vijaynagar Sector-09. | 7.85 26/07/2024 | 7.85 05 Sep 2024 | 27 Jan 2025 24 Dec 2024 | | Jaiveer Singh Contr. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
279
| 90 | 133 | Construction work of CC road and drain from Bunty's shop to Bhavani Auto Mobile via Sharma's house in lane no. 3 in Ward-25, Ambedkar Nagar. | 8.19 26/07/2024 | 8.19 26 Nov 2024 | 24 Dec 2024 | | Pardhan Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
280
| 91 | 77 | Road improvement work by providing drain and interlocking tiles on the damaged road from Pratap's house to Darogaji's house in Ward-27, San Vihar. | 9.54 13/06/2024 | 9.54 05 Sep 2024 | 26 Nov 2024 14 Oct 2024 | | Chandra Mohan Singh Raguwanshi | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
281
| 92 | 76 | Work of tiles and drain construction in Ward-27, San Vihar Street No.-08. | 9.84 24/07/2024 | 9.84 05 Sep 2024 | 10 Dec 2024 14 Oct 2024 | | Pragati Enterprises | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
282
| 93 | 45 | Road improvement work by laying interlocking tiles on the damaged road from Sadi Mahal to Mahesh's house in Ward-02, Rahul Vihar under Ward-53, Vijay Nagar Zone. | 14.43 31/10/2024 | 14.43 05 Sep 2024 | 14 Oct 2024 01 Oct 2024 | | Satnam Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
283
| 95 | 49 | Work of interlocking tiles in Ward-53, Raispur Ambedkar School. | 9.01 24/07/2024 | 9.01 05 Sep 2024 | 14 Oct 2024 04 Oct 2024 | | AKG Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
284
| 96 | 92 | Work of drain and interlocking tiles from Lachhi Yadav's house to Raj Kumar's house and from Tiwari Jahi's house to Seva Bharti office in Ward-35, Akbarpur Bahrampur. | 29.76 08/02/2024 | 29.76 07 Oct 2021 | 10 Dec 2024 | | Pream Const. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
285
| 97 | 46 | Work of interlocking tiles on the road leading to garbage factory behind C&D Waste Plant, Ward - 17. | 18.59 04/09/2024 | 18.59 05 Sep 2024 | 14 Oct 2024 05 Oct 2024 | | Pramood Kumar Singhal | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
286
| 98 | 45 | Work of interlocking tiles from Ward - 17, Garbage Factory to C&D Waste Plant behind street. | 18.76 04/09/2024 | 18.76 05 Sep 2024 | 17 Jan 2025 05 Oct 2024 | | Satnam Const. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
287
| 99 | 42 | Work of construction of culvert in front of Milan Sweets in Ward-67, Sanjay Nagar. | 4.92 26/07/2024 | 4.92 05 Sep 2024 | 02 Dec 2024 04 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
288
| 100 | 43 | Road improvement work by Danes from P-175 to P-183 and P-163 to P-135 in Ward-67, Sanjaynagar P-Block. | 9.91 24/07/2024 | 9.91 05 Sep 2024 | 04 Oct 2024 | | R.G. Builtach Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
289
| 101 | 68 | Construction work of pink toilet under the park at the Municipal Corporation Headquarters. | 18.10 10/09/2024 | 18.10 05 Sep 2024 | 09 Oct 2024 | | Chandra Mohan Singh Raguwanshi | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
290
| 102 | 99 | Ward-01, Bhim Nagar Street No. 08, from Dev Karan to Sanjeev, Omvir to Rajpal, damaged road, repair of drains and C.C. road improvement work. | 6.52 03/09/2024 | 6.52 07 Oct 2024 | 13 Dec 2024 10 Dec 2024 | | Pradhan Contr. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
291
| 103 | 97 | Repair of drain and improvement of damaged road from Murari Lal to Dev Karan in Ward-01, Bhim Nagar Street No. 08 by C.C. road. | 8.57 04/09/2024 | 8.57 07 Oct 2024 | 13 Dec 2024 10 Dec 2024 | | Pradhan Contr. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
292
| 104 | 57 | Road improvement work by interlocking tiles from Jaipal to Jaiveer Pal in Ward-01, Bhimnagar Bali No.-08. | 5.44 04/09/2024 | 5.44 09 Sep 2024 | 10 Oct 2024 | | J P Sakti | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
293
| 105 | 58 | Road improvement work by interlocking tiles from Ompal to Khub Singh in Ward-01, Bhimnagar Gali No.-08. | 3.50 04/09/2024 | 3.50 09 Sep 2024 | 10 Oct 2024 | | J P Sakti | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
294
| 106 | 128 | Repair work of drain and improvement of damaged road through C.C. road from Manoj to Devendra Bhagat in Ward-01, Christian Nagar Bagu E Block, Street No.01. | 5.88 04/09/2024 | 5.88 16 Dec 2024 | 03 Jan 2025 24 Dec 2024 | | Nirban Infra | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
295
| 107 | 69 | Repair of drains and C.C. road repair work on damaged road from Satnam and Chaudhary Chatar Singh, Ravindra Chauhan to Tarun Kumar in Ward-01, Krishna Nagar Bagu. | 6.56 04/09/2024 | 6.56 09 Sep 2024 | 10 Oct 2024 | | Nirban Infra | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
296
| 108 | 56 | Construction work of RCC drain from Rana Dairy to K/11 on Ward-03, Thana Road. | 6.32 03/09/2024 | 6.32 09 Sep 2024 | 10 Oct 2024 | | J.P. Shakti Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
297
| 109 | 55 | Construction of drain from Rakesh's house to Laxmi Dairy via Chhajju Singh in Ward-03, Purana Vijayanagar | 6.86 03/09/2024 | 6.86 09 Sep 2024 | 10 Oct 2024 | | J.P. Shakti Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
298
| 110 | 110 | Work of drain construction till Pradeep’s house Jatin Footwear in Ward-03, Purana Vijayanagar. | 6.45 03/09/2024 | 6.45 07 Oct 2024 | 10 Dec 2024 | | J.P. Shakti Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
299
| 111 | 113 | Construction of C.C. road and drain in Ward-03, Purana Vijayanagar from Ram Bahadur to Chandrapal and from Satendra's house via Murali's house to Agnihotri's house. | 4.53 03/09/2024 | 4.53 07 Oct 2024 | 10 Dec 2024 | | J.P. Shakti Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
300
| 112 | 112 | Drain and CC road improvement work from Inspector's house to Dulichand's house in Ward-03, Old Vijayanagar. | 9.83 27/08/2024 | 9.83 07 Oct 2024 | 10 Dec 2024 | | J.P. Shakti Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
301
| 114 | 48 | Construction work of interlocking tiles road and drain from Munna Khan's house (Madar Meri Wali Gali) to Raju Kori's house and from Nirjan Kapde Walo to Rathore Chaat Wale in Ward-04, Mata Colony. | 9.97 09/09/2024 | 9.97 09 Sep 2024 | 14 Oct 2024 08 Oct 2024 | | Pragati Enterprises | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
302
| 121 | 78 | Construction work of drain from Yogendra's house to Prakash's house in ward no. 05 Gagan Vihar and laying of interlocking tiles in the damaged street. | 8.95 05/09/2024 | 8.95 09 Sep 2024 | 04 Dec 2024 08 Oct 2024 | | Abad Const | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
303
| 123 | 78 | Work of construction of drain and interlocking tiles from Ajay to Ramesh in Ward-07 Sudamapuri D-Block. | 9.57 04/09/2024 | 9.57 27 Sep 2024 | 23 Jan 2025 14 Oct 2024 | | Abad Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
304
| 125 | 59 | Road improvement work by interlocking tiles on the damaged road from Dr. L.L. Sharma to Mithlesh, Nandi Lal to Prithvi in ​​Ward-07 Ardash Colony. | 7.59 03/09/2024 | 7.59 27 Sep 2024 | 02 Jan 2025 14 Oct 2024 | | Abad Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
305
| 126 | 60 | Road improvement work by interlocking tiles on the damaged road from Prithvi to Tewatia, Ashu to Kiran, Nandi Lal to Sonu in Ward-07 Adarsh ​​Colony. | 9.78 02/09/2024 | 9.78 27 Sep 2024 | 02 Jan 2025 14 Oct 2024 | | Abad Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
306
| 127 | 95 | Road improvement work by interlocking tiles on the damaged road from B.S.Tomar to Shiv Vihar square, behind Shri Ram temple in Ward-07, Shiv Vihar and work of laying RCC culvert in front of Prashant General Store, Vishnu. | 8.77 03/09/2024 | 8.77 07 Oct 2024 | 11 Dec 2024 10 Dec 2024 | | A.P Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
307
| 128 | 141 | Construction work of CC road and drain in the service line behind house no. 51 from SL Agarwal to Subhash Kansal in Ward-08, Laxmi Vihar Colony. | 8.20 05/09/2024 | 8.20 09 Sep 2024 | 30 Dec 2024 30 Dec 2024 | | Vinod kumar Contr. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
308
| 129 | 55 | Construction work of CC road and drain in Ward-08, Laxmi Vihar, near the triangular park, in front of Pramod Kumar and in front of Agarwal. | 7.37 05/09/2024 | 7.37 09 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | Vinod kumar Contr. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
309
| 132 | 88 | Work of making ramp in front of Aggarwal Sweets and near Ekta Park under Ward 10. | 2.22 05/09/2024 | 2.22 09 Sep 2024 | 12 Nov 2024 08 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
310
| 133 | 67 | Work of drain and interlocking tiles from Kanti Sharma to Adesh Tyagi and from Inam's house to Gaje Sharma's house in Ward-11, Nandgram Sangam Vihar. | 9.25 05/09/2024 | 9.25 09 Sep 2024 | 09 Oct 2024 | | A.H Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
311
| 134 | 112 | Work of drain and interlocking tiles in front of Himanshu Tyagi's house in Ward-11, Krishnakunj and from Rohela to behind Takshila School. | 7.96 05/09/2024 | 7.96 09 Sep 2024 | 30 Nov 2024 14 Oct 2024 | | Nirban Infra | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
312
| 136 | 124 | Ward-12, Hardev Sarai: Construction of drain and C.C. road from H.No.-95 and Jain sahab's house via Pankaj Tyagi to Virendra's shop. | 8.87 05/09/2024 | 8.87 28 Sep 2024 | 28 Nov 2024 14 Oct 2024 | | Shyama Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
313
| 137 | 119 | Construction of C.C. road and drain in ward-12, Kasyawan from Musharraf's house via Aslam to Imran, via Jameel to Bhuura to Adil and from Nazim to Kasam. | 8.82 05/09/2024 | 8.82 09 Sep 2024 | 28 Nov 2024 14 Oct 2024 | | A P Const | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
314
| 138 | 140 | Construction work of drain and CC road from the house of Shri Om Prakash Giri to the house of Shri Shankar Jha in Ward-14, Sector-12 Sarvodaya Nagar. | 6.33 03/09/2024 | 6.33 26 Nov 2024 | 30 Dec 2024 24 Dec 2024 | | A.S. Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
315
| 139 | 94 | Ward-14 Sarvodayanagar Street No. 08: Construction work of drain and CC road from Shri Baburam Sanger's house to I India Mart. | 9.96 10/09/2024 | 9.96 07 Oct 2024 | 30 Dec 2024 10 Dec 2024 | | Manveer Singh Cont. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
316
| 141 | 58 | Ward-17, Sevanagar Vishwakarma Marg: Work of drain and interlocking tiles from Neeraj to Kishore's house via Brij Kishore's house and till Vishwakarma main road. | 9.85 05/09/2024 | 9.85 09 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | Pramood Kumar Singhal | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
317
| 143 | 62 | Work of drain and interlocking tiles from Nagendra Chaudhary's house to Lokesh Pandit's house in Ward 18, Rajapur. | 7.47 03/09/2024 | 7.47 09 Sep 2024 | 09 Oct 2024 | | JSS Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
318
| 144 | 67 | Work of drain and interlocking tiles in Pramod Wali Gali and Deepak Moodi Wali Gali in Ward 18, Rajapur. | 3.85 03/09/2024 | 3.85 09 Sep 2024 | 15 Feb 2025 09 Oct 2024 | | Raguwanshi Builtack | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
319
| 145 | 61 | Work of drain and interlocking tiles from Yad Ram's house to D P's house and in Sudhir's street in ward 18, Rajapur. | 2.74 03/09/2024 | 2.74 09 Sep 2024 | 22 Jan 2025 09 Oct 2024 | | A3R Ent | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
320
| 146 | 58 | Work of drain and interlocking tiles from Gulshan's house to A-168 in Ward 18, Bagwali Colony. | 4.55 03/09/2024 | 4.55 09 Sep 2024 | 22 Jan 2025 09 Oct 2024 | | A3R Ent | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
321
| 148 | 61 | Ward-19, Jagdish Nagar Tyre Market, R.K. Construction of interlocking tiles from Rubber to Meena's house. | 9.76 05/09/2024 | 9.76 09 Sep 2024 | 09 Oct 2024 | | Mahima Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
322
| 149 | 74 | Construction work of drain and interlocking tiles in the damaged street from Jai Singh's house to Balram Kasana's house in Ward 20 Bhaipura. | 5.69 05/09/2024 | 5.69 09 Sep 2024 | 08 Oct 2024 | | Global Engg. & Infra. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
323
| 151 | 137 | Construction work of interlocking tiles on site plate in KV Block in Ward-21 Bhowapur. | 9.24 05/09/2024 | 9.24 07 Oct 2024 | 24 Jan 2024 24 Jan 2024 | | Mahalaxmi Infra. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
324
| 152 | 97 | Improvement work through drain and CC road in the damaged street from Dinesh Pandit's house to Rinku Pandit's house in Ward-21 Bhowapur. | 6.19 05/09/2024 | 6.19 27 Sep 2024 | 06 Nov 2024 15 Oct 2024 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
325
| 153 | 90 | Improvement work through drain and CC road in the damaged street from Bablu's house to Pappu's house and from Satte's house to Vijay Singh's house in Ward-21 Bhowapur. | 4.57 05/09/2024 | 4.57 09 Sep 2024 | 28 Nov 2024 15 Oct 2024 | | Mahalaxmi Infra. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
326
| 154 | 108 | Improvement work through drain and CC road in the damaged street from Sumit's house to Omi's house and from Satte's house to Satish's house and from Devendra to Shivam Deda in Ward-21 Bhowapur. | 8.14 05/09/2024 | 8.14 09 Sep 2024 | 05 Nov 2024 15 Oct 2024 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
327
| 159 | 109 | Work of construction of interlocking tiles road and drain from Mehru's house to Akbar's house in Ward-23, Kaila Kheda. | 8.39 27/08/2024 | 8.39 07 Oct 2024 | 13 Dec 2024 10 Dec 2024 | | J.P. Shakti Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
328
| 160 | 118 | Construction work of interlinking tiles road and drain construction in Salman Kinnar Wali Gali from Noorhasan to temple, Titu to Balkishan and various lanes in Ward-23, Kaila Kheda. | 8.43 27/08/2024 | 8.43 07 Oct 2024 | 10 Dec 2024 | | J.P. Shakti Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
329
| 161 | 115 | Work of construction of CC road and drain from Anil Sagar to Shanti Kunj in Ward-23, Kailashnagar Street No.7. | 3.16 03/09/2024 | 3.16 07 Oct 2024 | 27 Dec 2024 10 Dec 2024 | | J.P. Shakti Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
330
| 162 | 117 | Construction work of CC road and drain in Ward-23, Kailashnagar, from Bhola Prajapati to Rajesh Prajapati, from Gyani via Sunil to Rajesh's house and from Sanjay Kirana Store to Hina. | 6.44 06/09/2024 | 6.44 07 Oct 2024 | 27 Dec 2024 10 Dec 2024 | | J.P. Shakti Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
331
| 163 | 133 | Work of drain and interlocking tiles from Aziz's house to Sheeshpal's house in Ward 24, Bayana village. | 3.79 03/09/2024 | 3.79 27 Sep 2024 | 12 Dec 2024 15 Oct 2024 | | Vansh Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
332
| 165 | 150 | Repair work of drain and interlocking tiles in Ward 24, Mehrauli Village, from Bittu's house via Satveer's shop to Rogan Pal's house. | 3.67 03/09/2024 | 3.67 07 Oct 2024 | 12 Dec 2024 12 Dec 2024 | | Trinetra Infra | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
333
| 166 | 141 | Work of drain and interlocking tiles from Beni's Dairy to Rajpal's house in Ward 24, Mehrauli Village. | 5.80 03/09/2024 | 5.80 07 Oct 2024 | 21 Feb 2025 07 Oct 2024 | | Marden Const.Co. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
334
| 167 | 137 | Work of drain and interlocking tiles from Sarfaraz's house to Ilyash's house in Ward 24, Bayana. | 7.01 03/09/2024 | 7.01 09 Sep 2024 | 15 Oct 2024 | | Chandra Mohan Singh Raguwanshi | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
335
| 168 | 160 | Construction work of C.C. road and drain in Ward No. 11, Ambedkar Nagar, from Munni Devi's house to Hari's house in Street No. 16, from Shobha Devi's house to Vinod Kumar's house via Arvind's house in Street No. 15. | 9.96 03/09/2024 | 9.96 10 Feb 2025 | 12 Mar 2025 28 Feb 2025 | | Keshram Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
336
| 169 | 79 | Work of interlocking tiles on the side track of the road from in front of house no. D/78 in Ward-25, on three sides of F-Block park and from in front of house no. B/122 to house no. B/54 in B-Block. | 3.87 03/09/2024 | 3.87 09 Sep 2024 | 26 Nov 2024 14 Oct 2024 | | Trinetra Infra | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
337
| 170 | 47 | Ward - 25, from Vinod Kumar Advocate to Satyacharan (Ashram Wali Gali), Vashisht Shishu Mandir Gali and the lane behind Shankar's shop, work of drain and interlocking tiles and work of interlocking tiles on both sides of the side track of the road in front of Rosewell School. | 9.99 09/09/2024 | 9.99 09 Sep 2024 | 14 Oct 2024 08 Oct 2024 | | Nikhil Asso. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
338
| 171 | 82 | Work of interlocking tiles on the side track outside Ramlila Ground, Ward-25. | 6.45 03/09/2024 | 6.45 09 Sep 2024 | 10 Dec 2024 14 Oct 2024 | | Pragati Enterprises | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
339
| 172 | 134 | Construction work of C.C. road and drain in lane no. 05 from Jeet Bag House to Lali's house in ward-25, Ambedkar Nagar, lane no. 13 from Manoj Dhol Wala to Ramesh Chand. | 4.51 02/09/2024 | 4.51 26 Nov 2024 | 24 Dec 2024 | | Pardhan Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
340
| 174 | 81 | Road and drain improvement work by C.C. on the damaged road from Nach Bharat Tent House to Ghaziabad Convent School and subsidiary lane in Ward No. 26, Bhud-Bharat Nagar. | 4.00 03/09/2024 | 4.00 27 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | Sidh Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
341
| 175 | 83 | In ward no. 26, Madhopura, from Shivcharan to Bichhu Gurjar, Chamunda temple to Jagdish Jain, Chamunda temple to Shani temple, damaged road is repaired with C.C. Road and drain repair work. | 6.82 03/09/2024 | 6.82 09 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | Sidh Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
342
| 180 | 106 | Work of drain and interlocking tiles from Rajveer's house to Subodh's house and from Kalua's house to Jugendra Singh's house in Ward 30, Sadarpur. | 8.39 03/09/2024 | 8.39 09 Sep 2024 | 23 Nov 2024 14 Oct 2024 | | Aanav Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
343
| 181 | 160 | Work of drain and interlocking tiles from Sunil Verma's house to Mahesh's house and from Subhash Pehlwan's house to Manjoor's shop in Ward 30, Sadarpur. | 3.30 03/09/2024 | 3.30 26 Nov 2024 | 23 Jan 2025 23 Jan 2025 | | Abad Const | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
344
| 182 | 124 | Work of drain and interlocking tiles from Harendra's house to Jaipal's house and in Subhash wali gali in ward 30, Sadarpur village. | 2.02 03/09/2024 | 2.02 27 Sep 2024 | 12 Dec 2024 15 Oct 2024 | | Vansh Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
345
| 184 | 114 | Construction work of drain and interlocking tiles from Ratanlal Sharma to Avnish Kumar Tyagi and from Srinivas to Lilu's house in Ward-31, Sihani. | 6.02 02/09/2024 | 6.02 09 Sep 2024 | 12 Dec 2024 14 Oct 2024 | | J P Sakti | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
346
| 185 | 60 | Construction work of drain and interlocking tiles from Rajkumar to Rajan's house in Ward-32, Krishnanagar. | 6.07 05/09/2024 | 6.07 09 Sep 2024 | 26 Nov 2024 09 Oct 2024 | | A.H Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
347
| 189 | other | Work of laying interlocking tiles in the courtyard of the primary school of Ward 34 Shahidnagar First. | 5.88 05/09/2024 | 5.88 09 Sep 2024 | 08 Oct 2024 | | Akruti Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
348
| 190 | 79 | Repair work by drain and C.C. in the damaged lane from Khalil's house to Nausaad's house (Chanda wali lane) in ward 34 Shaheednagar Pratham. | 2.48 05/09/2024 | 2.48 09 Sep 2024 | 08 Oct 2024 | | Akruti Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
349
| 191 | 137 | Construction work of damaged lane/road through CCC and drain in Ward-35 Buddhist Vihar Akbarpur Bahrampur from Subhash's house to Gopal's house, from Gyanendra's house to Sanjay Master's house, from Devendra Chaudhary's house to Saurabh's house. | 9.63 04/09/2024 | 9.63 26 Nov 2024 | 02 Jan 2025 24 Dec 2024 | | Pardhan Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
350
| 192 | 90 | Construction work of damaged lane/road through CC and drain from Shyam Lal's house to Satendra's house in Ward-35 Buddhist Vihar Akbarpur Bahrampur. | 7.31 04/09/2024 | 7.31 07 Oct 2024 | 19 Dec 2024 10 Dec 2024 | | Balaji Const.Co. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
351
| 193 | 53 | Work of laying interlocking tiles in front of Vasundhara Sector 16 market in Ward 36 Sector 16 Vasundhara. | 2.95 05/09/2024 | 2.95 09 Sep 2024 | 09 Oct 2024 | | H.R. Builders | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
352
| 194 | 105 | Repair work of damaged road from behind Awas Vikas office to main road in Ward 36 Sec 16A Vasundhara by Danes. | 5.65 05/09/2024 | 5.65 09 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
353
| 195 | 112 | Repair work of damaged road from H.No. 16A/2001 to near S Plaza in Ward 36, S. 16A Vasundhara, near Awas Vikas Guest House, by DANS. | 9.88 05/09/2024 | 9.88 09 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
354
| 196 | 101 | Work of construction of drain and laying of interlocking tiles from Subodh Sharma's house to Nitin Sharma's house via Shivkumar's house in Ward 36, Prahladgarhi village. | 6.07 05/09/2024 | 6.07 09 Sep 2024 | 05 Nov 2024 15 Oct 2024 | | Ujjwal Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
355
| 197 | 37 | Work of construction of drain and laying of interlocking tiles from BH No. 16/08 to Jaiveer Singh's house in Ward 36, Prahladgarhi village. | 6.14 05/09/2024 | 6.14 09 Sep 2024 | 11 Nov 2024 09 Oct 2024 | | Tej Const | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
356
| 198 | 52 | Construction of drain and road improvement work through interlocking tiles and C.C. in ward 36, Prahaladgadhi village, from Somdatta to Basanta's house, in the street containing Krishnapal, Fatte, Vipin and Anup Singh. | 9.05 05/09/2024 | 9.05 09 Sep 2024 | 05 Nov 2024 09 Oct 2024 | | Tej Const | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
357
| 200 | 75 | Construction work by Sugar Pie Skool Interlocking Tiles from Plot No 499, Ward 37, Shalimar Garden. | 6.61 05/09/2024 | 6.61 09 Sep 2024 | 12 Dec 2024 08 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
358
| 203 | 165 | Road improvement work by DANS from Vinod Shukla to Rakesh Marg via A/51, K/104 in Ward-39, Nehrunagar Third A & K. | 9.94 07/09/2024 | 9.94 07 Oct 2024 | 20 Feb 2025 | | Prateek Enter. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
359
| 204 | 50 | Work of construction of interlinking tiles and drains in Somvati, Bablu Pal Wali Gali and Sunaro Wali Gali in Ward-39, Nasirpur. | 9.47 07/09/2024 | 9.47 09 Sep 2024 | 09 Oct 2024 | | A.S. Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
360
| 205 | 51 | Work of construction of interlinking tiles and drain in Ward-39, Rakesh Marg Street No. 02 and G-50, G91, G-100 in G Block, near the park and in the street behind the Patwari. | 9.52 07/09/2024 | 9.52 09 Sep 2024 | 10 Oct 2024 09 Oct 2024 | | A.S. Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
361
| 206 | 54 | Work of construction of interlinking tiles and drain in service line behind Ward-39, Nasirpur Nehru Nagar Third A/18 and buffalo dairies. | 8.43 05/09/2024 | 8.43 09 Sep 2024 | 10 Oct 2024 09 Oct 2024 | | A.S. Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
362
| 209 | 95 | Construction work of drain and CC road from Lucky flour mill to Sunny Shakshaina and Suresh Chauhan's house to Chhuttan's house and from Rinku Tomar's house to Rana's house and from Omprakash's house to Ramchandra in lane no. 1 in ward-40, Jhandapur. | 5.46 05/09/2024 | 5.46 09 Sep 2024 | 06 Mar 2025 15 Oct 2024 | | Shri Balaji Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
363
| 210 | 106 | Construction work of RCC drain and CC road from Samar Sharma to Saxena Super Store and from Rahul Sharma Dairy to Pratap's house in Ward-40 Jhandapur. | 8.14 05/09/2024 | 8.14 09 Sep 2024 | 18 Mar 2025 15 Oct 2024 | | Shri Balaji Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
364
| 211 | 75 | Construction work of culverts in Balmki Mohalla, Dhara Wali Gali, Railway Line Main Road, Dhobi Wali Gali, near Shiv Mandir, near Primary School and other places in Ward-40, Sahibabad Village. | 3.85 05/09/2024 | 3.85 09 Sep 2024 | 15 Oct 2024 | | Chandra Mohan Singh Raguwanshi | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
365
| 212 | 86 | Construction work of C.C. road and drain from Nandini General Store to house no. 592 and from Rajendra Sharma's house to Shri Balaji Electrical in ward-41 Jhandapur. | 6.92 05/09/2024 | 6.92 09 Sep 2024 | 25 Nov 2024 15 Oct 2024 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
366
| 213 | 109 | Construction work of RCC drain from Kashinath Building to SK Packing via Red Rose in Ward-43 Kadkad. | 5.53 05/09/2024 | 5.53 09 Sep 2024 | 24 Feb 2025 15 Oct 2024 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
367
| 214 | 148 | Construction of RCC drain and road through CC from Mahendra's house to house no. 491 Geeta Devi in ​​Ward-43 Kadkad Model, from HDFC (ATM) to house no. 1095 (Cookie Wali Gali). | 5.24 05/09/2024 | 5.24 21 Oct 2024 | 24 Feb 2025 24 Feb 2025 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
368
| 215 | 85 | Repair work of drain and C.C. in the damaged lane from M.L. Public School to Anil Pandit's house and from Pramod to Suresh Chauhan's house in Ward 44 Sanjay Colony. | 5.37 05/09/2024 | 5.37 09 Sep 2024 | 09 Dec 2024 08 Oct 2024 | | Chandra Mohan Singh Raguwanshi | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
369
| 216 | 81 | Construction work by interlocking tiles in the drain and damaged street from Raju's house to Suraj's house in ward 45, Karhaida. | 8.29 05/09/2024 | 8.29 09 Sep 2024 | 12 Nov 2024 08 Oct 2024 | | JSS Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
370
| 217 | 57 | Work of drain and interlocking tiles from Krishanpal Singh's house to Chandrapal Singh's house and the street leading to Harendra Shahlot's house and from Jogendra's house to Ramlal's house in Ward 46, Guldhar II. | 8.58 03/09/2024 | 8.58 09 Sep 2024 | 09 Oct 2024 | | A.S. Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
371
| 218 | 128 | Road improvement work by Danes from house no. 201 to 219 in ward 46, Mansi Vihar. | 6.77 03/09/2024 | 6.77 09 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
372
| 221 | 127 | Road improvement work by DANS from SC-230A to SC-205 in Ward 47, Shastri Nagar C-Block. | 7.22 23/09/2024 | 7.22 09 Sep 2024 | 15 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
373
| 222 | 147 | Work of drain and interlocking tiles from Z-22 to Z-20 in Ward 47, Mahendra Enclave. | 6.69 03/09/2024 | 6.69 07 Oct 2024 | 12 Dec 2024 12 Dec 2024 | | A.K. Asso. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
374
| 223 | 75 | Construction work of C.C. lane from in front of Bunty's shop to Chaudhary Rashid's house in Ward-48, Mirzapur. | 6.08 04/09/2024 | 6.08 09 Sep 2024 | 03 Dec 2024 14 Oct 2024 | | B S Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
375
| 224 | 50 | Ward-48, Mirzapur Sector-12, from Intezaar to Choudhary Nanne Kha's house, the damaged road is repaired with C.C. Road. Work of repairing the road with C.C. | 9.67 05/09/2024 | 9.67 09 Sep 2024 | 14 Oct 2024 08 Oct 2024 | | A P Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
376
| 225 | 74 | Ward-48, Mirzapur Sector-12 Nurani Masjid to Mustafa, Aslam Chaudhary to Intezaar, Bablu to Aslam Chaudhary, Wasim Wali Gali, damaged road, road improvement work by C.C. | 7.93 03/09/2024 | 7.93 09 Sep 2024 | 03 Dec 2024 14 Oct 2024 | | B S Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
377
| 226 | 49 | Ward-48, Mirzapur Sector-12 From Nisar's house to Nurani Masjid Jan Seva Kendra to Wasim, Wasim, to Aslam, damaged road repair work by C.C. | 9.86 05/09/2024 | 9.86 09 Sep 2024 | 08 Oct 2024 | | A P Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
378
| 227 | 73 | Ward-48, Mirzapur Sector-12 Dr. Naeem Siddiqui from Shifa Clinic, Sher Shah from Imran, Kamal Pal from Bharatpal, work of road repair work through C.C. for the damaged road. | 8.41 03/09/2024 | 8.41 09 Sep 2024 | 26 Nov 2024 14 Oct 2024 | | B.S. Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
379
| 228 | 80 | Road repair work through C.C. on the damaged road from Faryad's house to Dr. Naeem Clinic and subsidiary lanes in Ward-48, Sector-12, Mirzapur. | 8.88 03/09/2024 | 8.88 09 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | A P Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
380
| 229 | 94 | Ward-50, Sadiq Nagar, from Manoj Tyagi to Om Tyagi and work of drain and C.C. road. | 4.10 05/09/2024 | 4.10 09 Sep 2024 | 13 Dec 2024 14 Oct 2024 | | Prakash Const | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
381
| 235 | 167 | Work of interlocking tiles road construction and drain repair work in front of house no. B/39, B/164, B/158 and B/172 in Ward-52, Panchvati B Block. | 9.99 09/09/2024 | 9.99 05 Dec 2024 | 24 Feb 2025 24 Feb 2025 | | M.S. Buildwal | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
382
| 236 | 169 | Construction work of C.C. road and drain in lane no. 04, Arya Samaj lane, Ward-52, Purana Aryanagar Kot Village. | 7.56 09/09/2024 | 7.56 26 Dec 2024 | 25 Feb 2025 25 Feb 2025 | | Shree Radhya Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
383
| 237 | 59 | Work of drain and interlocking tiles in Ward 53, Raispur, from Amarnath's house to China's house, from Vinod's house to Devendra's house, from Prakash's house to Vinod's house, in Jitendra and Lilu's street. | 9.87 03/09/2024 | 9.87 09 Sep 2024 | 10 Oct 2024 09 Oct 2024 | | A.S. Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
384
| 239 | 158 | Work of drain construction from Veeru's house to Ram Vatika in Ward 53, Raispur. | 4.23 03/09/2024 | 4.23 07 Oct 2024 | 24 Jan 2025 22 Jan 2025 | | Dua Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
385
| 240 | 159 | Work of interlocking tiles and shed in Harijan Chaupal in Ward 53, Raispur and work of interlocking tiles in front of the house of former councilor Narendra Chaudhary. | 4.93 03/09/2024 | 4.93 07 Oct 2024 | 22 Jan 2025 22 Jan 2025 | | Dua Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
386
| 242 | 65 | Footpath work in Ward 53, Sanjay Nagar M-Block from M-324 to M-328, M-354 to M-361, M-92 to M-76. | 7.12 03/09/2024 | 7.12 09 Sep 2024 | 10 Oct 2024 09 Oct 2024 | | Shri Balaji Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
387
| 243 | 136 | Construction work of CC road parallel to our park from in front of Kishan Sharma's house in Sadbhavna Society in Ward-54. | 4.17 22/08/2024 | 4.17 21 Oct 2024 | 22 Jan 2025 22 Jan 2025 | | JSS Const. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
388
| 244 | 119 | Improvement work by interlocking tiles in Prayas Housing Society in Ward-54 Vasundhara Sector-03 from 3/273 to 3/283 and in front of Laxmi Narayan Temple. | 8.89 05/09/2024 | 8.89 09 Sep 2024 | 16 Dec 2024 16 Dec 2024 | | Mahakaleshwar Engg. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
389
| 245 | 70 | Construction work of interlinking tiles road in house no. 259 to 270, 258 to 247 and 236 to 246 (Tikona Park) in Ward-55, D Block. | 9.99 03/09/2024 | 9.99 09 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | V.S. Buildcon.Co. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
390
| 246 | 71 | Construction work of interlinking tiles road from house no. 236 to 402 and 403 to 393 in Ward-55, D Block. | 9.74 03/09/2024 | 9.74 09 Sep 2024 | 14 Oct 2024 | | V.S. Buildcon.Co. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
391
| 247 | 72 | Construction work of interlinking tiles road in house no. 298 to 304 and 419 to 434 in Ward-55, D Block. | 9.97 03/09/2024 | 9.97 09 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | V.S. Buildcon.Co. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
392
| 248 | 138 | Road improvement work by DANS from 05/129 to 05/159 in Ward 56, Chiranjiv Vikar Sector-05. | 9.93 03/09/2024 | 9.93 09 Sep 2024 | 15 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
393
| 250 | 143 | Road repair work through C.C. on the damaged road from Sundar to Radheshyam, Madanlal to Sanjay Sharma's house in Ward-58, Mawai. | 7.86 03/09/2024 | 7.86 26 Nov 2024 | 30 Dec 2024 24 Dec 2024 | | A.P Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
394
| 251 | 135 | Road repair work through C.C. on the damaged road from Parshuram to Satendra, Kishan to Rajkumar, Deendayal to Manoj in ward 58, Mawai. | 8.08 03/09/2024 | 8.08 26 Nov 2024 | 02 Jan 2025 24 Dec 2024 | | Pardhan Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
395
| 252 | 122 | Road repair work through C.C. on the damaged road from Ashok Duggal to D.W.S. Academy, Devdutt Sharma in Ward 58, Mawai Street No. 11. | 9.62 03/09/2024 | 9.62 09 Sep 2024 | 26 Dec 2024 24 Dec 2024 | | A.H Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
396
| 254 | 91 | Work of drain and interlocking tiles in the damaged street in Jai Bharat Enclave of Ward 60, Shyampur Main, in lane no. 06 from Church to B-41 and in lane no. 07 from Shanti Bhawan to Shakuntala Devi's house. | 6.93 05/09/2024 | 6.93 09 Sep 2024 | 15 Oct 2024 08 Oct 2024 | | H.R. Builders | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
397
| 255 | 84 | Work of drain and interlocking tiles in the damaged street in lane no. 04 from Surendra Sharma's house to the temple in Jai Bharat Enclave of Ward 60, Shyampur Main and from B 19 to B 26 in lane no. 05. | 9.37 05/09/2024 | 9.37 09 Sep 2024 | 08 Oct 2024 | | Nikhil Asso. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
398
| 257 | 77 | Construction of RCC drain in lane no. 04 of ward 60 Shyampur Main from Jaipal's house to Goyal Book wala's house and from Rai's house to temple and from Mikku's house to Aryan Academy. | 9.91 14/08/2024 | 9.91 09 Sep 2024 | 21 Nov 2024 08 Oct 2024 | | J.P. Shakti Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
399
| 258 | 96 | Repair work of drain and C.C. in damaged lanes of Raghupat Pandey wali, Nand Sharma wali and K.S. Rawat in Indra Garden of ward 60 Shyampur Main. | 6.02 14/08/2024 | 6.02 09 Sep 2024 | 07 Nov 2024 08 Oct 2024 | | H.R. Builders | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
400
| 259 | 111 | Repair work of the damaged road near Shivaji Park and Central Park in Ward No. 61-10 by Dense. | 9.07 06/09/2024 | 9.07 09 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
401
| 260 | 63 | Repair work of damaged road from Central Park to Mahavir Marg in Ward 61 Sec 10 by Dense. | 5.32 05/09/2024 | 5.32 09 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
402
| 262 | 152 | Construction work by interlocking tiles in the drain and damaged street from Mustakim's house to Imtiaz's house in Ward 64 Garima Garden. | 8.66 05/09/2024 | 8.66 09 Sep 2024 | 15 Oct 2024 | | Marden Engg. Asso. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
403
| 267 | 134 | Improvement work by interlocking tiles in damaged streets from B-317 to B-353 in Ward-68 Brajvihar. | 8.62 01/09/2024 | 8.62 09 Sep 2024 | 20 Jan 2025 20 Jan 2025 | | V.K. Contr. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
404
| 268 | 139 | Improvement work by interlocking tiles in the damaged streets from B-260 to B-352 and B-286 to B-322 in Ward-68 Brajvihar. | 9.70 01/09/2024 | 9.70 07 Oct 2024 | 24 Jan 2025 24 Jan 2025 | | V.K. Contr. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
405
| 269 | 75 | Repair of drains from D-17/1 to D-121 in D Block in Ward-68 Brajvihar and improvement work by interlocking tiles in damaged streets. | 8.21 05/09/2024 | 8.21 09 Sep 2024 | 30 Dec 2024 15 Oct 2024 | | Chandra Mohan Singh Raguwanshi | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
406
| 270 | 54 | Repair of drain from D-152 to D-217 and D-124 in Ward-68 Brajvihar and improvement work by interlocking tiles in damaged streets. | 7.18 05/09/2024 | 7.18 09 Sep 2024 | 10 Oct 2024 09 Oct 2024 | | J P Goyal | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
407
| 271 | 38 | Improvement work by interlocking tiles in Ward-68 Brajvihar from C-153 to C-158 and from C-162 to C-169 and from C-166 to the corner of the park. | 9.75 05/09/2024 | 9.75 09 Sep 2024 | 10 Oct 2024 09 Oct 2024 | | J P Goyal | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
408
| 274 | 81 | Work of interlocking tiles from E-57 to E-356 in Ward 71, Sanjaynagar E-Block. | 4.74 03/09/2024 | 4.74 09 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | Shri Balaji Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
409
| 275 | 80 | Work of interlocking tiles, Ward 71, Sanjaynagar E-468 to E-459. | 5.68 03/09/2024 | 5.68 09 Sep 2024 | 10 Oct 2024 09 Oct 2024 | | Shri Balaji Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
410
| 279 | 56 | Construction work of CC road from flat no. 126 to 125 in Ward-74 Sec-19 Satyam Enclave. | 3.67 09/09/2024 | 3.67 09 Sep 2024 | 09 Sep 2024 | | H.R. Builders | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
411
| 281 | 43 | Work of laying interlocking tiles on the road from house no. 1/530 to house no. 618 A Balaji Apartment in Ward 76, Sector 1, Vaishali. | 7.56 05/09/2024 | 7.56 09 Sep 2024 | 06 Nov 2024 09 Oct 2024 | | Nikhil Asso. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
412
| 282 | 40 | Work of laying interlocking tiles on the road from Drona Classes via 2B 41 to H.No. 23 in Ward 76, S. 2B, Vaishali. | 5.45 05/09/2024 | 5.45 09 Sep 2024 | 09 Oct 2024 | | H.R. Builders | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
413
| 283 | 130 | Work of construction of remaining wall of big drain in Ward 76, Vaishali Sector 2. | 9.91 05/09/2024 | 9.91 21 Oct 2024 | 12 Dec 2024 12 Dec 2024 | | A.H Const. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
414
| 286 | 89 | Construction work of drain and damaged street through C.C. in Gol Gappe street in ward 82, Jawahar Park. | 9.88 05/09/2024 | 9.88 09 Sep 2024 | 15 Oct 2024 08 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
415
| 287 | 86 | Construction work of drain from D9 to D1 in ward 83, Shyampur Ex. and construction work of interlocking tiles in the damaged street. | 8.16 05/09/2024 | 8.16 09 Sep 2024 | 12 Nov 2024 08 Oct 2024 | | Pramood Kumar Singhal | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
416
| 288 | 171 | Construction work of drain from D 29 to D 35A in Ward 83 Shyampur Ex. and construction work of interlocking tiles in the damaged street. | 3.45 05/09/2024 | 3.45 09 Sep 2024 | 12 Nov 2024 15 Oct 2024 | | Mohit Choudhary | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
417
| 289 | 1344 | Road improvement work by DANS from 06/199 to 06/186, 06/172 to 06/185, 06/35 to 06/47 in Ward 84, Rajnagar Sector-06. | 9.85 03/09/2024 | 9.85 09 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
418
| 290 | 76 | Construction work by interlocking tiles in various streets of L Block in Ward 85, Lajpat Nagar. | 8.71 05/09/2024 | 8.71 09 Sep 2024 | 12 Dec 2024 08 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
419
| 291 | 150 | Road improvement work by HIG-04 in Ward 86 Rajendra Nagar Road 05. | 8.18 05/09/2024 | 8.18 09 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | R.G. Builtach Engg. Ltd. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
420
| 292 | 39 | Work of interlocking tiles on side track in composite school in Ward - 87, Justice Section 03, Indirapuram Makanpur. | 4.96 05/09/2024 | 4.96 09 Sep 2024 | 06 Nov 2024 09 Oct 2024 | | R.R. Const. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
421
| 293 | 71 | Construction work of drain and C.C. road in the damaged lane from Haji Nizam's house to Alamm Food in Ward No. 90 Shahid Nagar III. | 7.43 05/09/2024 | 7.43 09 Sep 2024 | 12 Nov 2024 07 Oct 2024 | | Star Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
422
| 294 | 73 | Construction work of drain and C.C. road in the damaged lane from Sharif's house to Aash Mohammad's house in lane no. 01 of ward 90 Shahid Nagar III. | 8.25 05/09/2024 | 8.25 09 Sep 2024 | 12 Nov 2024 07 Oct 2024 | | Star Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
423
| 295 | 72 | Construction work of drain and C.C. road in the damaged lane from Aash Mohammad's house to Haji Jamma's house in lane no. 01 of ward 90 Shaheednagar III. | 7.42 07/10/2024 | 7.42 09 Sep 2024 | 12 Nov 2024 07 Oct 2024 | | Star Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
424
| 296 | 56 | C.C. work in service lane behind K.C./E-55 to K.C./E-25A in C-Block, Ward 91, Kavi Nagar. | 9.92 04/09/2024 | 9.92 09 Sep 2024 | 12 Dec 2024 09 Oct 2024 | | AKG Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
425
| 297 | 66 | Work of interlocking tiles in front of KC-128 and KC/CC-20 in Ward 91, Kavi Nagar C-Block. | 1.12 04/09/2024 | 1.12 09 Sep 2024 | 09 Oct 2024 | | M.S. Buildwal | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
426
| 298 | 53 | Work of interlocking tiles in front of KF-63 and KF-64 in Ward 91, Kavinagar F-Block. | 2.82 04/09/2024 | 2.82 09 Sep 2024 | 09 Oct 2024 | | M.S. Buildwal | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
427
| 299 | 55 | CC work in service lane from KJ-42 to KJ-60 in Ward 91, Kavi Nagar J-Block. | 9.01 04/09/2024 | 9.01 09 Sep 2024 | 23 Nov 2024 09 Oct 2024 | | AKG Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
428
| 300 | 70 | Work of interlocking tiles from KL-01 to KL-40 in Ward 91, Kavinagar L-Block. | 5.56 04/09/2024 | 5.56 09 Sep 2024 | 23 Nov 2024 09 Oct 2024 | | R.D. Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
429
| 302 | 59 | Work of repair of wall, chamber, net, RCC and Hume pipe and C.C. in front of Shri Rashid, Anwar, Aziz and Nazir shop in Ward-92, Kaila Islamnagar. | 2.83 05/09/2024 | 2.83 09 Sep 2024 | 09 Oct 2024 | | K.K const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
430
| 303 | 65 | Repair work of drain/sewer, culvert and C.C. in front of Shri Nadeem, Nasir Building, Bashir, Indian Medical, Zarif, Jarrah, Hakeem, Ramzani, Meenu, Main Road and Farooq's house in Ward-93, Kaila Bhatta. | 2.87 02/09/2024 | 2.87 09 Sep 2024 | 09 Oct 2024 | | A.H Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
431
| 304 | 123 | Work of drain and C.C. from Tayyab Qureshi to Shakeel's house and from Haji Bundu to Lahik in Ward-93, Kaila Bhatta. | 6.29 05/09/2024 | 6.29 09 Sep 2024 | 14 Oct 2024 | | J P Sakti | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
432
| 305 | 34 | Road improvement work by interlocking on damaged site plate from B-08 to B-11 in Alaknanda Apartment in Ward 94 Suryanagar Rampuri. | 4.30 05/09/2024 | 4.30 09 Sep 2024 | 15 Jan 2025 09 Oct 2024 | | R R Const | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
433
| 306 | 130 | Ward-92, Kaila Bhatta, lane no. 01 from Haji Khalil Qureshi to Haji Yasin and lane no. 02 from Indra Sardar to Shama and Yusuf and Salim's house and from Imran to Kalu's house. Construction of C.C. road and drain. | 7.95 07/09/2024 | 7.95 09 Sep 2024 | 14 Oct 2024 | | Mahima Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
434
| 307 | 66 | RCC road construction work from Sabir's house to Jumayeraullah Khan's house in Ward-95, Kaila Bhatta Habib Colony. | 8.35 07/09/2024 | 8.35 09 Sep 2024 | 09 Oct 2024 | | A.P Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
435
| 308 | 63 | Ward-95, RCC road construction work from Kaila Bhatta Habib Colony Gate to Haji Babu's house. | 8.99 07/09/2024 | 8.99 09 Sep 2024 | 09 Oct 2024 | | A.P Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
436
| 309 | 158 | Road improvement work by Danes from C-01 to C-10 and C-13 to C-41 in Ward-96, Nehrunagar-Second and interlocking tiles work from A-72 to A-74 in Ashoknagar. | 9.54 05/09/2024 | 9.54 26 Nov 2024 | 28 Jan 2025 28 Jan 2025 | | P.P. Reyalcon Pvt.Ltd. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
437
| 319 | 93 | Repair and painting work of Chhath Ghat situated on Hindon River in Ward-44, Sanjay Colony and Chhath Ghat near Sahibabad Station Shani Temple and barricading work in the river. | 9.26 18/09/2024 | 9.26 19 Sep 2024 | 15 Oct 2024 08 Oct 2024 | | Global Engg. & Infra. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
438
| 320 | 47 | Repair and painting work of Chhath Ghat under Kavi Nagar Zone. | 9.06 18/09/2024 | 9.06 19 Sep 2024 | 10 Oct 2024 04 Oct 2024 | | Sakhar Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
439
| 321 | 94 | Repair and painting work of Chhath Ghat under Mohan Nagar Zone. | 7.55 18/09/2024 | 7.55 19 Sep 2024 | 15 Oct 2024 08 Oct 2024 | | Global Engg. & Infra. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
440
| 322 | 96 | Repair and painting work of Chhath Ghat in Ward-03/25/51/55 under Vijaynagar Zone. | 2.33 18/09/2024 | 2.33 07 Oct 2024 | 13 Dec 2024 10 Dec 2024 | | Pradhan Contr. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
441
| 323 | 51 | Patch repair work at various places in Ward-51 and 55 under Vijaynagar Zone. (Access road to Ramlila Ground) | 5.82 26/09/2024 | 5.82 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | Modern Engg. Asso. | SHIV KUMAR SAROJJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
442
| 324 | 163 | Patch repair work at various places in Ward-91, Kavi Nagar. | 4.54 05/09/2024 | 4.54 09 Nov 2024 | 05 Feb 2025 05 Feb 2025 | | Shantanu Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
443
| 325 | 76 | Patch repair work at various places in Ward-71, Sanjaynagar. | 9.81 05/09/2024 | 9.81 27 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
444
| 326 | 83 | Patch repair work on Raispur Road in Ward-67, Sanjaynagar. | 9.24 05/09/2024 | 9.24 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
445
| 327 | 75 | Patch repair work on CNG Pump Road, Ward-62, Govindpuram. | 7.62 05/09/2024 | 7.62 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
446
| 328 | 84 | Patch repair work on Road No. 03, Ward-62, Govindpuram. | 9.85 05/09/2024 | 9.85 27 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
447
| 329 | 72 | Patch repair work on Road No. 02, Ward-62, Govindpuram. | 9.98 05/09/2024 | 9.98 27 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
448
| 330 | 73 | Patch repair work at various places in Ward-56, Chiranjiv Vihar. | 4.15 05/09/2024 | 4.15 27 Sep 2024 | 02 Dec 2024 09 Oct 2024 | | Akansha Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
449
| 331 | 78 | Patch repair work at various places in Ward-47, Shastri Nagar. | 8.23 05/09/2024 | 8.23 19 Sep 2024 | 05 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
450
| 332 | 73 | Patch repair work at various places in Ward-18, Rajapur and Shastrinagar. | 9.47 05/09/2024 | 9.47 19 Sep 2024 | 02 Dec 2024 09 Oct 2024 | | Akansha Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
451
| 333 | 79 | Patch repair work at various places on Ramlila route in Ward-84, Rajnagar. | 9.32 19/09/2024 | 9.32 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
452
| 334 | 77 | Patch repair work at various places in Ward-56, Chinrajeev Vihar and Avantika Pratham. | 9.42 05/09/2024 | 9.42 19 Sep 2024 | 02 Dec 2024 09 Oct 2024 | | Akansha Const. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
453
| 335 | 46 | Patch repair work on main road and Mother Dairy in Ward-54 Sector 11 and 13. | 8.35 11/09/2024 | 8.35 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
454
| 336 | 50 | Patch repair work on main road and Shop Prex Mall of Ward-89, 77 Vaishali Sector 3,2,4,5. | 9.69 11/09/2024 | 9.69 19 Sep 2024 | 06 Nov 2024 27 Sep 2024 | | RG Buildtech Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
455
| 337 | 41 | Patch repair work in wards 54 and 74 from Sector 1 cut Vasundhara via Kanawani culvert via Sector-19 Vasundhara to K.R.Mangalam cut of Sector-6 Vaishali on Gurudwara road. | 9.78 11/09/2024 | 9.78 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
456
| 338 | 45 | Patch repair work on service road Radisson Gajab Street and Shukra Bazar Road in Ward-21. | 9.36 11/09/2024 | 9.36 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
457
| 339 | 44 | Patch repair work of damaged potholes on the main road of Sahibabad Industrial Area Site-4 under Vasundhara Zone by Danes. | 9.98 11/09/2024 | 9.98 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
458
| 340 | 51 | Patch repair work on the internal roads of Vaishali Sector-2 B/2 C, Vaishali 3 Rachna Naveen Hospital Marg, Jain Mandir Marg and Vaishali Sector-1 in Ward-76, 77. | 9.97 11/09/2024 | 9.97 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
459
| 341 | 49 | Patch repair work on Ward-68 Braj Vihar main road and Radha Kunj Colony and Braj Vihar A and D Block roads. | 9.73 11/09/2024 | 9.73 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
460
| 342 | 42 | Patch repair work on service road of Ward-36 Vasundhara Sector 12 and 14. | 9.38 11/09/2024 | 9.38 19 Sep 2024 | 15 Oct 2024 09 Oct 2024 | | RG Buildtech Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
461
| 343 | 48 | Patch repair work on the roads of Double Zonal Office Road, Sector 10B main road and Sector-10, 12, 14 Vasundhara between Ward-61, 36. | 9.68 11/09/2024 | 9.68 19 Sep 2024 | 10 Oct 2024 09 Oct 2024 | | Arun Const.Co. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
462
| 344 | 47 | Patch repair work on Dr. Burman Marg in Ward-72 Kaushambi. | 9.95 11/09/2024 | 9.95 19 Sep 2024 | 10 Oct 2024 09 Oct 2024 | | Arun Const.Co. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
463
| 345 | 109 | Road improvement work by patch near H.No. 11/9A, 11/104 and 11/6 in Ward-83, Rajendra Nagar Sector-11. | 6.01 18/09/2024 | 6.01 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | R.G. Builtach Engg. Ltd. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
464
| 346 | 106 | Road improvement work by patch from plot no. 870 to 823 in Ward-78, Shalimar Garden Ex-1. | 9.40 18/09/2024 | 9.40 27 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | Maheshn Cand Contr. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
465
| 347 | 105 | Road improvement work by patch work at various locations in Ward-70, Janakpuri and Vrindavan Garden. | 9.64 18/09/2024 | 9.64 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | Maheshn Cand Contr. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
466
| 348 | 107 | Road improvement work by patch work from Shanti Mandar Kutir to Harihar Mandar's house in Ward - 28. | 9.11 18/09/2024 | 9.11 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | Maheshn Cand Contr. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
467
| 349 | 112 | Road improvement work by patch work in front of Swami Vivekananda School, Ward-83, Rajendra Nagar. | 8.78 18/09/2024 | 8.78 19 Sep 2024 | 14 Oct 2024 10 Oct 2024 | | R.G. Builtach Engg. Ltd. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
468
| 350 | 108 | Patch improvement work of main Jain temple road, Ward-70, Rajbagh. | 8.14 18/09/2024 | 8.14 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | Maheshn Cand Contr. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
469
| 351 | 104 | Road improvement work by patch near 10/4,10/6,10/9,10/7 and 10/20 in Ward-83, Rajendra Nagar. | 7.15 18/09/2024 | 7.15 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | R.G. Builtach Engg. Ltd. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
470
| 352 | 110 | Road improvement work by patch on the road between Ward-83 and 86. | 7.66 18/09/2024 | 7.66 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | R.G. Builtach Engg. Ltd. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
471
| 353 | 112 | Patch repair work near Mother Dairy, Chatore and H.No. 342 & 343 on Maurya Road in Mohan Nagar Zone. | 9.52 18/09/2024 | 9.52 19 Sep 2024 | 14 Oct 2024 10 Oct 2024 | | R.G. Builtach Engg. Ltd. | Vinod KumarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
472
| 356 | 103 | Patch repair work of damaged road from Sahibabad Railway Station Cut GT Road Light to Girls Hostel in Ward-60, Shyampur Main. | 8.57 13/09/2024 | 8.57 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
473
| 357 | 114 | Repair work of damaged road by patch work from Seal Pack Company to Plot No. 80J of Rajendra Nagar Industrial Area, Ward-60, Shyampur Main. | 9.98 13/09/2024 | 9.98 19 Sep 2024 | 14 Oct 2024 10 Oct 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
474
| 358 | 102 | Repair work by patching the damaged road in lane no. 04 of Rajendra Nagar India Area in Ward-60, Shyampur Main. | 9.65 13/09/2024 | 9.65 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
475
| 359 | 101 | Patch repair work of the main damaged road of Rajendra Nagar Ind Area of ​​Ward-60, Shyampur Main. | 9.87 13/09/2024 | 9.87 19 Sep 2024 | 14 Oct 2024 09 Oct 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
476
| 360 | 71 | Patch repair work at various places in Ward-52 of City Zone, Old Aryanagar Road and Model Town. | 9.76 19/09/2024 | 9.76 27 Sep 2024 | 25 Oct 2024 10 Oct 2024 | | Prateek Enter. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
477
| 361 | 76 | Punch repair work at various places in Ward-31, Sihani Main Road, the road in front of Shagun Farm House and Ward-50. | 9.94 17/09/2024 | 9.94 19 Sep 2024 | 10 Oct 2024 10 Oct 2024 | | Arun Const.Co. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
478
| 362 | 77 | Patch repair work at various places in Ward-19 under City Zone. | 5.88 17/09/2024 | 5.88 19 Sep 2024 | 14 Oct 2024 10 Oct 2024 | | Arun Const.Co. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
479
| 363 | 86 | Patch repair work at various places in Ward-08 and 69 under City Zone. | 9.97 17/09/2024 | 9.97 19 Sep 2024 | 10 Oct 2024 10 Oct 2024 | | Arun Const.Co. | Preeti BansalJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
480
| 364 | 75 | Patch repair work at various places in Ward-09 and 49 under City Zone. | 9.82 17/09/2024 | 9.82 19 Sep 2024 | 10 Oct 2024 | | Modern Engg. Asso. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: HON.MAYOR |
|
481
| 365 | 72 | Patch repair work at various places in Wards 12, 88 and 96 under City Zone. | 9.94 17/09/2024 | 9.94 27 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | Prateek Enter. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
482
| 367 | 85 | Work of construction of interlocking tiles on the road leading to the cremation ground located at Ward-50, Rajnagar Extension Road, Noor Nagar. | 6.30 10/09/2024 | 6.30 19 Sep 2024 | 14 Oct 2024 10 Oct 2024 | | Juber Const | SHIV KUMAR SAROJJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
483
| 368 | 136 | Work of construction of interlocking tiles and drain from Nathu Singh's house to Birbal Sharma's house on Bhatt Road in Ward-13 Ghukna. | 2.80 10/09/2024 | 2.80 07 Oct 2024 | 12 Dec 2024 12 Dec 2024 | | J.P. Shakti Const. | Preeti BansalJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
484
| 369 | 134 | Work of drain and interlocking tiles from Deendayal Sharma to Sonu Tyagi in Ward-11 Nandgram Brajnagri. | 12.60 18/09/2024 | 12.60 07 Oct 2024 | 13 Dec 2024 13 Dec 2024 | | Zuber Const. | Preeti BansalJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
485
| 373 | 85 | Work of drain and interlocking tiles from the house of Mahesh Tyagi to the house of Raje Sharma in Ward-16 Morta. | 14.86 18/09/2024 | 14.86 19 Sep 2024 | 10 Oct 2024 | | Om Enter. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
486
| 374 | 99 | Road improvement work by Danes in Ward-47 Shastri Nagar C-Block from Raj Gas Agency to SC-231, SC-231 to SC-287, SC-263 street, SC-302 to SC-315 and SC-256 to SC-251. | 29.59 18/09/2024 | 29.59 19 Sep 2024 | 10 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
487
| 375 | 98 | Ward-91 Kavi Nagar I Block K.I. Repair of drain from 01 to K.I.16 and tiling work on site track. | 7.08 10/09/2024 | 7.08 19 Sep 2024 | 12 Dec 2024 10 Oct 2024 | | Vinod kumar Contr. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
488
| 376 | 92 | Work of drain and interlocking tiles from Manoj's house to Yograj's house in Ward-30 Radha Garden. | 6.35 11/09/2024 | 6.35 19 Sep 2024 | 15 Oct 2024 10 Oct 2024 | | JSS Const. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
489
| 377 | 93 | Road improvement work through drain and Dense from C-83/64 to C-83/77 in Ward-62 Govindpuram C-Block. | 20.60 18/09/2024 | 20.60 19 Sep 2024 | 15 Oct 2024 10 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
490
| 378 | 94 | Road improvement work through drain and Dense in Ward-62 Govindpuram C-Block from C-83/82 to C-83/102, 83/102 to 83/98, 83/96 to 83/89, 83/89 to 83/82. | 24.10 17/09/2024 | 24.10 19 Sep 2024 | 10 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
491
| 379 | 142 | Work of drain and interlocking tiles from B-15 to B-105 in Ward-47, Mahendra Enclave. | 23.18 20/02/2024 | 23.18 19 Sep 2024 | 15 Oct 2024 15 Oct 2024 | | A.S. Const. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
492
| 380 | 95 | Work of drain and interlocking tiles from Anil's house to Vision Singh's house in Ward-30, Surya Garden. | 4.50 19/09/2024 | 4.50 19 Sep 2024 | 15 Oct 2024 10 Oct 2024 | | JSS Const. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
493
| 381 | 96 | RCC drain construction work from MAS Steel/Gali No.-04 to Gali No.-15 in Ward-30, Balaji Enclave. | 29.86 19/09/2024 | 29.86 19 Sep 2024 | 10 Oct 2024 | | Marden Engg. Asso. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
494
| 383 | 97 | Work of interlocking tiles from King Gym to B-153 via B-163 in Ward-47, Mahendra Enclave. | 14.67 19/09/2024 | 14.67 19 Sep 2024 | 14 Oct 2024 10 Oct 2024 | | A.S. Const. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
| Fund Name: MEMBER KOTA |
|
495
| 384 | 88 | Work of drain and interlocking tiles from Primary School to Baljagat School in Ward-16, Sikrod Village. | 27.42 19/09/2024 | 27.42 19 Sep 2024 | 03 Jan 2025 10 Oct 2024 | | Om Enter. | Rajender SinghJunior Engineer | HON.MAYOR | Completed |
|
|
|
|
|
496
| 387 | 63 | Road improvement work by interlocking tiles on the damaged road from Avtar to Ankur in Ward-02 Siddharth Vihar Street No. 07 AB. | 12.44 10/09/2024 | 12.44 19 Sep 2024 | 26 Nov 2024 10 Oct 2024 | | Nirvan Infra | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
497
| 390 | 107 | Construction work of CC road and RCC drain from Kanchan Traders to Jaiveer Bhadana's house via Subhash Vakil on Ward-03, Thana Road. | 19.21 10/09/2024 | 19.21 07 Oct 2024 | 10 Dec 2024 | | Zuber Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
498
| 392 | 120 | Construction work of drain from Rakesh's house to Tillu's house in ward 05 Gagan Vihar and construction work of interlocking tiles in the damaged street. | 22.36 12/09/2024 | 22.36 19 Sep 2024 | 14 Oct 2024 | | Asutosh Kumar Cont | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
499
| 396 | 108 | Work of construction of drain and interlocking tiles in Dilip and subsidiary streets from Ankur Kashyap in Ward-07 Indraraj Colony. | 12.52 10/09/2024 | 12.52 07 Oct 2024 | 10 Dec 2024 | | Zuber Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
500
| 398 | 78 | Construction work of C.C. road and drain in Shankar Manohar, Paneer Wali Gali and Haridatt Jatav Wali Gali in Ward-08, Pranagadhi. | 11.41 10/09/2024 | 11.41 19 Sep 2024 | 10 Oct 2024 | | Vinod kumar Contr. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
501
| 401 | 153 | Work of construction of interlocking tiles and drain in Ward-09, Shibbhanpura, from the house of Jasvir Singh via the house of Amar Singh to the house of Rajesh Kashyap. | 13.20 10/09/2024 | 13.20 07 Oct 2024 | 20 Jan 2025 20 Jan 2025 | | Pramood Kumar Singhal | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
502
| 403 | 123 | Road improvement work by drain and C.C. in the damaged lane from C-93 to Vaishno Devi temple in ward 10. | 26.07 12/09/2024 | 26.07 19 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
503
| 404 | 116 | Improvement work of damaged street from parking to B1/65 in ward 10 DLF by providing drain and interlocking tiles. | 21.72 12/09/2024 | 21.72 19 Sep 2024 | 12 Nov 2024 14 Oct 2024 | | Tej Const | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
504
| 405 | 156 | Ward-11, Nandgram, Krishna Kunj: Z.R.S. Makeover to Verma, Choudhary Sahab's lane through Kapil Tyagi and Hemant Verma lane, Mithlesh's house through Atul's house to Krishna Kunj main road and work of drain and interlocking tiles. | 11.07 10/09/2024 | 11.07 26 Nov 2024 | 21 Jan 2025 21 Jan 2025 | | Zuber Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
505
| 406 | 146 | Work of drain and interlocking tiles from Madan Singh to Shiv Mandir park and from Pramod Pandit to Yadav ji's house in Ward-11, Nandagram E-Block. | 22.54 10/09/2024 | 22.54 26 Nov 2024 | 07 Jan 2025 07 Jan 2025 | | S.D. Contr. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
506
| 408 | 139 | Construction work of drain and C.C. road from Shiva's shop to Deepak's house in Jatwada Kanjimal, from Mukesh's house to Udaychand's house, from Satish's house to Srinivas's house, from Jeet's house to Prashant's house via Raman's house, and adjacent to Sushil's house in Kallupura. | 13.78 10/09/2024 | 13.78 26 Nov 2024 | 30 Dec 2024 30 Dec 2024 | | Zuber Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
507
| 409 | 109 | Ward-13, Ghukna: Construction work of drain and interlocking tiles from B.N. Thakur to Ajaypal's house via Mahendra Tyagi and Vijay Tyagi's lane and from Kamlesh to Ojha and from Naresh Chandra to Trivedi and from Harbirpal to Ilu Sharma's house and from Dinesh Sharma to Bhatta Road and Surend's lane. | 15.78 10/09/2024 | 15.78 19 Sep 2024 | 14 Oct 2024 | | A H Const | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
508
| 410 | 107 | Construction work of drain and interlocking tiles in lane no. 8 in ward-13, Ghukna and Brahmapuri from Pankaj to Rajesh Tyagi's house and from Pappu's house to Omi's house, via Atar Singh's house to Mahendra Nai's house and Banwari Dhobi wali lane and from Jaiprakash to Roopchand and from Moolchand Tyagi to Harpal's house. | 14.83 10/09/2024 | 14.83 19 Sep 2024 | 28 Nov 2024 14 Oct 2024 | | Shyama Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
509
| 411 | 149 | Construction work of drain and interlocking tiles in Khajur wali gali in ward-13, Ghukna, from Lokesh's house to Shashi Bhushan Tyagi's house and from Rakesh to Vinod and from Ramswaroop to Sunil Panchal and Jaiveer Nayak wali gali and from Umendra Convent School to Narendra's house. | 17.73 10/09/2024 | 17.73 07 Oct 2024 | 15 Jan 2025 15 Jan 2025 | | A.V. Enter. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
510
| 413 | 52 | Repair work of damaged road from R-38 to R-48, R-49 to R-55, R-71 to R-66, R-109 to R-96, R-109 to R-54 to R-50 in Railway Enclave R-Block in Ward-14 by Dense. | 16.57 10/09/2024 | 16.57 19 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | RG Buildtech Engg. Ltd. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
511
| 414 | 126 | In Ward-15, RCC drain construction work on both sides from Sector 12 Shiv Juice Center via Ambedkar Park to L Block. | 25.29 10/09/2024 | 25.29 26 Nov 2024 | 13 Jan 2025 24 Dec 2024 | | Sidh Const | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
512
| 415 | 53 | Road repair work by Dense from Sector 12 Jai Auto Mobile to L Block L-26 in Ward-15. | 29.96 10/09/2024 | 29.96 19 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | RG Buildtech Engg. Ltd. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
513
| 416 | 86 | Work of laying interlocking tiles and thermoplastic paint, cat eye on side track from Sector 12 Jai Auto Mobile to L Block L-26 in Ward-15. | 14.97 10/09/2024 | 14.97 19 Sep 2024 | 14 Oct 2024 | | Chandra Mohan Singh Raguwanshi | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
514
| 419 | 116 | In Ward-17, Sevanagar, from Kuldeep's house to T.K. Dubey via Sandeep, Rajkumar, Harish's houses and from Saroj's house to Madan's house and from Shakuntala to Verma's house and from N.B.T. School to Mittal Hardware, drain and C.C. work. | 21.18 10/09/2024 | 21.18 19 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | Pramood Kumar Singhal | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
515
| 421 | 89 | Work of drain and interlocking tiles from Virendra Chaudhary's house to Jairam's house in Ward 18, Rajapur. | 18.40 10/09/2024 | 18.40 19 Sep 2024 | 10 Oct 2024 | | Sarthak Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
516
| 422 | 105 | Work of drain and interlocking tiles in Ward 18, Bagwali Colony, from A-105 to A-223, street A-116, street A-195, from A-225 to Tejpal's house. | 14.20 10/09/2024 | 14.20 19 Sep 2024 | 12 Dec 2024 14 Oct 2024 | | Sarthak Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
517
| 423 | 152 | Construction work of interlocking tiles and drain in Ward-19, Patel Nagar Bounjha from the house of Rakesh Sharma via Pammi to Mokam Singh and from Kamal to Krishna and from Vijay Sharma to Ramchand Upadhyay. | 16.48 10/09/2024 | 16.48 07 Oct 2024 | 20 Jan 2025 20 Jan 2025 | | Pramood Kumar Singhal | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
518
| 425 | 122 | Construction work of drain and interlocking tiles in the damaged street from the house of Subis Chandela to the house of Prem Singh in ward 20 Bhaupura. | 10.51 12/09/2024 | 10.51 19 Sep 2024 | 12 Dec 2024 14 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
519
| 428 | 138 | Construction work of RCC drain and road through CC in KV block in ward 21 from KB-14 to KB-23 via KB-01. | 13.80 10/09/2024 | 13.80 07 Oct 2024 | 24 Jan 2025 24 Jan 2025 | | Mahalaxmi Infra. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
520
| 431 | 148 | Construction work of CC road and drain in Ward-22 Sangam Vihar from house no. 33 to Bhajanlal's house, from Rajpal to Pramod's house, from Vedprakash to Ashok Kumar's house and from house no. 52A to K.K. Shukla's house. | 13.35 12/09/2024 | 13.35 26 Nov 2024 | 07 Jan 2025 07 Jan 2025 | | S.D. Contr. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
521
| 436 | 119 | In ward no. 26, Madhopura, from government ration shop to Shani temple, from grocery store to Shri Ram temple, from Shri Ram temple to Gulab Singh, from Shri Ram temple to Ganesh Dutt, from Babulal to Shankar, from Deepak to ice cream factory, from well temple to Chamunda temple, damaged road is repaired by C.C. Road and drain repair work. | 17.43 10/09/2024 | 17.43 19 Sep 2024 | 24 Dec 2024 | | A.H Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
522
| 437 | 124 | In ward no. 26, Madhopura, from Inder Gurjar to Choudhary Popan Singh to Bhagman Lal, Dola to Rajkumar, Satish to Rajkumar, Neetu to Arun, damaged road is repaired by C.C. Road and drain repair work. | 10.57 10/09/2024 | 10.57 19 Sep 2024 | 15 Jan 2025 24 Dec 2024 | | Jaiveer Singh Contr. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
523
| 438 | 121 | In ward no. 26, Madhopura, from Krishna General Store to Jagdish, from Dharampal to Panchayat Bhawan, from Shani Mandir to Jagdish, Kavita Advocate Wali Gali, from Tejpal to Urmila Sadan, from Mukesh to Shani Mandir Railway Line, the damaged road is repaired by C.C. Road and drain repair work. | 10.32 10/09/2024 | 10.32 19 Sep 2024 | 26 Dec 2024 24 Dec 2024 | | A.H Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
524
| 439 | 116 | Road improvement work by interlocking tiles on the damaged road from Soni Mahal to Happy, Vinod to Pappu, Pappu to Rajbala, Jamuna to Ganga Ram, Rajkumar to Hoshiyaar Singh in Ward-27, Shanti Nagar. | 14.14 10/09/2024 | 14.14 07 Oct 2024 | 10 Dec 2024 | | J.P. Shakti Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
525
| 440 | 91 | Road improvement work by interlocking tiles on the damaged road from Dixit to Mukesh, Deepchand to Vinod, Neetu to Shailesh, Rohit (Tota) to Satveer, Dr. Major to Ram Kuvar in Ward-27, Shanti Nagar. | 10.97 03/09/2024 | 10.97 07 Oct 2024 | 13 Dec 2024 10 Dec 2024 | | Cotack Builders | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
526
| 441 | 114 | Road improvement work by interlocking tiles on the damaged road from Keshav Chaudhary to Chanchal Tyagi, Robin Tyagi to Keshav Tyagi, Lilu Tyagi to Nishant, Shriram Cable to Rinku Pal in Ward-27, Sain Vihar. | 11.27 10/09/2024 | 11.27 07 Oct 2024 | 10 Dec 2024 | | J.P. Shakti Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
527
| 442 | 111 | Road improvement work by interlocking tiles on the damaged road from Satyapal to Omkar, Shokendra to Pramod Sharma, Pintu to Sheshnath, Babita to Harendra Chaudhary in Ward-27, Shanti Nagar slum. | 13.17 10/09/2024 | 13.17 07 Oct 2024 | 10 Dec 2024 | | J.P. Shakti Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
528
| 443 | 129 | Construction work of damaged drain from water plant to Qasim's house in Nilmani Colony, Ward No. 28, Rajiv Colony and construction work of interlocking tiles in the damaged street. | 16.66 12/09/2024 | 16.66 19 Sep 2024 | 14 Oct 2024 14 Oct 2024 | | A.S. Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
529
| 444 | 123 | Construction work of drain from Meena Bhais Wale to Mahadev's house in Nilmani Colony of Ward 28 Rajiv Colony and laying of interlocking tiles in the damaged street. | 11.61 10/09/2024 | 11.61 19 Sep 2024 | 14 Oct 2024 14 Oct 2024 | | A.S. Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
530
| 446 | 119 | Construction work of drain and damaged street through C.C. from Seva Ram's house to Kisan Pal's house in ward no. 29, Bhaupura Kuti. | 18.96 10/09/2024 | 18.96 19 Sep 2024 | 09 Dec 2024 14 Oct 2024 | | Anuj kumar Contr. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
531
| 447 | 121 | Construction work of drain and damaged street through C.C. from Dr. Bengali's house to Ramesh Chand's house in Ward No. 29, Bhaupura Kuti. | 14.68 10/09/2024 | 14.68 19 Sep 2024 | 12 Nov 2024 14 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
532
| 448 | 124 | Construction work of drain and damaged street through C.C. from Kisan Pal's house to Dr. Bengali's house in Ward No. 29, Bhaupura Kuti. | 16.36 10/09/2024 | 16.36 19 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | Ujjwal Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
533
| 451 | 108 | Construction work of drain and interlocking tiles in Ward-31, Sihani from Lakhram to Pappu and from Subhash Tyagi to Nandu Tyagi Mode and from Gaurav Tyagi to Naveen Tyagi's house. | 17.79 10/09/2024 | 17.79 19 Sep 2024 | 14 Oct 2024 | | Anuj kumar Contr. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
534
| 453 | 104 | Construction work of drain and interlocking tiles from Ramkumar Yadav to Sheerpal, Naresh to Sitaram Pandit, Mahavir to Manoj, Pramod to Sundar, Indrapal to Rajpal and Jaisingh to Chotu's house in Ward-32, Harvanshnagar and Bhatta Road. | 29.77 10/09/2024 | 29.77 19 Sep 2024 | 07 Mar 2025 14 Oct 2024 | | Chowdhary Associates | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
535
| 454 | 106 | Construction work of drain and interlocking tiles in Ward-32, Harvanshnagar from Rajpal to Shridevi and Bhagwandas wali gali and Harikrishna wali gali and from Sundar to Suresh and from Navneet to Gauri Shankar temple. | 14.10 10/09/2024 | 14.10 19 Sep 2024 | 28 Nov 2024 14 Oct 2024 | | Shyama Const. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
536
| 457 | 180 | Repair work of drain and C.C. in damaged lane from GT Road to G 696 in Ward 34 Shahid Nagar Pratham. | 15.05 10/09/2024 | 15.05 07 Oct 2024 | 09 Dec 2024 09 Dec 2024 | | Bijender Singh | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
537
| 458 | 179 | Repair work of drain and C.C. in the damaged lane from Sahnawaj's house to Dr. Sarfaraz's house in Ward 34 Shaheednagar Pratham. | 10.31 10/09/2024 | 10.31 07 Oct 2024 | 25 Nov 2024 25 Nov 2024 | | Bijender Singh | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
538
| 459 | 178 | Repair work of drain and C.C. in the damaged lane from Khalil's house to Vittu Shuttering's house in Ward 34 Shahid Nagar Pratham. | 13.72 10/09/2024 | 13.72 07 Oct 2024 | 25 Nov 2024 25 Nov 2024 | | Bijender Singh | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
539
| 460 | 181 | Construction work of drain and C.C. road in the street from Kamil's house to the bakery in ward 34 Shahidnagar Pratham. | 12.32 10/02/2024 | 12.32 07 Oct 2024 | 09 Dec 2024 09 Dec 2024 | | Bijender Singh | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
540
| 461 | 101 | Construction work of damaged lane/road through CC and drain from Bijendra Yadav's house to Savita Raghav's house in Ward-35 Buddhist Vihar Akbarpur Bahrampur. | 12.56 10/09/2024 | 12.56 07 Oct 2024 | 11 Feb 2025 10 Dec 2024 | | Marden Const.Co. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
541
| 462 | 100 | Construction work of damaged lane/road through C.C. and drain in Ward-35 Buddhist Vihar Akbarpur Bahrampur from Bijendra Yadav's house to Ajay Yadav's house, from Vinod Prajapati's house (temple) to Kapil Pandit's house, from Babli Chaudhary's house (Tridev temple) to Amit Master's house. | 14.96 10/09/2024 | 14.96 07 Oct 2024 | 10 Dec 2024 | | Marden Const.Co. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
542
| 464 | 115 | Construction work of RCC drain from Sector 16 Market to Mother Dairy in Ward 36 Sector 16 Vasundhara. | 14.93 10/09/2024 | 14.93 07 Oct 2024 | 16 Dec 2024 16 Dec 2024 | | S.G. Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
543
| 467 | 126 | Work of drain and interlocking tiles in the damaged street from Rohila's house to Pappu's house and from Narendra's house to Panchal's house in Ramnagar, Ward 38, Arthala. | 11.30 10/09/2024 | 11.30 19 Sep 2024 | 14 Oct 2024 | | A.S. Const. | Vinod KumarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
544
| 471 | 166 | Road improvement work by Dense on the road in front of house no. H/45, 48, 187 and house no. H/190 from Amba Store in Ward-39, Nehrunagar Third H Block. | 12.81 12/09/2024 | 12.81 07 Oct 2024 | 20 Feb 2025 | | Prateek Enter. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
545
| 472 | 149 | Construction work of RCC drain and interlocking tiles from Shyam Singh's house to Rudra Kumar's house (Dhara Wali Gali) in Ward-40 Sahibabad village. | 13.94 10/09/2024 | 13.94 21 Oct 2024 | 24 Feb 2025 24 Feb 2025 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
546
| 473 | 154 | Construction work of RCC drain and interlocking tiles from Dhara Bhawan to V.N. Yadav's house (Dhara Wali Gali) in Ward-40 Sahibabad village. | 11.44 10/09/2024 | 11.44 21 Oct 2024 | 05 Mar 2025 05 Mar 2025 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
547
| 474 | 61 | Construction work of RCC drain and interlocking tiles from Vishal Hardware to Amar Dental Care in lane no. 2 in ward-41 Jhandapur. | 11.86 10/09/2024 | 11.86 19 Sep 2024 | 16 Dec 2024 14 Oct 2024 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
548
| 475 | 62 | Construction work of RCC drain and interlocking tiles in lane no. 2 in ward-41 Jhandapur from Bansal General Store to Ambedkar Park and from Hanuman Mandir to Gyani Chak. | 13.26 10/09/2024 | 13.26 19 Sep 2024 | 29 Jan 2025 14 Oct 2024 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
549
| 477 | 69 | Construction work of C.C. road from S.S. Network to Pal Stationery & Sports and up to house no. 62 in Ward-41 Maharajpur. | 11.01 10/09/2024 | 11.01 19 Sep 2024 | 14 Oct 2024 | | V.K. Contr. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
550
| 478 | 109 | Work of drain and interlocking tiles from Ramu Chowk to Mahesh Yadav's house in Ward 42, Bamheta village. | 14.05 10/09/2024 | 14.05 19 Sep 2024 | 02 Dec 2024 14 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
551
| 479 | 112 | Work of drain and interlocking tiles from the house of Brahmadutt Yadav to the house of Anil Journalist in Ward 42, Bamheta village. | 16.21 10/09/2024 | 16.21 19 Sep 2024 | 28 Nov 2024 14 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
552
| 480 | 113 | Work of drain and interlocking tiles from Baniya Ke Bagh/Rajesh's shop to Devendra's house in Ward 42, Bamheta village. | 24.92 10/09/2024 | 24.92 19 Sep 2024 | 02 Dec 2024 14 Oct 2024 | | Keshram Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
553
| 481 | 153 | Construction work of RCC drain and CC road from Gaurav General Store to house no. 1282 and from house no. 1282 to Dharamveer's house, from Dharamveer to Umarpal, from Umarpal to Kilni's house and from R.K. Memorial School to house no. 1108 in Ward-43, Kadkad village. | 10.71 10/09/2024 | 10.71 07 Oct 2024 | 28 Apr 2025 05 Mar 2025 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
554
| 482 | 140 | Construction work of RCC drain and CC road from Bhisam to Prempal and from Prempal to house no. 1067 and from 1067 to Balwant's house and from house no. 1051 to 1046 in ward-43, Kadkad village. | 14.89 10/09/2024 | 14.89 07 Oct 2024 | 29 Jan 2025 29 Jan 2025 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
555
| 483 | 155 | Construction work of RCC drain and CC road from house no. 732 to 748 from Umrao Singh's house to house no. 772 in ward-43, Kadkad village. | 14.16 10/09/2024 | 14.16 07 Oct 2024 | 05 Mar 2024 05 Mar 2025 | | Maa Padhmawati Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
556
| 486 | 200 | Repair work of drain and C.C. in the damaged lane from Sonu's house to Habib and to the house of Hind Public School in ward 44 Sanjay Colony. | 10.25 10/09/2024 | 10.25 21 Oct 2024 | 15 Mar 2025 15 Mar 2025 | | JSS Const. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
557
| 492 | 110 | Road improvement work by DANS from SC-317 to SC-334 and SC-24 to SC-12 in Ward 47, Shastri Nagar C-Block. | 10.89 10/09/2024 | 10.89 19 Sep 2024 | 14 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
558
| 493 | 108 | Road improvement work by Danes in Ward 47, Shastri Nagar F-Block from SF-20 to SF-120, SF-120 to 116, in front of market, from SF-76 to SF-143, SF-153 to SF-166, SE-99A, 99B, 99C. | 21.61 10/09/2024 | 21.61 19 Sep 2024 | 15 Oct 2024 14 Oct 2024 | | RG Buildtech Engg. Ltd. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
559
| 494 | 87 | Road repair work through C.C. on the damaged road from Ali Mohammad to Dasna Wale Doctor in Ward-48, Sector-12, Mirzapur. | 12.36 10/09/2024 | 12.36 19 Sep 2024 | 27 Dec 2024 14 Oct 2024 | | Mahima Const. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
560
| 496 | 92 | Construction work of interlocking tiles and drain from Rishi Kirana Store C/812 near Shiva Temple in Ward-49 Nandgram C Block. | 21.75 10/09/2024 | 21.75 19 Sep 2024 | 28 Nov 2024 14 Oct 2024 | | Rishu Const | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
561
| 497 | 128 | Work of drain and C.C. road from Rakesh Tyagi to Ravindra Tyagi and from Subodh Tyagi to Vinod and Neeraj Tyagi and from Amarnath Tyagi to Sushil Tyagi and Surendra Tyagi to Neeraj Tyagi in Ward-50, Sadik Nagar. | 10.38 10/09/2024 | 10.38 19 Sep 2024 | 18 Mar 2025 14 Oct 2024 | | Balaji Const.Co. | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
562
| 499 | 86 | Construction work of drain and C.C. road from Tejveer Tyagi's house to Keshav Tyagi via Anil Tyagi's house in Ward-50, Saddik Nagar and from Bijendra Kumar Tyagi to Tikaram Prajapati. | 16.88 10/09/2024 | 16.88 19 Sep 2024 | 14 Oct 2024 | | Juber Const | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
563
| 502 | 168 | Work of construction of CC road and drain repair from house no. B/237 to B/347 in Ward-52, Panchvati B Block. | 12.02 12/09/2024 | 12.02 19 Sep 2024 | 25 Feb 2025 25 Feb 2025 | | Shree Radhya Const. | NAGENDRA SHARMAJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
564
| 503 | 102 | Work of drain and interlocking tiles from Bake Lal's house to Ravi Pal's house in Ward 53, Raispur. | 10.34 10/09/2024 | 10.34 19 Sep 2024 | 13 Dec 2024 14 Oct 2024 | | Vinod kumar Contr. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
565
| 504 | 121 | Construction work of CC road from house no. 801 to house no. 773/3 and from house no. 773/3 to the corner of our park in Sadbhavna Society, ward-54. | 13.39 10/09/2024 | 13.39 07 Oct 2024 | 16 Dec 2024 16 Dec 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
566
| 505 | 124 | Construction work of C.C. road from house no. 820 to Shahbeen clinic in Sadbhavna society in ward-54 and on society park road. | 13.02 10/09/2024 | 13.02 07 Oct 2024 | 16 Dec 2024 16 Feb 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
567
| 506 | 67 | Repair work of damaged road from house 0-5/798 to Children's Park in Ward-54 Vasundhara Sector-05 by Dense. | 14.97 10/09/2024 | 14.97 19 Sep 2024 | 22 Nov 2024 14 Oct 2024 | | Prateek Enter. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
568
| 508 | 100 | Road improvement work by DANS in Ward 56, Chiranjiv Vihar Sector-05 from 05/29 to 05/49. | 10.47 10/09/2024 | 10.47 19 Sep 2024 | 14 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
569
| 509 | 114 | Road improvement work by Dans from AE-59 to AE-64, AE-65 to AE-74, AE-49 to AE-31 in Ward 56, Avantika I. | 14.93 10/09/2024 | 14.93 19 Sep 2024 | 30 Dec 2024 14 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
570
| 510 | 116 | Road improvement work by DANS from CC-05 to CC-01/16 and CC-01/06 to CC-01/11 and CB-27 to CC-01/20 in Ward 56, Avantika Pratham. | 19.33 10/09/2024 | 19.33 19 Sep 2024 | 15 Oct 2024 | | Prateek Enter. | Rajender SinghJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
571
| 511 | 83 | Improvement work through drain and interlocking tiles from Subodh Tyagi to Likheram Tyagi and from Narendra Tyagi to water tank and from Subhash Tyagi to Rajkishore and from Rajkishore to Brajkishore in ward-57 Makanpur. | 13.68 10/09/2024 | 13.68 19 Sep 2024 | 06 Nov 2024 15 Oct 2024 | | Shri Balaji Enter. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
572
| 512 | 64 | In ward-57 Makanpur, from Devendra Tyagi to Surendra Tyagi, from Vinod Tyagi to Mangu Tyagi and from Devendra Tyagi to Rame and till Bijendra Tyagi, road improvement work through drain and C.C. | 14.47 10/09/2024 | 14.47 19 Sep 2024 | 06 Nov 2024 14 Oct 2024 | | Shri Balaji Enter. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
573
| 513 | 100 | Road improvement work through drain and CC from Devendra Gupta to Satyapal Tyagi and from Devendra to Jaiveer in ward-57 Makanpur. | 13.04 10/09/2024 | 13.04 19 Sep 2024 | 11 Nov 2024 15 Oct 2024 | | Shri Balaji Enter. | POOJA SINGHJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
574
| 514 | 136 | In ward 58 Mawai, the damaged road from Devdutt Sharma to Kuldeep Sharma, Amarnath to Sunita Panchal, Babulal to Raj Bahadur and Shri Chhote Lal to Mangeram Tyagi was repaired using C.C. | 11.91 10/09/2024 | 11.91 26 Nov 2024 | 24 Dec 2024 | | Pardhan Const. | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
575
| 515 | 127 | Road repair work through C.C. on damaged road from H.No. A-22 to A-543, A-543 to Sarvesh, A-587 to A-591, A-557 to A-583 in Ward-58, Mawai. | 11.79 10/09/2024 | 11.79 26 Nov 2024 | 03 Jan 2025 24 Dec 2024 | | Nirban Infra | SHIV KUMAR SAROJJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
576
| 516 | 87 | Ward - 59, Old City Chandrapuri, near Shalimar Paints, Rajkumar and Rajbir, near Choudhary Chai Wala, Navyug Market, near State Bank and near stationery shop, work of drain repair and interlocking tiles on side track at various places. | 14.56 12/09/2024 | 14.56 19 Sep 2024 | 14 Oct 2024 | | Madan Const | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
577
| 518 | 126 | Ward-59, Old City, Old Munsfi Bazaar, from Balaji Packing to Jaimata Trading, Amarpali Saree Center, Hindon Tailors via Guruji Enterprises and near the mosque, work of drain and CC road and interlocking tiles. | 12.65 12/09/2024 | 12.65 19 Sep 2024 | 14 Oct 2024 | | Navdha Const | Preeti BansalJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
578
| 520 | 123 | Repair work of damaged road from A 158 to 170 and 132 to 144 in ward 61 sector 10 by Dense. | 14.68 10/09/2024 | 14.68 07 Oct 2024 | 16 Dec 2024 16 Dec 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
| Fund Name: NIGAM NIDHI 2024-25 |
|
579
| 521 | 116 | Repair work of damaged road from A 44 to 220 in Ward 61 Sec 10 by Dense. | 14.96 10/09/2024 | 14.96 07 Oct 2024 | 16 Dec 2024 16 Dec 2024 | | R.G. Builtach Engg. Ltd. | Sanjay GangwarJunior Engineer | MEMBER KOTA | Completed |
|
|
|
|
|
580
| 707 | 174 | Construction work of interlocking tiles road and drain near Shani temple in Ramanujam Yadav market on Ramteeram Road, Ward-88. | 1.72 07/12/2024 | 1.72 26 Dec 2024 | 18 Mar 2025 18 Mar 2025 | | A.P Const. | NAGENDRA SHARMAJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
| Fund Name: 15th Finance Commission(AQI/NCAP) |
|
581
| 710 | 194 | Work of raw site track interlocking tiles in front of Buddha Park and in front of the houses in front of 6/1 and 6/136 in Ward-86, Rajendra Nagar Sector-05. | 8.16 09/09/2024 | 8.16 31 Jan 2025 | 20 Feb 2025 20 Feb 2025 | | Solanki Const. | Sanjay GangwarJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
582
| 1133 | 87 | Road widening and divider work for smooth traffic near Ward No. 65, Nasirpur Gate. | 56.83 23/10/2023 | 56.83 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Aspiration Kansa. | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
583
| 1134 | 77 | Resurfacing work from Pink Toilet to Hint Chowk in Ward 84, RDC. | 63.54 03/10/2023 | 63.54 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | RG Buildtech Engg.Ltd | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
584
| 1135 | 89 | Construction work of RCC drain in the remaining part of CC road from Gajji Hotel in Ward-41, Jhandapur Main Market via Ambedkar Park to Gyani Chowk via No. 02 market to Bahar Main Road. | 65.14 23/10/2023 | 65.14 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Mahalaxmi Infra. | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
585
| 1136 | 83 | Road improvement work by patch and Dense from C-04 to GDA Market in Ward-69, C-Block under City Zone. | 35.00 03/10/2023 | 35.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Arun Cons.Co. | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
586
| 1137 | 80 | Road construction work by DANS from Meerut Road to Sihani Garbage Factory under City Zone. | 106.00 03/10/2023 | 106.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Raja Kantra0 | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
587
| 1138 | 85 | Resurfacing work from Diamond Tiraha to Vivekanand Nagar Tiraha in Kavi Nagar Zone. | 112.92 03/10/2023 | 112.92 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | RG Buildtech Engg.Ltd | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
588
| 1139 | 79 | Road improvement work by DENSE on Ward-84 Rajnagar Sector-14,13,11,09,06,03 main roads. | 160.00 03/10/2023 | 160.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | RG Buildtech Engg.Ltd | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
589
| 1140 | 84 | Road improvement work from Patel Marg to Shibbanpura Gurudwara to Lal Chowk. | 36.00 03/10/2023 | 36.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Prateek Enterprises | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|