Fund Name: NIGAM NIDHI 2024-25
SRNOWORK IDWORK ORDER NOWORK NAMEESTIMATE COST & DATETENDER AMOUNT & DATEAGREEMENT DATE & ACTUAL WORK START DATETARGET DATE OF WORK COMPLETIONCONTRACTOR NAME & PHONE NO.ENG. NAME AND PHONE NOFUND NAMESTATUSWork ProgressWork Before StartWork In-ProgressWork After Compelition
1 128Remaining plumbing work in Uttaranchal Bhawan. 7.70 20/01/2024 7.70 11 Jun 202418 Jul 2024 18 Jul 2024 Arun Const.Co. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
2 258Street construction work with drain and interlocking tiles in the street of Smt. Chanchal Chauhan in Ward-60 Shyampur Main. 21.24 02/03/2024 21.24 01 Aug 202421 Sep 2024 21 Sep 2024 Yes Enter. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
3 327Sliding, door railing, paint on doors and ACP sheet etc. remaining work in Uttaranchal Bhawan. 9.77 20/01/2024 9.77 11 Jun 202418 Jul 2024 18 Jul 2024 Arun Const.Co. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
4 448Construction of 04 additional platforms, tin shed work, interlocking tiles and gate at the cremation ground in Ward-37 Shalimar Garden Main. 24.20 02/03/2024 24.20 08 Jul 202420 Aug 2024 20 Aug 2024 P.S. Consaltance Vinod KumarJunior Engineer NIGAM NIDHI 2024-25In Progress
20.00%
5 532Construction work of secondary point for C&D waste in the empty plot adjacent to RRTS Metro station in Ward-61 under Vasundhara Zone. 3.64 25/05/2024 3.64 01 Aug 202424 Sep 2024 24 Sep 2024 H.R. Builders Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
6 632In view of the Kanwad Yatra in the city zone, barricading work is being done from Mahamaya flyover to Hindon Bridge under the Thakurdwara flyover, in the Sai Upvan temple complex and from Shri Dudheshwarnath temple to the clock tower gate and other places. 9.77 03/07/2024 9.77 08 Jul 202429 Jul 2024 20 Jul 2024  NAGENDRA SHARMA 8882460223 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
View View View
7 726Construction work of drain and culvert in front of GDA market in Ward-47, Shastrinagar F-block. 4.01 29/06/2024 4.01 08 Jul 2024 01 Aug 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
8 832Work of interlocking tiles from Pushpram Sadan house to Pramod Kumar house in Ward 16, Vardhamanpuram. 7.10 29/06/2024 7.10 08 Jul 202402 Sep 2024 02 Sep 2024 Bashoya Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
9 936Interlocking tiles work in Ward-46, Mainapur from Mudit's shop/Satish's house via Tilak Ram Tyagi's house to Madhuban Bapudham Road. 28.22 25/06/2024 28.22 08 Jul 202423 Sep 2024 23 Sep 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
10 1021Repair of damaged road on Pipeline Road and gravelling work on side track. 29.48 03/07/2024 29.48 08 Jul 202420 Jul 2024 22 Jul 2024 Prateek Enter. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
11 11otherRepair work of culvert at RDC cut in Ward 84, Rajnagar and drain in front of Asal Sumaglam, Shivam. 4.97 24/05/2024 4.97 08 Jul 2024 09 Aug 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
10.00%
12 1233Construction work of CC road and drain from E-6 to E-7/7 in Ward-96, Nehrunagar Third E-Block. 8.07 11/06/2024 8.07 08 Jul 202409 Aug 2024 09 Aug 2024 Pramood Kumar Singhal Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
13 1328Improvement work by interlocking tiles in single storey C-101 to C-106, C-91 to C-95 and C-90 to C-86 in Ward-68, Brajvihar. 8.22 11/06/2024 8.22 08 Jul 202421 Sep 2024 21 Sep 2024 V.K. Contr. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
14 1439Improvement work through drain and C.C. in the damaged street from H.No.-89 to Nanak Chand's house in Rajbagh Colony, Ward-70, Janakpuri. 12.67 22/06/2024 12.67 08 Jul 202407 Aug 2024 07 Aug 2024 A.V. Enter. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
15 1545Construction work of drain and street through C.C. on both sides from C-157 Hanuman Bansal's building to C-265 in C-block, lane no. 08, ward-70, Janakpuri. 13.57 05/07/2024 13.57 08 Jul 202414 Aug 2024 14 Aug 2024 Aasutos Const. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
16 1621Repair work of damaged road from Suryanagar Police Chowki to Liquor Emporium Wine Shop, Ward-97, under Vasundhara Zone on 311 Smart City App by Dense. 7.08 11/06/2024 7.08 08 Jul 202408 Aug 2024 08 Aug 2024 Arun Const.Co. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
17 1726Repair and painting work of damaged dividers in Ward-89,76,77 in Vasundhara Zone on complaint received on 311 Smart City App. 9.12 25/06/2024 9.12 08 Jul 202422 Aug 2024 22 Aug 2024 V.K. Contr. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
18 18otherRoad improvement work by RCC drain and CC from Dr. Bengali Clinic to Arun Medical on complaint on 311 Smart City App under Vasundhara Zone. 6.32 24/05/2024 6.32 08 Jul 2024  Mahalaxmi Infra. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
19 1935Repair work of damaged road from D-206 to D.V. Medical in Ward-97, Ramprastha under Vasundhara Zone on 311 Smart City App by DANS. 5.61 11/06/2024 5.61 05 Sep 202406 Nov 2024 09 Oct 2024 RG BuildTech Engg. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
20 2059Repair work of damaged road by patching in Ward-89, 76, 77 in Vaishali under Vasundhara Zone on complaint received on Smart City App No. 311. 5.56 18/06/2024 5.56 05 Aug 202415 Oct 2024 10 Oct 2024 RG BuildTech Engg. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
21 2160Repair work of damaged road by patching based on complaint received on 311 Smart City App under Vasundhara Zone. 9.97 11/06/2024 9.97 05 Sep 202402 Dec 2024 10 Oct 2024 Kamlesh Engg. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
22 2235Construction work of interlocking tiles on the road in front of Ret Mandi Community Centre, Ward 49, Nandgram Road. 10.00 19/06/2024 10.00 25 Jun 2024 10 Sep 2024 Anuj kumar Contr. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
23 23143Work of two seater toilet and one urinal in front of the power house at Ward 09 Lal Chowk. 4.31 19/06/2024 4.31 07 Oct 202430 Dec 2024 30 Dec 2024 R.R. Enter. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
24 24125Road improvement work by Danes from Shaheed Ashfaqulla Khan to Ramzan Hotel on Ward 95 Kaila Bhatta Main Road. 9.84 22/07/2024 9.84 05 Sep 2024 14 Oct 2024 Prateek Enter. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
25 25138In Ward 01 Krishnanagar Bagu, from Pawan Sharma's house to Ravindra Sharma's house, from Mahesh Sharma Girish Raghav's house, from Ramveer to Devdutt Shri Kumar to Narendra Yadav's house, repair of drains and improvement work of damaged road by C.C. road. 9.03 13/06/2024 9.03 26 Nov 2024 24 Dec 2024 Pardhan Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
26 2657Supply of precast concrete drain cover in Mohannagar zone. 9.95 11/06/2024 9.95 01 Aug 202418 Sep 2024 18 Sep 2024 P.S. Consaltance Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
27 2732Road and drain construction work through interlocking tiles in the damaged street from Mohan Provision Shop in Ward-07 Sudamapuri D-Block via Kanti Memorial School to Satveer Pal's house. 13.96 22/06/2024 13.96 01 Aug 202403 Sep 2024 03 Sep 2024 Yes Enter. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
28 28129Work of installing wire fencing on the side tracks of the newly constructed road from the Gurudwara to the corner in front of Allahabad Bank in Ward 72, Vaishali Sector 1. 13.49 18/10/2020 13.49 01 Aug 202430 Dec 2024 30 Dec 2024 Zuber Const. POOJA SINGHJunior Engineer NIGAM NIDHI 2024-25Completed
100%
29 2930Repair of damaged road, drain and interlocking tiles from Sunil to Saurabh, Ashok to Gaur, Rana Sagaram School to Satveer's house in Ward-27, Shanti Nagar. 8.43 06/02/2024 8.43 01 Aug 202409 Aug 2024 09 Aug 2024 Nikhil Asso. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
30 3033Work of constructing parapet wall of damaged drain in front of Neelam Dharmkanta, Ward-27. 8.72 04/07/2024 8.72 01 Aug 202406 Sep 2024 06 Sep 2024 Zuber Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
31 3131Road improvement work by interlocking tiles on the damaged road from H.No. 882 to H.No. 945 in Ward-01, Bhimnagar Street No. 09 under Vijayanagar Zone. 2.30 18/07/2024 2.30 01 Aug 202412 Sep 2024 12 Sep 2024 J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
32 32115Patch repair work of damaged road near Sahibabad Station Road and Jal Nigam Colony Road and Shani Temple near Chhath Ghat in Ward-60, Shyampur Main. 9.99 18/07/2024 9.99 05 Apr 202404 Dec 2024 10 Oct 2024 Kamlesh Engg. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
33 3356Construction work of damaged culvert in front of Dr. Taru Singh's clinic in Ward-80, Rajendra Nagar Sector-02 through RCC. 4.31 18/07/2024 4.31 01 Aug 2024 10 Sep 2024 Anuj kumar Contr. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
34 3436In Ward-31, Subhash Nagar, from Dushyant's house to Subhash Chand's house via Radheshyam's house and Dr. Upadhyay's street and from Suresh Chand Sharma's house to Panna's house and from K.S. Memorial School to Chhote Lal Upadhyay's house, work of C.C.C. and drain. 18.14 12/07/2024 18.14 01 Aug 2024 17 Sep 2024 Zuber Const. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
35 3533Road construction work by interlocking tiles in Ward-56, Malti Colony. 28.14 12/07/2024 28.14 01 Aug 2024 17 Sep 2024 Zuber Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
36 3637Work of drain and interlocking tiles in Sardar Wali Gali, from Kailash's house to Yashoda's house in Ward-32, Harvanshnagar Krishnanagar. 2.33 19/07/2024 2.33 01 Aug 2024 19 Sep 2024 J.P. Shakti Const. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
37 3760Drain repair work in front of SB-10 in Ward-47, Shastri Nagar. 1.56 25/07/2024 1.56 05 Sep 202422 Jan 2025 09 Oct 2024 A3R Ent Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
38 3862Construction work of CC road and drain in Ward-95, adjacent to Markaz Mosque. 1.96 21/06/2024 1.96 05 Sep 2024 09 Oct 2024 A.P Const. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
39 3934Repair work of toilets on ground floor and first floor near Hon'ble Court. 9.63 23/07/2024 9.63 01 Aug 202421 Sep 2024 21 Sep 2024 Royal Const.Co. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
40 4035Repair work of toilets on the second and third floors near Hon'ble Court. 5.50 23/07/2024 5.50 01 Aug 2024 23 Sep 2024 Chandra Mohan Singh Raguwanshi Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
41 41otherRepair work of damaged street from Dr. Subhash's house to Shiv Kumar's house and from Chandra Kiran's house to Subhash's house in Ward-07, Sarvodaya Nagar by laying interlocking tiles and drain repair work. 12.00 17/06/2024 12.00 01 Aug 2024  Zuber Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
42 4238Construction work of interlocking tiles road from H.No. 60 to H.No. 65 in Ward-39, Nehrunagar Third H-Block. 2.38 29/07/2024 2.38 01 Aug 202420 Sep 2024 20 Sep 2024 Ek Danth Const. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
43 4358Repair work through drain and CCC in the damaged street from H.No. D-74 to Maurya ji's house in D-block, Ward-70, Janakpuri. 16.66 29/07/2024 16.66 01 Aug 202423 Sep 2024 23 Sep 2024 R.R. Const. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
44 4454Construction work of damaged drain in front of ITS College from Shani Mandir to Petrol Pump in Ward-38, Arthala by RCC. 29.89 19/07/2024 29.89 01 Aug 202410 Sep 2024 10 Sep 2004 Prateek Enter. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
45 4546Work of drain and interlocking tiles from Devendra Ghodi Wale to Anil Pandit's house in Ward 53, Raispur. 5.62 25/07/2024 5.62 05 Sep 2024 04 Oct 2024 A.S. Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
46 4648Work of interlocking tiles from Sampat Singh's house to Yatyavati's house near Shiva temple in Ward 46, Peepal Wali Colony. 4.72 30/07/2024 4.72 05 Sep 202415 Oct 2024 04 Oct 2024 JSS Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
47 4741Work of drain and interlocking tiles from Kaklu's house to Sheeshpal's house in Ward 53, Raispur. 3.61 25/07/2024 3.61 05 Sep 202414 Oct 2024 04 Oct 2024 Vinod kumar Contr. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
48 4840Construction work of boundary wall and two rooms of Community Centre in Ward 53, Raispur. 29.31 02/08/2024 29.31 05 Sep 2024 04 Oct 2024 A.S. Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
49 4950Work of construction of drain from Punjabi Daba to D.P. Yadav's plot in Ward 24, Shankar Vihar Lal Kuan. 9.98 26/07/2024 9.98 05 Sep 202414 Oct 2024 04 Oct 2024 Vansh Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
50 5045Road improvement work by Danes from K-24 to 37 in K-Block, Ward 67, Sanjay Nagar. 9.38 25/07/2024 9.38 05 Sep 202415 Oct 2024 04 Oct 2024 RG BuildTech Engg. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
51 5164Repair work of rain water harvesting chambers at various places in Ward 67, Sanjay Nagar P-Block. 8.52 25/07/2024 8.52 05 Sep 202427 Jan 2025 09 Oct 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
52 5244Road improvement work by Danes from P-139 to P-150 and P-91 to P-100 in Ward 67, Sanjay Nagar P-Block. 9.83 25/07/2024 9.83 05 Sep 202415 Oct 2024 04 Oct 2024 R.G. Builtach Engg. Ltd. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
53 5398Construction work of C.C. road and drain from primary school to Jeet's house, from Dweepchand Sharma's house to Nandu's house in Ward-31, Sihani. 5.57 07/08/2024 5.57 05 Sep 2024 14 Oct 2024 Prakash Const Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
54 54115Construction work of drain and interlocking tiles in Ward-32, Harvansh Nagar from Bhagwat Thekedar to Ramesh's house via Pawan's house and in Rajaram Wali Gali. 7.75 19/07/2024 7.75 05 Sep 202415 Jan 2025 14 Oct 2024 J P Sakti Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
55 5597Construction work of CC road and drain from Banwari's house to the front of Naveen Tyagi and Ishwar Tyagi's house in Ward-31, Sihani. 1.53 12/08/2024 1.53 05 Sep 202404 Feb 2025 14 Oct 2024 Shree Balaji Enterp. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
56 56101Construction of culvert and ramp near the houses of Vijay Sharma, Kavya Beauty Parlour, H.No. 211, Anil, Balkishan, Thakur Properties, Munshi, building owner Sanjay, Raju, Phoolbabu, Pawan, Vinod, Monu, Sumit and Vinod Kumar in Ward-11, Nandagram New Basti Bombay Colony. 4.12 12/08/2024 4.12 05 Sep 2024 14 Oct 2024 Prakash Const Preeti BansalJunior Engineer NIGAM NIDHI 2024-25In Progress
25.00%
57 5747Construction work of CC road and drain from Bachpan Gift Shop to H.No.-09 in Ward-39, Rakesh Marg, R.K. Puram. 7.71 25/07/2024 7.71 05 Sep 202410 Oct 2024 05 Oct 2024 A.S. Const. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
58 5843Construction work of CC road and drain from Shri Banke Bihari Hardware Shop to Anil's house in Ward-39, Rakesh Marg, RK Puram. 8.17 25/07/2024 8.17 05 Sep 202410 Oct 2024 05 Oct 2024 A.S. Const. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
59 5943Construction work of interlocking tiles road and drain from H.No.-B/323 to Hanuman Temple in Ward-52, New Panchvati. 9.98 18/07/2024 9.98 05 Sep 2024 05 Oct 2024 A.S. Const. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
60 6044Construction work of interlocking tiles road and drain in Ward-52, New Panchvati C-Block from H.No. C/93 to C/98. 9.86 18/07/2024 9.86 05 Sep 2024 05 Oct 2024 A.S. Const. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25In Progress
15.00%
61 61103Construction work of CC road and drain from in front of the temple to Jain Sahab's house in Ward-22, Radhakunj Enclave. 9.95 25/07/2024 9.95 05 Sep 2024 14 Oct 2024 Modern Const.Co. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25In Progress
70.00%
62 62102Construction work of CC road and drain from Baburam's house to H.No.-29 in Ward-22, Radhakunj Enclave. 9.98 25/07/2024 9.98 05 Sep 2024 14 Oct 2024 Modern Const.Co. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25In Progress
50.00%
63 6374Patch repair work at various places in Wards 22, 33, 39 and 52 of City Zone. 9.82 19/09/2024 9.82 05 Sep 202415 Oct 2024 25 Jul 2024 Prateek Enter. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
64 6441Ward-49, work of interlocking tiles from pre-constructed drain to Diwan Farm. 9.98 28/08/2024 9.98 05 Sep 2024 04 Oct 2024 Anuj kumar Contr. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
65 6540Ward - 49, Work of interlocking tiles from C&D waste factory to pre-constructed drain. 9.99 14/08/2024 9.99 05 Sep 2024 04 Oct 2024 Anuj kumar Contr. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
66 66147Repair work through drain and C.C. in the damaged lane from Kismati Devi's house to Priya Beauty Parlour in Indra Garden, Ward-60, Shyampur Main. 6.08 22/07/2024 6.08 05 Sep 202415 Oct 2024 15 Oct 2024 Manveer Singh Cont. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: MEMBER KOTA
67 67otherWork of drain and interlocking tiles in the damaged street from Choudhary Jagveer to Satyaveer Choudhary's company in Rajendra Nagar Ind. Area of ​​Ward-60, Shyampur Main. 9.99 22/07/2024 9.99 05 Sep 2024   Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
68 55894Work of laying interlocking tiles on the road from Priya Automobile to house no. 200/2 near Ambersaria Bank in Ward 76, Vaishali. 14.97 10/09/2024 14.97 19 Sep 202415 May 2025 15 Oct 2024  POOJA SINGH 8178016909 Junior Engineer MEMBER KOTACompleted
100%
69 55996Work of laying interlocking tiles on the road from house no. 236 to house no. 306 in ward 76, sector 2B, Vaishali. 14.94 10/09/2024 14.94 19 Sep 2024 15 Oct 2024 S.R.S. Buildcon POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
10.00%
70 56091In Ward 77 Sec 3 Vaishali, the road behind Shiv Temple and from Khushi Sweets 920 to Nikhil Egg Store 874 and from 496 to 517 and 445 to 447, road repair work with old interlocking tiles. 14.92 10/09/2024 14.92 19 Sep 2024 15 Oct 2024 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
71 56188Road repair work by laying interlocking tiles on the road behind Jain temple, the road between the temple and the park, and the road from the rear corner of Jain temple to Chaaya Public School and the road leading to the water tank in Ward 77 Sec 3, Vaishali. 13.48 10/09/2024 13.48 19 Sep 202415 Oct 2024 15 Oct 2024 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
72 56298Road repair work by interlocking tiles of H.No. 339 to 357 and subsidiary road, park road and road from 236 to 288 in Ward 77 Sector 3, Vaishali. 13.67 10/09/2024 13.67 19 Sep 202415 Oct 2024 15 Oct 2024 V.K. Contr. POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
80.00%
73 56380Road repair work by laying interlocking tiles on the road from H.No. 177 to 235 and from Jitendra Singh Co. to New Hospital Road and from 69 to 91 in Ward 77 Sec 3 Vaishali. 13.46 10/09/2024 13.46 19 Sep 202415 Oct 2024 15 Oct 2024 V.K. Contr. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
74 564183Construction work of damaged street by C.C. from plot no. 298 to plot no. 575 in ward 78, Shalimar Garden Ex-2. 25.07 12/09/2024 25.07 09 Nov 202412 Dec 2024 12 Dec 2024 Maheshn Cand Contr. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
75 565otherConstruction work of damaged street from Ward 78 Shalimar Garden Plot No. 575 to Sachin Public School by C.C. 24.93 12/09/2024 24.93 19 Sep 202415 Oct 2024 15 Oct 2024 S.R.S. Buildcon Vinod KumarJunior Engineer MEMBER KOTAIn Progress
10.00%
76 566122Repair work of damaged road from gate no. 1 to gate no. 2 in Anukampa Green Society in ward 79 Abhay Khand 2 and from H.No. 321 to 322 and H.No. 7 in Gyan Khand 1 by Dense. 18.19 10/09/2024 18.19 19 Sep 202416 Dec 2024 16 Dec 2024 R.G. Builtach Engg. Ltd. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
77 567104In Ward 79 Nyay Khand, from H.No. 8 to H.No. 25, H.No. 1039 to H.No. 508 and H.No. 513 to 540 and other subsidiary streets, construction of drains and road improvement work through CC. 25.68 10/09/2024 25.68 19 Sep 202415 Oct 2024 15 Oct 2024 R.R. Const. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
78 568146Street improvement work by laying drain and interlocking tiles in the damaged street from Nagar Dairy to A/32 in Ward 80, Rajendra Nagar. 29.75 12/09/2024 29.75 19 Sep 202415 Oct 2024 15 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
79 569162Improvement work of damaged drain and street by interlocking tiles from A/205 to A/168 in ward 80 Rajendra Nagar. 20.26 12/09/2024 20.26 19 Sep 202415 Oct 2024 15 Oct 2024 S.R.S. Buildcon Vinod KumarJunior Engineer MEMBER KOTAIn Progress
10.00%
80 570126Repair work of damaged road from H.No. 570 to H.No. 720 along with green belt and adjacent to Mother Dairy booth no. 890 in ward 81 Niti Khand by DANS. 22.93 10/09/2024 22.93 19 Sep 202416 Dec 2024 16 Dec 2024 R.G. Builtach Engg. Ltd. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
81 57171Repair work of damaged road from H.No. 354 to Aman Plaza and from Guptaji Sweets Corner to Park in Ward 81, Shakti Khand 4 by Dense. 27.70 10/09/2024 27.70 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
82 572151Construction work of drain and damaged street by C.C. from Tavdeep's house to Movie Palace Road in Ward 82, Jawahar Park. 10.15 12/09/2024 10.15 19 Sep 202415 Oct 2024 15 Oct 2024 Solanki Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
83 573177Construction work of drain and damaged street through C.C. from Billu's house to Bhatna Gad School in Ward 82, Jawahar Park. 14.23 12/09/2024 14.23 07 Oct 202425 Nov 2024 25 Nov 2024 Bijender Singh Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
Fund Name: NIGAM NIDHI 2024-25
84 574179Construction work of drain and C.C. in the damaged street in Rasan wali gali in ward 82, Jawahar Park. 15.73 12/09/2024 15.73 19 Sep 202418 Nov 2024 18 Nov 2024 Bijender Singh Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
85 683155Road improvement through drain and C.C. in Ward-03 Vijayanagar Sector-09, from K-119A to K-135 and in the street of Maa Bhagwati General Store. 9.67 26/07/2024 9.67 26 Dec 202430 Jan 2025 30 Jan 2025 Ariti Const.Co. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
86 684156Repair work of damaged road from Parveen to Kishan in Ward-14 Sector-12 Sarvodayanagar by C.C. 8.21 03/09/2024 8.21 26 Dec 202430 Jan 2025 30 Jan 2025 Ariti Const.Co. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
87 685157Repair of damaged road from Sher Khan to Prabhas Sachiv to Naresh in Ward-58, Mawai Gali No.-06 by C.C. 9.79 03/09/2024 9.79 26 Dec 202430 Jan 2025 30 Jan 2025 Vansh Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25In Progress
40.00%
88 686158Road improvement by interlocking tiles from Ward-55 D-Block H.No. 487 (Pravati) to corner of triangular park. 9.96 05/09/2024 9.96 26 Dec 202430 Jan 2025 30 Jan 2025 R.D. Enter. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
89 687156Ward-62 Govindpuram C-Lock C-278 via Primary School to C-274, road improvement through drain and Dense. 28.70 14/10/2024 28.70 26 Nov 202430 Dec 2025 30 Dec 2025 R.G. Builtach Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
90 6881Repair and painting work of Shri Pradeep Kumar's quarter in Ward-71 Sanjaynagar F-Block Tanki Compound. 1.21 05/12/2024 1.21 10 Feb 202508 Apr 2025 08 Apr 2025 Guru Sukhdav Nanden Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
91 6893Repair and painting work of Mr. Suresh Kumar's quarter in Ward-71 Sanjaynagar F-Block Tanki Compound. 1.13 05/12/2024 1.13 10 Feb 202508 Apr 2025 08 Apr 2025 Guru Sukhdav Nanden Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
Fund Name: MEMBER KOTA
92 6904Repair and painting work of Mr. Javed's quarter in Ward-91 Kavinagar Tanki Compound. 1.28 05/12/2024 1.28 31 Jan 202508 Apr 2025 08 Apr 2025 Guru Sukhdav Nanden Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
Fund Name: NIGAM NIDHI 2024-25
93 575154Dens door road improvement work of the damaged road from A-82 to 16 and A-74 in Ward 83 Shyampur X. 17.64 12/09/2024 17.64 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
94 6912Repair and painting work of Mr. Sanjay Verma's quarter in Ward-91 Kavi Nagar Tanki Compound. 1.26 05/12/2024 1.26 31 Jan 202508 Apr 2025 08 Apr 2025 Guru Sukhdav Nanden Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
95 69225Construction work of side track from HIG C-12 to HIG C-34 in Ward 67, Sanjay Nagar. 6.82 21/10/2024 6.82 26 Dec 202426 Dec 2024 26 Dec 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
96 693157Road repair work through C.C. on the damaged road from Sher Khan to Prabhas, Sachin to Naresh in Ward 58, Mawai Street No. 06. 6.79 03/09/2024 6.79 26 Dec 202404 Feb 2025 04 Feb 2025 Vansh Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
97 694otherRoad and drain repair work through C.C. on the damaged road from H.No. 173/1 to Choudhary Dham Singh, Pramod Kumar Sharma to Rajesh Master ji in Ward No. 26, Gaupuri. 8.47 02/12/2024 8.47 31 Jan 2025  A.H Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
98 6955Work of drain and tiles from Rampal's house to Bhola Pandit's house in Ward-16, Sikrod village. 9.67 05/12/2024 9.67 31 Jan 202526 Apr 2025 26 Apr 2025 Chowdhary Associates Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
99 69632Tiles work near health centre/water tank in Ward-16, Sikrod village. 4.29 05/12/2024 4.29 31 Jan 202526 Dec 2024 26 Dec 2024 Ek Danth Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
100 697 Construction work of interlinking tiles road from house no. 487 (Pravati) to the corner of triangular park in ward-55, D block. 9.86 02/12/2024 9.86 31 Jan 2025  R.D. Enter. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25 
0%
Fund Name: MEMBER KOTA
101 698170Work of construction of culvert at Swadeshi Polytex Ltd. cut in Ward-65, Kavi Nagar Industrial Area. 5.66 24/10/2024 5.66 31 Jan 202526 Dec 2024 26 Dec 2024 A.K. Contr. & Builders Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
102 576144Dens door road improvement work of the damaged road from Anand Medical Store to Ambe Hospital Road in Ward 83 Shyampur X. 20.75 12/09/2024 20.75 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
103 577otherIn Ward 84, Raj Nagar RDC, RDC-167 to RDC-173, RDC-166 to RDC-156, RDC-173 to RDC-156, RDC-22 to RDC-12, RDC-23 to RDC-29, RDC-36 to RDC-30, RDC-42 to RDC-55, RDC-66 to RDC-56, RDC-67 to RDC-77, RDC-85 to RDC-91, RDC-144 to RDC-138, Road improvement work by DANS from RDC-92 to RDC-114, RDC-131 to RDC-137. 22.18 10/09/2024 22.18 07 Oct 202416 Nov 2024 16 Nov 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
104 578118Road improvement work of internal roads of Ward 84, Rajnagar Sector-10 by Dans. 20.04 10/09/2024 20.04 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
105 579173Construction work of drain and interlocking in the damaged street from house no. 44 to house no. 63 and from Shiv Mandir to Chhabra Tyre in ward 85, Lajpat Nagar II, street no. 2. 27.46 12/09/2024 27.46 19 Sep 202415 Oct 2024 15 Oct 2024 Mohit Choudhary Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
106 580172In ward 85 Lajpat Nagar, in F Block from F.131 to F.116 and F.131 to F.132 and F.61 to F.72, F.142 to S.155, F.142 to F.155 and F.122 to F.111, F.192 to F.196 and F.66 to F.21, in front of F.92 and other places, construction work by interlocking. 13.54 12/09/2024 13.54 19 Sep 202415 Oct 2024 15 Oct 2024 Mohit Choudhary Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
107 581161Dens door road improvement work of the damaged road from SPS Apartment to Plot No. 09 in Ward 86, Rajendra Nagar Sector 05. 16.88 12/09/2024 16.88 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
108 582168Construction of drain work by RCC from SPS Apartment to Agarwal's house in Ward 86, Rajendra Nagar. 24.94 12/09/2024 24.94 19 Sep 202415 Oct 2024 15 Oct 2024 Univershal Vanchar Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
109 58366In Ward-87 Nyay Khand 03, improvement work by interlocking tiles in house no. 596 to 592, house no. 501 to 512 via 480 and house no. 525G to 520 and house no. 459 to 457 and house no. 472 to 469, house no. 253 to 248 and house no. 237 via 230 to 232, house no. 821 to 800 and house no. 768 to 761 and house no. 445 to 461. 22.58 10/09/2024 22.58 19 Sep 202414 Oct 2024 14 Oct 2024 R.R. Const. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
Fund Name: NIGAM NIDHI 2024-25
110 584120Repair of damaged road from house no. 868 to Sneh General Store, house no. 860 to 872 and from Shiv Dairy to Vivekanand School in Ward-87, Nyay Khand 03, Indirapuram by Dense and work of interlocking tiles on side patri. 21.51 10/09/2024 21.51 19 Sep 202416 Dec 2024 16 Dec 2024 R.G. Builtach Engg. Ltd. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
111 699 Repair and painting work of Smt. Kanta Devi's quarter in Ward 84, Rajnagar Sector-04 Tanki Compound. 2.38 02/12/2024 2.38 31 Jan 2025   Rajender SinghJunior Engineer NIGAM NIDHI 2024-25 
0%
112 700 Repair work of shelter homes built in wards 75, 37 and 70 in Mohannagar. 5.08 02/12/2024 5.08 31 Jan 2025   Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
113 701195Construction work of RCC wall around the garbage transfer station in Ward-44, Sanjay Colony and work of installing metro sheet from Purvanchal side. 19.86 14/10/2024 19.86 31 Jan 202520 Feb 2025 20 Feb 2025 Solanki Const. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
114 702202Repair work of damaged rooms for storing belongings of service centre and garden staff in Ward-75, Lajpat Nagar. 5.24 22/10/2025 5.24 10 Feb 202515 Apr 2025 15 Apr 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25In Progress
60.00%
115 703203Work of construction of store room in health garage at Ward-83, Shyampur Ex. 0.50 30/11/2024 0.50 10 Feb 202515 Apr 2025 15 Apr 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
116 704190Work of painting, repair and laying of tiles in the health garage in Mohannagar zone. 2.44 30/11/2024 2.44 26 Dec 202410 Feb 2025 10 Feb 2025 T.R. Enter. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
117 705193Construction work of drain and interlocking tiles in the damaged street of Shiv Mandir Udham Singh, Sunita in Ward-45, Karhaida. 8.03 30/11/2024 8.03 31 Jan 202513 Feb 2025 13 Feb 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: MEMBER KOTA
118 706197Construction work of big drain through RCC from Ward-78, Shalimar Garden Ex-01 to Plot No. 842 to 846. 21.59 14/10/2024 21.59 31 Jan 202521 Feb 2025 21 Feb 2025 Prateek Enter. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
119 585142Construction of drain and interlocking tiles in front of H.No. 266 in Ward-88, Ramnagar and H.No. 13 to 17 in Vidya Vihar. R.C.C. drain work near Surya Apartment. 15.73 12/09/2024 15.73 26 Nov 202430 Dec 2024 30 Dec 2024 A.H Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
120 586135Construction work of drain and interlocking tiles in Shri Sai Wali Gali and Gyanendra Wali Gali and Avtar Cable and Harsh Wali Gali and in front of Hardayal, Ramesh and Satbir in Ward-88, Ramnagar. 11.78 12/09/2024 11.78 07 Oct 202416 Dec 2024 16 Dec 2024 V.S. Buildcon.Co. Preeti BansalJunior Engineer MEMBER KOTAIn Progress
0.00%
121 587136Construction work of C.C. road and drain in Ward-88, Turabnagar from H.No. 144 Rohtash to Deepak via H.No. 143, 144, 139. 13.03 10/09/2024 13.03 26 Nov 202430 Dec 2024 30 Dec 2024 Zuber Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
122 588150Construction work of C.C. road and drain in front of H.No. 64, 62, 63 in Ward-88, Gandhinagar and H.No. 259 behind temple in Ramnagar till H.No. 263 Agrawal House. 11.17 12/09/2024 11.17 07 Oct 202420 Jan 2025 20 Jan 2025 Pramood Kumar Singhal NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
123 589192Construction work of drain and C.C. road in the damaged lane from Zahid's house to Mehtab's house in Ward No. 90, Shaheed Nagar III. 9.98 05/09/2024 9.98 19 Sep 202415 Feb 2025 15 Feb 2025 Star Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
124 590170Construction work of drain and C.C. road in the damaged lane from Gas Mohammad's house to Alam's house in Ward No. 90, Shahid Nagar III. 9.28 15/10/2024 9.28 19 Sep 202415 Oct 2024 15 Oct 2024 Star Enter. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
125 591169Construction work of drain and C.C. road in the damaged lane from Ali Clinic to Younis Malik's house in Ward No. 90 Shaheed Nagar III. 9.98 05/09/2024 9.98 19 Sep 202415 Oct 2024 15 Oct 2024 Star Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
126 592121Work of construction of park side RCC drain from KC/E-91 to KC/E-77 via KC/E-14 in Ward 91, Kavinagar C-Block. 10.69 12/09/2024 10.69 19 Sep 202415 Oct 2024 15 Oct 2024 M.S. Buildwal Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
127 593139Work of repairing drain and placing drain cover on the drain from KD-25/06 to KD-83 in Ward 91, Kavi Nagar D-Block. 11.70 12/09/2024 11.70 19 Sep 202415 Oct 2024 15 Oct 2024 Sakhar Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
128 594118Construction work of hall in the community centre located in Ward-92, Kaila Islamnagar. 23.36 12/09/2024 23.36 19 Sep 202414 Oct 2024 14 Oct 2024 A P Const Preeti BansalJunior Engineer MEMBER KOTAIn Progress
50.00%
129 59593Construction work of tin shed in the community centre located in Ward-92, Islamnagar. 21.70 10/09/2024 21.70 19 Sep 202414 Oct 2024 14 Oct 2024 Chandra Mohan Singh Raguwanshi NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
130 59689Construction work of RCC drain in ward-93, Kaila Bhatta from Zaheer's house to Pappu's house passing through the houses of Arif, Liaqat, Bittu. 20.68 10/09/2024 20.68 19 Sep 202414 Oct 2024 14 Oct 2024 A H Const Preeti BansalJunior Engineer MEMBER KOTAIn Progress
0.00%
131 59788Construction work of RCC drain from Ariba Medicos to Zaheer's house via Haroon, Mehraddin, Haji Qadeer in Ward-93, Kaila Bhatta. 23.68 10/09/2024 23.68 19 Sep 202414 Oct 2024 14 Oct 2024 A H Const Preeti BansalJunior Engineer MEMBER KOTAIn Progress
0.00%
132 598442Construction work of drain through RCC from house no. A-31 to house no. A-22 in Ward-94 Rampuri. 14.58 10/09/2024 14.58 19 Sep 202406 Dec 2024 06 Dec 2024 Asutosh Kumar Cont Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
133 59976Road repair work through CC on the damaged road from B-01 to B-08 in Ward 94 Suryanagar Rampuri. 13.19 10/09/2024 13.19 19 Sep 202415 Oct 2024 15 Oct 2024 V.K. Contr. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
134 600114Repair of damaged road from house no. A-349 to A-366, house no. A-354 to A-351 and house no. A-339 to A-344 B in ward-94 by Dense and work of interlocking tiles on site plate. 13.02 10/09/2024 13.02 07 Oct 202416 Dec 2024 16 Dec 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
135 60173Repair work of damaged road from house no. A-328 to A-323A, house no. A-318B to A-310B and house no. A-314B to A-317B, from A-363 to A-360 by Dense in ward-94. 10.61 10/09/2024 10.61 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
136 602121Construction of RCC road and drain in Ward-95, Kaila Bhatta Habib Colony from Wahab's house to Sartaj's house and from Thekedarni to Vakil's house. 16.25 21/07/2024 16.25 19 Sep 202414 Oct 2024 14 Oct 2024 Mahima Const. Preeti BansalJunior Engineer MEMBER KOTAIn Progress
0.00%
137 603120Construction of RCC road and drain from Rais' house to Sattar Malik's house in Ward-95, Kaila Bhatta Habib Colony. 12.67 10/09/2024 12.67 19 Sep 202414 Oct 2024 14 Oct 2024 Mahima Const. Preeti BansalJunior Engineer MEMBER KOTAIn Progress
0.00%
138 604151Ward-96, Nehrunagar-Third F-1/13 to 1/8, construction work of drain and C.C. 10.84 10/09/2024 10.84 07 Oct 202420 Jan 2025 20 Jan 2025 Pramood Kumar Singhal Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
139 605127Work of interlocking tiles on side track from Ganesh Apartment to Balaji Apartment in Ward-96, Nehru Nagar-Second B-Block and near H.No. 167 and in front of Telephone Exchange and from Sec-B-59 to Sec-B-53. 16.87 10/09/2024 16.87 19 Sep 202414 Oct 2024 14 Oct 2024 Pramood Kumar Singhal Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
140 60677Construction of C.C. road from Chandranagar Chowk to the main gate of B.E.L. Colony in Ward-97 Chandranagar. 12.57 10/09/2024 12.57 19 Sep 202415 Oct 2024 15 Oct 2024 Mahalaxmi Infra. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
141 60789Construction of C.C. road from B.E.L. Colony to Ajnara in Ward-97 Chandranagar. 13.46 10/09/2024 13.46 19 Sep 202415 Oct 2024 15 Oct 2024 Mahalaxmi Infra. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
142 60887Construction work of CC road from Ajnara to Aditya Society in Ward-97 Chandranagar. 13.41 10/09/2024 13.41 19 Sep 202415 Oct 2024 15 Oct 2024 Mahalaxmi Infra. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
143 60994Construction work of CC road from Aditya Society to water tank in Ward-97 Chandranagar. 12.99 10/09/2024 12.99 19 Sep 202415 Oct 2024 15 Oct 2024 S.R.S. Buildcon Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
144 61072Repair work of damaged road from Reesav Properties to Himalaya Tower and Angel Jupiter in Ward 98 Ahimsa Khand 2 by Dense 29.77 10/09/2024 29.77 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
145 61181Repair work of damaged road from Aditya Apartment to Windsor Apartment near Vaibhav Park roundabout in Ward 99 Vaibhav Khand by Danes. 20.63 10/09/2024 20.63 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
146 612 Repair work of damaged road from Express Garden to Windsor Roundabout in Ward 99 Vaibhav Khand by Danes. 20.76 21/07/2024 20.76 19 Sep 2024   POOJA SINGHJunior Engineer MEMBER KOTA 
0%
147 61371Repair work of damaged roads from Plot No. 367 to Plot No. 333 and from Plot No. 271 to Tikona Park near Cottage in Ward-100 Shipra Suncity by Dense. 22.30 10/09/2024 22.30 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
Fund Name: NIGAM NIDHI 2024-25
148 614103Repair work of damaged road in Ward 100 Vaibhav Khand 3, from Roundabout 3, Bus Stop 2 Cottage Society to Cottage Gate 3 and from Cottage Gate to Plot No. 17 and from Plot No. 17 to 47 via C-38 by Dense. 29.56 10/09/2024 29.56 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
149 615149Construction work of drain and C.C. road in the damaged lane from Haji Manzoor's house to Siffian Mosque in lane no. 03 in ward 90 Shaheednagar. 9.28 05/09/2024 9.28 19 Sep 202415 Oct 2024 15 Oct 2024 Malik Const. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
150 616167Construction work of drain and C.C. road in the damaged lane from Siffian Mosque to park in lane no. 03 in ward 90 Shahid Nagar. 9.75 05/09/2024 9.75 19 Sep 202415 Oct 2024 15 Oct 2024 Star Enter. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
151 617166Construction work of drain and C.C. road in damaged lanes of side lane Salim wali, Israr wali, Wasim wali and Anees Razai wali in lane no. 03 in ward 90 Shahid Nagar. 7.82 05/09/2024 7.82 19 Sep 202415 Oct 2024 15 Oct 2024 Star Enter. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
152 61896Work of drain construction and interlocking tiles from Rajendra Tyagi to Mullu's house and from Jaiveer Singh to Chhotu's house in Ward-32, Master Colony. 27.40 12/09/2024 27.40 19 Sep 202414 Oct 2024 14 Oct 2024 Juber Const Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
153 619145Resurfacing work on Rajnagar side service road under flyover in Ward-67, Sanjaynagar. 9.87 05/09/2024 9.87 19 Sep 202404 Dec 2024 04 Dec 2024 R.G. Builtach Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
154 620110Construction work of CC road and drain from Shailendra Tyagi's shop to Sanjeev (Jai Vishwakarma)'s shop in Ward-31, Sihani. 6.42 10/09/2024 6.42 19 Sep 202414 Oct 2024 14 Oct 2024 Sachin Builders Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
155 621153Construction work of umbrella on the statue of Sardar Vallabh Bhai Patel built in Patel Park situated at Mohan Nagar Square. 8.87 05/09/2024 8.87 19 Sep 202415 Oct 2024 15 Oct 2024  Sanjay Gangwar 8178016821 Junior Engineer NIGAM NIDHI 2024-25In Progress
60.00%
156 622146Work of drain and interlocking tiles from Bhure's house to Binder's house in Ward-30, Sadarpur. 9.56 05/09/2024 9.56 07 Oct 202412 Dec 2024 12 Dec 2024 A.K. & Asso. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
157 623159Patch repair work in the road from Neela Ghoda to Pvt. Ltd. in Ward-27, Dundahaida and in the road leading to Akbarpur Green Hotel in Ward-35. 5.97 25/07/2024 5.97 19 Sep 202421 Feb 2025 21 Feb 2025 Shantanu Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
158 624135Work of interlocking tiles in front of KB-78/03 in Ward-91, Kavinagar B-Block. 2.01 09/09/2024 2.01 19 Sep 202415 Oct 2024 15 Oct 2024 TR Enter. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
159 625133Construction work of interlocking tiles and drain from Dharampal's house to Santosh Devi's house in Ward-32, Harvanshnagar. 9.30 19/07/2024 9.30 19 Sep 202410 Dec 2024 10 Dec 2024 Zuber Const. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
160 626136CC work in service lane near KF-136A in Ward-91, Kavinagar F-Block. 3.02 03/09/2024 3.02 19 Sep 202415 Oct 2024 15 Oct 2024 TR Enter. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
161 627153Construction work of RCC drain from GDA Market to R-10/87 in Ward-84, Rajnagar Sector-10. 4.25 05/09/2024 4.25 07 Oct 202412 Dec 2024 12 Dec 2024 Prostyle Designe Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
162 628123Resurfacing work from AE-216 to AE-222 and DD-8A to DD-12A in Ward-56, Avantika I. 9.59 05/09/2024 9.59 19 Sep 202415 Oct 2024 15 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
163 629149Work of construction of culvert by removing channel near St. Paul's Academy in Ward-84, Rajnagar. 2.45 05/09/2024 2.45 19 Sep 202412 Dec 2024 12 Dec 2024 Prakesh Const.Co. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
164 630122Work of drain and footpath from KC-76 to KC-80 in Ward-91, Kavi Nagar. 6.09 02/09/2024 6.09 19 Sep 202415 Oct 2024 15 Oct 2024 M.S. Buildwal Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
165 631120Work of interlocking tiles near Konark Building in Ward-84, RDC. 2.58 02/09/2024 2.58 19 Sep 202415 Oct 2024 15 Oct 2024 Bharat Enter. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
166 632130Work of interlocking tiles in front of the house of Rajendra Dhama in Ward-16, Gadhi. 1.68 02/09/2024 1.68 19 Sep 202415 Oct 2024 15 Oct 2024 Vansh Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
167 633126Work of interlocking tiles from Pappu Yadav's house to Sushil's house in Ward-42, Bamheta. 8.35 02/09/2024 8.35 19 Sep 202415 Oct 2024 15 Oct 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
168 634129Work of interlocking tiles from Arun Kumar's house to Rakesh Yadav's house in Ward-42, Bamheta. 8.17 02/09/2024 8.17 19 Sep 202415 Oct 2024 15 Oct 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
169 635132Work of drain and interlocking tiles from Ramphal's house to Babu Ali's house in Ward-42, Bamheta. 1.88 02/09/2024 1.88 19 Sep 202415 Oct 2024 15 Oct 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
170 636189Construction work of boundary wall of cemetery in Ward-37, DLF Colony. 11.94 25/09/2024 11.94 19 Sep 202423 Dec 2024 23 Dec 2024  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
171 637138Construction work of drain from house no. A/118 to house no. A/81 via A/79 in ward-39, Nehrunagar third A. 9.60 18/09/2024 9.60 26 Nov 202430 Dec 2024 30 Dec 2024 Zuber Const. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
172 638199Construction work of parapet wall of drain from 25 Futa Road to Bazirabad Road in Ward-20, Bhaupura. 9.83 18/09/2024 9.83 09 Nov 202427 Feb 2025 27 Feb 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
173 639191Construction work of damaged drain near Valmiki Temple, Ward-28, Rajiv Colony. 4.56 18/09/2024 4.56 21 Oct 202415 Feb 2025 15 Feb 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
174 64081Construction work of C.C. road from water tank to the gate of Panchavati Parivar Society in Ward-97, Chandranagar. 13.69 17/09/2024 13.69 19 Sep 202415 Oct 2024 15 Oct 2024 Mahalaxmi Infra. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
175 64192Repair work of damaged road from 10A/97 to near 10A/89 and from 10A/61 to near 10A/45 in Ward-61, Sector-10 by Danes. 11.96 17/09/2024 11.96 19 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
176 64278Improvement work by interlocking tiles on the damaged side track from H.No. 5/1404 to H.No. 5/1313 and along the edge of the park in Ward-54, Vasundhara Section-05. 9.48 18/09/2024 9.48 19 Sep 202415 Oct 2025 15 Oct 2025 H.R. Builders Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
177 643111Road improvement from Sona Jewellers to Diwakar Public School and in front of R Optical by Dense in Ward-83 Shyampur Ex. 9.49 10/10/2024 9.49 19 Sep 202410 Oct 2024 10 Oct 2024 R.G. Builtach Engg. Ltd. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
178 644100Improvement by Dense in front of Shiv Repair Park, Jain Kulfi Deepak Marble, Sagar Tailors and Police Post on Jindal Road in Mohan Nagar Zone. 9.51 23/09/2024 9.51 19 Sep 202409 Oct 2024 09 Oct 2024 Maheshn Cand Contr. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
179 645147Laying of interlocking tiles in the drain and damaged street from Sonu Mishra's house to Ajay Pal's house in Ward-29 Bhaupura. 9.51 23/09/2024 9.51 19 Sep 202415 Oct 2024 15 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
180 646139Construction of secondary point for C&D waste collection under Vijayanagar Zone. 20.00 09/09/2024 20.00 26 Nov 202424 Dec 2024 24 Dec 2024 Chandra Mohan Singh Raguwanshi SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
181 647 Construction of interlocking tiles and drain from Ramesh's shop near the temple on Bhatia Road, Ward-39, Kamala Quarter, from Rakesh, Rajkumar to Aarti Advocate and from Anshika Communication to the front of Jagveer Singh's house. 7.37 08/08/2024 7.37 07 Oct 2024   Preeti BansalJunior Engineer NIGAM NIDHI 2024-25 
0%
182 648135Improvement of damaged streets from B-Block B-134 to B-139 in Ward-68 Brajvihar by providing drains and interlocking tiles. 4.67 30/09/2024 4.67 07 Oct 202420 Jan 2025 20 Jan 2025 V.K. Contr. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
183 649146Patch repair on the road adjacent to Mangal Bazar and Shriram Chowk road under Indirapuram. 9.67 05/10/2024 9.67 09 Oct 202421 Feb 2025 21 Feb 2025 A.K. Const. POOJA SINGHJunior Engineer NIGAM NIDHI 2024-25Completed
100%
184 650otherPatch repair on the road in front of Habitat Centre, adjacent to Bikaner under Indirapuram. 9.80 05/10/2024 9.80 09 Oct 202406 Dec 2024 06 Dec 2024 A.K. Const. POOJA SINGHJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
185 651144Patch repair on road leading to Shipra Vista, ATS Advantage DPS School under Indirapuram. 9.82 05/10/2024 9.82 09 Oct 202421 Feb 2025 21 Feb 2025 A.K. Const. POOJA SINGHJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
186 652145Patch repair on the roads in front of and adjacent to Jayanti Park under Indirapuram. 9.83 05/10/2024 9.83 09 Nov 202421 Feb 2025 21 Feb 2025 A.K. Const. POOJA SINGHJunior Engineer NIGAM NIDHI 2024-25Completed
100%
187 653150Work of making table top on right cuts from Mohan Nagar crossing to U.P. Gate. 9.95 05/10/2024 9.95 26 Dec 202427 Feb 2025 27 Feb 2025 A.K. Const. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
188 65473Patch repair on Ramleela route in Ward-59 Old City. 9.34 19/09/2024 9.34 27 Sep 202410 Oct 2024 10 Oct 2024 Prateek Enter. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
189 655128In Ward-40, Sahibabad village, construction of drain from Pradeep Fauji's house to RK Online Service and drain in Mangal Wali Gali and RCC drain from Rakesha Chandra to Rajkumar Rame's house and road improvement by interlocking tiles. 3.68 27/09/2024 3.68 09 Nov 202430 Dec 2024 30 Dec 2024 Shiv Shakti Enter. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
190 656182Road improvement by patch work from Shiv Mandir to 2/77 in Ward-80 Rajendra Nagar. 8.44 23/09/2024 8.44 09 Nov 202412 Dec 2024 12 Dec 2024 Maheshn Cand Contr. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
191 657185Ward-75/85 Lajpat Nagar A-253 Road improvement by patch till Laxmi Garment Police Chowki. 8.38 23/09/2024 8.38 09 Nov 202412 Dec 2024 12 Dec 2024 Maheshn Cand Contr. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
192 658184Road improvement by Dense on left side of Jindal Road, Mohan Nagar Zone. 9.81 23/09/2024 9.81 09 Nov 202412 Dec 2024 12 Dec 2024 Maheshn Cand Contr. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
193 659196Road improvement by Dense in front of Milan Academy School, Ward-45, Karhadda. 9.73 23/09/2024 9.73 09 Nov 202421 Feb 2025 21 Feb 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
194 660131Construction work of the roof of the statue located at Buddha Chowk under Vasundhara Zone. 3.27 05/10/2024 3.27 26 Nov 202430 Dec 2024 30 Dec 2024 Dynamic Asso. POOJA SINGHJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
195 661152Construction of road with RCC drain and interlocking tiles from Rajeshwar Prasad to Satpal Singh's house (Dhobi wali gali) in ward-40, Sahibabad village. 9.69 27/09/2024 9.69 21 Oct 202405 Mar 2025 05 Mar 2025 Maa Padhmawati Const. POOJA SINGHJunior Engineer NIGAM NIDHI 2024-25In Progress
30.00%
196 662141Installation of drain and interlocking tiles from Avshesh Pandit to Rajkumar's house in Ward-87 Makanpur. 13.15 23/12/2024 13.15 04 Feb 202504 Feb 2025 04 Feb 2025 Mahamaya Const.Co. POOJA SINGHJunior Engineer NIGAM NIDHI 2024-25Completed
100%
197 663142Construction of damaged wall of girls school in Ward-87 Makanpur. 9.11 05/11/2024 9.11 04 Feb 202504 Feb 2025 04 Feb 2025 Mahamaya Const.Co. POOJA SINGHJunior Engineer NIGAM NIDHI 2024-25Completed
100%
198 664133Construction of damaged divider above the canal bridge of Ward-54 Kanawani culvert through RCC. 5.94 08/10/2024 5.94 26 Nov 202420 Jan 2025 20 Jan 2025 I.W. Const.Co. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
199 665154Footpath work near Ward-47 Shastri Nagar SB-8. 1.57 15/10/2024 1.57 26 Nov 202427 Dec 2024 27 Dec 2024 M.S. Buildwal Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
200 666157Construction of culvert at RTO Chowk in Ward-24 Bulandshahr Road and area. 6.46 10/10/2024 6.46 26 Nov 202431 Dec 2024 31 Dec 2024 Shree Ran Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
201 667164Ward-84 Rajnagar Sector-10 Repair of drain in front of GDA market. 4.28 23/10/2024 4.28 04 Feb 202505 Feb 2025 05 Feb 2025 M.S. Buildwal Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
202 668165Installation of interlocking tiles from the house of Pintu Tyagi in Ward-46 Mainapur to the main gate of Garden Enclave Tiraha. 9.97 17/12/2024 9.97 04 Feb 202505 Feb 2025 05 Feb 2025 Mahamaya Const.Co. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
203 669166Installation of drain and tiles from Satveer Jatav's house to Deshraj's house and from Deshraj's house to Rampal's house in Ward-16, Sikrod village. 29.92 23/12/2024 29.92 04 Feb 202511 Feb 2025 11 Feb 2025 Cotack Builders Rajender SinghJunior Engineer NIGAM NIDHI 2024-25In Progress
70.00%
204 670167Installation of drain and tiles from Kushanpal's house to Sanjay Gandhi's house in Ward-16, Sikrod village. 9.34 05/12/2024 9.34 04 Feb 202511 Feb 2025 11 Feb 2025 A.S. Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
205 671168Installation of drains and tiles from Sector-24A to Sector-17E in Ward-30 Indra Colony. 9.98 30/11/2024 9.98 04 Feb 202515 Feb 2025 15 Feb 2025 JSS Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
206 672169Construction of drain in Ward-84 Rajanagar Sector-14 GDA Market. 6.23 09/10/2024 6.23 26 Nov 202415 Feb 2025 15 Feb 2025 B.S. Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
207 673164Installation of interlocking tiles in lane no. 06 near ward-52 old Aryanagar Devi temple. 3.32 07/12/2024 3.32 26 Dec 202413 Feb 2025 13 Feb 2025 Trinetra Infra SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
208 674145Construction of road and drain through C.C. on the damaged roads from Sharma Sadan to Sadu Gurjar, Shri Radheshyam to Shri Balaji General Store, Sanjeev to Gurjar Niwas in Ward-26 Madhopura. 8.62 03/09/2024 8.62 26 Dec 202430 Jan 2025 30 Jan 2025 A.H Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
209 675146Construction of road and drain through C.C. on the damaged road from Ward-26 Gaupuri H.No.-173/1 to Choudhary Dhamsingh, Pramod Kumar Sharma to Master Rajesh. 8.47 04/09/2024 8.47 26 Dec 202430 Jan 2025 30 Jan 2025 A.H Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
210 676147Improvement of damaged lane/road from Monu's house to Satish Devi's house to Vedram's house in Ward-02 Siddharth Vihar, Lane No. 04 by interlocking tiles. 10.40 23/12/2024 10.40 26 Dec 202430 Jan 2025 30 Jan 2025 Nirban Infra SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
211 677148Construction of interlocking tiles and drain from Rinku's house to Lalit's house in Ward-02 Siddharth Vihar. 7.88 02/09/2024 7.88 26 Dec 202430 Jan 2025 30 Jan 2025 Nirban Infra SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
212 678149Patch repair at various places in Ward-23 Kailashnagar Ward-51, Pratap Vihar Sector-11 and Ward-55 Pratap Vihar. 9.16 25/07/2024 9.16 26 Dec 202430 Jan 2025 30 Jan 2025 Shantanu Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
213 679150Patch improvement work of main roads of Wards 14, 15, 26 and 58 under Vijayanagar Zone. 9.26 25/07/2024 9.26 26 Dec 202430 Jan 2025 30 Jan 2025 Shantanu Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
214 680151Repair of damaged road from power house to drain culvert on Plant Road in Ward-27 Dudhaida by DENSE. 26.99 10/09/2024 26.99 26 Dec 202430 Jan 2025 30 Jan 2025 Shantanu Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
215 681152Road improvement by patch work at various places in Ward-25 Vijayanagar Industrial Area and Ward-03. 9.50 25/07/2024 9.50 26 Dec 202430 Jan 2025 30 Jan 2025 Shantanu Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: MEMBER KOTA 2024-25(II)
216 682153Repair of damaged road from Khemchand to Ramgopal, Sharda's house to Dr. Rakesh, Kiranpal to Shripal in ward-58, Mawai through C.C. 9.20 03/09/2024 9.20 26 Dec 202430 Jan 2025 30 Jan 2025 Ariti Const.Co. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
217 838 Ward-03, near Ramlila Maidan, from Rajesh Thakur to Maharani, from Naimsingh to Rajendra Kori, from Hiralal to Surendra and from Surendra to temple, construction work of CC road and RCC drain. 9.13 08/02/2025 9.13 21 Mar 2025  OTHER SHIV KUMAR SAROJ 8178016826 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
218 839 Repair work of drain and C.C. in the damaged lane from Rajendra Chai Wala's house to Sameer's house and from Alisher's house to Shalma's house and from Noor Mo. to Vaishakhiram School in G Block of Ward 34 Shahid Nagar I. 9.18 08/02/2025 9.18 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
219 840 Repair work of drain and C.C. in damaged lane from Istiyak to Indian Modern School, Siraj to Bablu, Fakira to Hanif and Vikar Ahmed to Abbas's house in ward 34 Shaheednagar Pratham. 9.22 08/02/2025 9.22 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
220 841 Construction work of C.C. road and drain in Ward-33, Sarayanjar Ali from H-2/7 to Mishra Niwas, Praveen Kumar Wali Gali, Sunil Rana Wali Gali, Surendra Singh Wali Gali. 9.24 08/02/2025 9.24 21 Mar 2025  Vinod kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
Fund Name: NIGAM NIDHI 2024-25
221 842 Ward 07 Sudamapuri C-Block: From Raj Kumar Lala to Hari Kishan's house in R.C.C. Road improvement work with drain and interlocking tiles. 9.27 08/02/2025 9.27 21 Mar 2025  Dhanwantri Veer Jhohari SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
222 711198Road improvement work by laying interlocking tiles and Dense on both sides from Indian Bank road and Akash Plaza to Euro Arpa in Ward-86, Rajendra Nagar Sector-05. 9.93 10/10/2024 9.93 31 Jan 202525 Feb 2025 25 Feb 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
223 712 Construction work of drain and C.C. road in three small lanes namely Bori Wali, Beaton and Anand Halwai, lane no. 7, C-Block, Ward-70, Janakpuri. 9.86 02/12/2024 9.86 31 Jan 2025   Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: MEMBER KOTA 2024-25(II)
224 71431Repair and painting work of Shri Amarjeet's quarter in Ward-71 Sanjaynagar F-Block Tanki Compound. 3.76 03/02/2024 3.76 08 Jul 202427 Aug 2024 27 Aug 2024 Mahalaxmi Infra. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
225 715 Work of interlocking tiles on side track from A/112 to A/109, in front of house no. C/56, in Ward-69, Lohianagar C Block, in front of Lal Quarter 9/8. 1.73 20/01/2025 1.73 21 Mar 2025  A.P. Const.Co. Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
226 717 Construction of road and drain through C.C. on the damaged road from Suryakant's house to Lakhpat's house in Ward 14, Sarvodayanagar. 2.63 20/01/2025 2.63 21 Mar 2025  Shawariya Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
227 719 Work of drain and interlocking tiles from Dayanand's house to Kunwar Pal's house in Ward 24, Mehrauli. 2.76 20/01/2025 2.76 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
228 72017In Ward 89, Vaishali Sector 5, repair work of the wall of the big drain near H.No. 500 and laying of tiles near 549. 3.02 05/03/2025 3.02 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
229 72120Work of interlocking tiles on damaged side plate from A-92 to A-84 in Ward 94 Suryanagar Rampuri. 3.07 05/03/2025 3.07 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
230 722 Repair of toilet located inside Ward 89 Vaishali Sector 5 GDA Market and installation of interlocking tiles on the access road to the toilet. 3.10 05/03/2025 3.10 21 Mar 2025  Nirban Infra POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
231 723 Construction work of CC road and RCC drain from Subhash's house to Sanjeev's house in B Block Kachchi Colony on Ward-04, Bypass Road. 3.23 20/01/2025 3.23 21 Mar 2025  A.H. Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
232 724 Work of drain and interlocking tiles from Ashok's house to Lilu's house in Ward 42, Bamheta. 3.24 20/01/2025 3.24 21 Mar 2025  Keshram Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
233 725 Construction work of C.C. road in ward-93, Kaila Bhatta, adjacent to the new mosque in Babudin Malik street and from Imran Saifi to Nasir's building. 3.34 20/01/2025 3.34 21 Mar 2025  J.P. Shakti Const. Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
234 726 Road improvement work by laying RCC drain and interlocking tiles from Mukesh to Jitendra and Satish to Hetram's house in Ward 07 Sudamapuri D-Block. 3.36 20/01/2025 3.36 21 Mar 2025  J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
235 727 Work of drain and interlocking tiles from Shyam's house to Rimpy's house in Ward 24, Bayana. 3.39 20/01/2025 3.39 21 Mar 2025  Dua Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
236 72816Improvement work by interlocking tiles in service lane from A/100 to A-89 in A Block of Ward-97 Chandranagar. 3.51 05/03/2025 3.51 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
237 72918Construction work of drain and CC road from Manoj Medical to Dream Fitness and from Arjun to Pradeep's house in Ward No. 21, Bhowapur village. 3.64 05/03/2025 3.64 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
238 73013Repair and painting work of damaged wall from Indian Bank in Ward-72 Vaishali to Gurudwara in Ward-01 Vaishali. 3.71 05/03/2025 3.71 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
239 731 Work of drain and interlocking tiles from Rajpal's house to Balkishan's house and from Prabhu's house to Shiv Charan's house in Ward 46, Duhai. 3.73 20/01/2025 3.73 21 Mar 2025  Rahul Builders Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
240 73214Repair and painting work of damaged wall from Kamad Giri to Shivalik Tower in Ward-72 Kaushambi. 3.75 05/03/2025 3.75 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
241 733 Ward-17, Sevanagar: Construction work of CC road in front of Ratan's house and interlocking tiles road and drain construction work from Suman's house to Prem Tyagi's house. 3.93 20/01/2025 3.93 21 Mar 2025  J.P. Shakti Const. Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
242 73411Improvement work by interlocking tiles from Sector-01 Vivek Anand Park to Uttaranchal Plaza in Ward-54 Vasundhara. 4.05 05/03/2025 4.05 21 Mar 202529 May 2025 29 May 2025 Naman Enter. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
243 735 Work of drain and interlocking tiles from Jagrish's house to Pramod's house and from Pramod's house to Yogesh's house in Ward 42, Bamheta. 4.09 20/01/2025 4.09 21 Mar 2025  Khoshla Asso. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
244 737 Patch repair work by CC in front of B-37, B-01, A-92/04 and A-92 in Ward 65, Jeevan Vihar. 4.26 20/01/2025 4.26 21 Mar 2025  Gourav Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
245 738 In Ward-92, work of drain and CC road and RCC culverts in the streets near Shri Jameel to Mehndi, Sabir to Aqeel, Naeem, Meharban, Samsu, Ambedkar Bhawan and Mosque. 4.31 20/01/2025 4.31 21 Mar 2025  A.H. Const Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
246 73915Painting work on wall from gate of Mangalam Enclave Sec-17A in Ward-74 Sec-17 Vasundhara via C-402 to C-501. 4.37 05/03/2025 4.37 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
247 740 Ward-58 Mawai: Work of repairing the damaged road in Bhagwati Sharma to Thakur Prem Singh, Tilak to Sitaram Sharma, Rajendra Prasad Sharma to Deepak Public School, Pal Wali Gali by C.C. 4.52 10/01/2025 4.52 21 Mar 2025  Vansh Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
248 741 Construction work of CC road and drain in the street near Gurudwara, Bajariya, Ward-33. 4.65 10/01/2025 4.65 21 Mar 2025  Vinod kumar Contr. Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
249 742 Work of interlocking tiles on drain and side track from E-67 to the corner of Forest Department in Ward 71, Sanjay Nagar. 4.68 10/01/2025 4.68 21 Mar 2025  Prakesh Const.Co. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
250 743 Work of drain and RCC, net repair and CC road construction in front of Mr. Nisar, Arman, Lokesh, Nizam, Farid Alauddin, barber shop in Ward-93, Kaila Bhatta and Aman Colony. 4.74 10/01/2025 4.74 21 Mar 2025  J.P. Shakti Const. Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
251 817 Road and drain construction work through interlocking tiles on the damaged road from Sanjay Verma's house to Ramnivas's house in Ward 58, Sector 09, Shivpuri Gali No. 13. 8.26 30/01/2025 8.26 21 Mar 2025  Pradhan Contr. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
252 820 Ward-41 Jhandapur, Paleram and Gupta ji and Sunil and Desi Theka and Netrapal damaged lanes, drain repair and street improvement work through C.C. 8.33 05/03/2025 8.33 21 Mar 2025  V.K. Contr. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
253 821 Work of drain and interlocking tiles in the damaged street from Chaurasia's house to Ramesh and from Salim's house to Yogendra's house in Ambedkar Nagar, Ward 38, Arthala. 8.33 30/01/2025 8.33 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
254 822 Construction work of drain and interlocking tiles in the damaged street from Kala Tractor Wala to Asraf Ali, Zulfiqar Wali Gali in ward 63,66 and from Salim's house to Yakub's house. 8.45 30/01/2025 8.45 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
255 8235Construction work of CC road and drain in the side street of Ward-50, Sihani Road Garbage Factory. 8.45 05/03/2025 8.45 21 Mar 202510 Jun 2025 10 Jun 2025 Shyam Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
256 7449Work of C.C. road from Rajveer Pradhan's house to Deshveer Singh's house and from Ram Kishan's house to Ramu Pandit's house in ward no. 53, Raispur. 4.79 05/03/2025 4.79 21 Mar 202510 Jun 2025 10 Jun 2025 Shri Radha Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
257 824 Ward-61: Work of interlocking tiles on side plate from underpass to big pillar. 8.52 05/03/2025 8.52 21 Mar 2025  V.S. Buildcon.Co. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
258 825 Construction of road and RCC drain through interlocking tiles on the damaged road from Dayaram's house to Anil's house in Ward 58, Sector 09, Shivpuri Gali No. 10. 8.56 30/01/2025 8.56 21 Mar 2025  Pardhan Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
259 826 Road repair work by Danes on the damaged road from 14/703 to 14/715 in Ward-36 Sector-14. 8.60 30/01/2025 8.60 21 Mar 2025   POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
260 827 Work of interlocking tiles on drain and Dense and side track from Mukesh's house to Harish's house in Ward-08, Maliwada. 8.66 30/01/2025 8.66 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
261 829 Work of drain and Dense and interlocking tiles on side track from Dr. Mir Singh Saini to Vyas Medical in Ward-08, Maliwada. 8.68 30/01/2025 8.68 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
262 830 Construction work of C.C. road and drain in the damaged street from Narendra's house to Hari Singh's house, from Pramod's house to Soni's house, from Tekchand to Fauji's house, from Surendra's house to Mahesh's house, from Sundari's house to Sanjay's house in Ward 27 Sain Vihar. 8.71 30/01/2025 8.71 21 Mar 2025  Pardhan Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
263 745 Work of drain and interlocking tiles from Veer Mahendra's house to Omveer's house in Ward 53, Raispur. 4.88 10/01/2025 4.88 21 Mar 2025  Rahul Builders Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
264 831 Construction work of C.C. road in Balmiki Chowk and internal lanes in Ward-41 Jhandapur. 8.71 05/03/2025 8.71 21 Mar 2025  Chandra Mohan Singh Raguwanshi POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
265 832 Construction work of CC road and RCC drain from Nandan Singh's house to Mehra's house in Ward-04, Thana Road D Block. 8.73 30/01/2025 8.73 21 Mar 2025  A.H. Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
266 833 Construction work of drain and C.C. street in the street behind Bhardwaj showroom in ward 70, Janakpuri and street no. 05 where Bhardwaj Chakki residence is located. 8.78 30/01/2025 8.78 21 Mar 2025   Vinod KumarJunior Engineer MEMBER KOTA 2024-25(II) 
0%
267 834 Construction work of drain and interlocking tiles in the damaged street from Chander Market to Munna Lal's house in Gagan Vihar, Ward 20, Bhaupura. 8.96 30/01/2025 8.96 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
268 835 Construction work of drain and interlocking tiles in the damaged street from Avdesh's house to Dayaram Jatav's house in Ward 29 Bhaupura Kuti. 9.03 08/02/2025 9.03 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
269 836 Road repair work done by C.C. on damaged road from Bijendra Chaudhary to Mahesh, Ram Kishan to Pyare Lal, Vipul to Jagpal's house in Ward-01, Krishna Nagar Bagu 9.09 08/02/2025 9.09 21 Mar 2025  A.S. Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
270 837 Road improvement work by Dens on the damaged road on the side of Agrasen Park in Ward 86, Rajendra Nagar Sector 05. 9.11 08/02/2025 9.11 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
271 746 Work of construction of culvert in front of R-10/26 and 11/65 in Ward 84, Rajnagar. 4.93 10/01/2025 4.93 21 Mar 2025  V.S. Buildcon.Co. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
272 74721Improvement work by interlocking tiles from B Block to C Block till Alaknanda Apartment in Ward 94 Suryanagar Rampuri. 5.99 04/03/2025 5.99 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
273 749 Construction work of drain and C.C. road from Shahid Qureshi's house to Rashid Malik's house and in Naushad and Zahid's lane in ward-93, Kaila Bhatta. 5.00 10/01/2025 5.00 21 Mar 2025  A.H. Const Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
274 750 Construction work of culvert and RCC drain near Anna Meat Factory and Haji Iqbal in Peer Colony of Ward-40. 5.11 05/03/2025 5.11 21 Mar 2025  Mohit Choudhary POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
275 753 Ward-26 Gaupuri Gali No. 03 from Irfan to Goyal Bhawan, Chowdhary. Construction work of drain and CC road in front of the dairy. 5.35 10/01/2025 5.35 21 Mar 2025  A.H. Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
276 755 Work of drain and interlocking tiles from Sunil's house to Mahavir's house in Ward 18, Rajapur. 4.54 27/02/2025 4.54 21 Mar 2025  Khoshla Asso. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
277 756 Construction work of CC road and drain in the street from Ramkali (House No. 29) to Babli Kasana (House No. 35) in Ward-09, New Arya Nagar. 5.43 27/02/2025 5.43 21 Mar 2025  A3R Enter. Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
278 757 Work of drain and interlocking tiles from Samsuddin's house to Brahmapal's house in Ward 38 Arthala and in the damaged Kale street. 5.51 27/02/2025 5.51 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
279 758 Work of drain and interlocking tiles from Pratim's house to Tikam's house in Ward 42, Bamheta. 5.52 27/02/2025 5.52 21 Mar 2025  Khoshla Asso. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
280 759 Construction work of drain from Jagdish's house to Pandey's residence in ward 29 Bhaupura Kuti and construction of interlocking tiles in the damaged street. 5.64 27/02/2025 5.64 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
281 760 Construction of drain and C.C. road from Shri Abdul Latif's house to Akram's house in Ward-92, Islamnagar. 5.65 27/02/2025 5.65 21 Mar 2025  A.H. Const Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
282 76112Work of construction of damaged wall of STP located in Ward 89, Vaishali Sector 5. 5.66 05/03/2025 5.66 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
283 762 Construction of drain and C.C. road in the lanes from Shri Ashraf to Ishak and Aas Mohammad in Ward-92, Chaman Colony. 5.75 27/02/2025 5.75 21 Mar 2025  A.H. Const Preeti BansalJunior Engineer MEMBER KOTA 2024-25(II) 
0%
284 763 Work of interlocking tiles in Ward 94 Suryanagar A Block, from A-81 to A-78 and A-108 D to A-108 A in front of the market towards the market and from A-68 to A-69 and towards the park near the tax office. 5.81 05/03/2025 5.81 21 Mar 2025  Mohit Choudhary POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
285 766 Work of interlocking tiles in front of Ward 65, Kavinagar KG-121, KF-106. 6.11 27/02/2025 6.11 21 Mar 2025  V.S. Buildcon.Co. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
286 768 Construction work of drain and C.C. road in the damaged Abbas lane from Guddu Cycle to Maulana Nafees' house and from Ayan to Aslam Kot and from Yadav's house to the temple in ward 34 Shaheednagar Pratham. 6.16 27/02/2025 6.16 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
287 77019Repair work of damaged road from H.No. 304 to H.No. 264 under Ward 87 Justice Section 3 through interlocking tiles. 6.19 05/03/2025 6.19 21 Mar 202503 Jun 2025 03 Jun 2025 R.R. Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
288 771 Work of drain and interlocking tiles from Gullu's house to Nishant's house in Ward 24, Kajipura. 6.22 27/02/2025 6.22 21 Mar 2025  Chandra Mohan Singh Raguwanshi Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
289 772 Work of drain and interlocking tiles from Rajendra's house to Akhilesh's house and from Balli's house to Nisha's house in Ward 24, Krishna Vihar. 6.23 27/02/2025 6.23 21 Mar 2025  Rahul Builders Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
290 7751Construction work of interlocking tiles from Ward-74 S-17 B 601 to the corner of Shaheed Bhagat Singh Park. 6.27 05/03/2025 6.27 21 Mar 202524 May 2025 24 May 2025 J.P. Shakti Const. Sanjay GangwarJunior Engineer MEMBER KOTA 2024-25(II)Completed
100%
291 7768Work of interlocking tiles in Ward 62, Govindpuram Ganesh Vatika. 6.33 05/03/2025 6.33 21 Mar 202510 Jun 2025 10 Jun 2025 Shantanu Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
292 777 Work of park side interlocking tiles in front of Building No. 403 to Building No. 387 and Building No. 380 to Building No. 229 in Ward 65, Vivekanandnagar. 6.34 27/02/2025 6.34 21 Mar 2025  Rahul Builders Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
293 77810Improvement work by interlocking tiles in house no. B 133 to B-134 in B-block in Ward-97 Ramprastha. 6.36 05/03/2025 6.36 21 Mar 202529 May 2025 29 May 2025 A.V. Enter. Sanjay GangwarJunior Engineer MEMBER KOTA 2024-25(II)Completed
100%
294 780 In Ward-08, Maliwada, construction of drain and interlocking tiles from Mittal Hardware to Fashion Wear Tailors and road improvement work by DANs and interlocking tiles on the side track from Suraj Sain / Shri Shyam Sweets to Rakesh Saini. 6.49 20/01/2025 6.49 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
295 782 Construction work of RCC drain and CC road from Arif to Maruf in Ward-35 Akbarpur-Baharampur. 5.84 20/01/2025 5.84 21 Mar 2025  Vansh Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
296 784 Road improvement work through interlocking tiles from E-732 to E-725, E-749 to E-756 in E-block and from F-149 to F-104 in F-block, Ward 51. 6.65 20/01/2025 6.65 21 Mar 2025  JSB Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
297 7863Work of interlocking tiles on the side plate parallel to the park in H.No. A-40 to 44, H.No. A-44 to 50, H.No. A-68 to 78 in Ward-68 Brajvihar. 6.72 05/03/2025 6.72 21 Mar 202524 May 2025 24 May 2025 A.P Const.Co. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
298 787 Work of construction of interlocking tiles and drain in house no. D/212 to D/222 and from D/141 to Tyagi Dairy in Ward-06, Nandgram D Block. 6.75 20/01/2025 6.75 21 Mar 2025  Sachin Builders NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
299 7884Improvement work by interlocking tiles from 5/1521 to 1527 in Ward-54 Vasundhara. 6.79 05/03/2025 6.79 21 Mar 202526 May 2025 26 May 2025 Roop Rakh Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
300 789 Work of drain and interlocking tiles in Omveer wali and other small kutcha lanes in New Chitrakoot Colony of Ward 44 Sanjay Colony 6.83 20/01/2025 6.83 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
301 792 Wire fencing work near urinal in front of Brahmaputra Lane in Ward 89, Vaishali Sector 5 7.03 05/03/2025 7.03 21 Mar 2025  H.R. Builders POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
302 793 Construction work of CC road and drain from Sharma Doctor to Malti's house and from Pradeep Verma to HM Mortuary in Ward-17, Seva Nagar. 7.03 21/02/2025 7.03 21 Mar 2025  Pramood Kumar Singhal NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
303 794 Construction of drain and C.C. road in the lanes from Shri Rizwan to Yusuf Chaudhary, Jameel Rehman and Haji Ishak to Hajmuddin at Kabutar Chowk in Ward-93, Aman Colony. 7.10 19/02/2025 7.10 21 Mar 2025  A.H. Const NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
304 795 Construction work of interlocking tiles on CC road and side track from C-34 to C-37 in C Block of Patel Nagar II via Rakesh Jain to Prem Tyagi's plot. 7.14 30/01/2025 7.14 21 Mar 2025  Satname Asso. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
305 843 Construction work by interlocking tiles in the damaged street from Block K to Panchsheel Park in Ward 83 Shyampur X0. 9.46 08/02/2025 9.46 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
306 8444Work of construction of interlinking tiles and drain in Ward-11, Bombay Colony Om Prakash DS 433 and DS 222 and Sadhu se Shanti, and Kashi Dairy Wali Gali. 9.47 05/03/2025 9.47 21 Mar 202510 Jun 2025 10 Jun 2025 Shantanu Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
307 845 Construction work of CC road and drain from Raju's shop to Gaurav Gupta's house in Ward-25, Sector 09 L Block. 9.47 08/02/2025 9.47 21 Mar 2025  Zuber Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
308 846 Work of construction of interlocking tiles and drain from Shri Shyam Bhawan to Ishwar Kashyap and from Devendra's house to Vinod's house in Ward-32, Harvansh Nagar. 9.49 08/02/2025 9.49 21 Mar 2025  Shri Sai Enter. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
309 847 Work of construction of interlinking tiles and drain in front of house no. A/266 and A/253 and Mahesh and Jaiprakash and E/356 in Ward-11, Deendayalpuri II A Block. 9.50 08/02/2025 9.50 21 Mar 2025  Zuber Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
310 848 Construction work of drain and CC road from Neeraj to Sharon Public School in Ward-26 Gaupuri Gali No.-04. 9.52 08/02/2025 9.52 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
311 849 Construction work of table top speed breakers at various places in Ward 84, Rajnagar. 9.52 08/02/2025 9.52 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
312 8506Work of construction of interlocking tiles on the side track from the service line behind Rana Pratap School in Ward-69, Lohianagar till the PWD warehouse and from the women police station till the house of Om Prakash Singh. 9.54 05/03/2025 9.54 21 Mar 202510 Jun 2025 10 Jun 2025 Balaji Const.Co. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
313 851 Construction work of drain and C.C. road in the damaged lane from Sain's house to Mohammadi Mosque in ward 90 Shahidnagar III. 9.57 08/02/2025 9.57 21 Mar 2025  Star Enterprises 7503186969Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
314 852 Work of construction of interlinking tiles and drain from Pramila to Dharamveer in Ward-11, E Block and Free Hold. 9.59 08/02/2025 9.59 21 Mar 2025  A.P. Const.Co. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
315 854 Construction of C.C. road and drain in Bombay Wali Gali in Ward-59, Old City Chandrapuri and Pandit Wali Gali at Delhi Gate. 9.62 08/02/2025 9.62 21 Mar 2025  Navdha Const NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
316 855 Construction work of interlocking tiles road and drain in the damaged street from Mukesh Raghav's house to Praveen Kumar's house, from Ramesh Pandit's house to Kunwarpal's house in Ward No. 27, Shanti Nagar. 9.65 08/02/2025 9.65 21 Mar 2025  Dhanwantri Veer Jhohari SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
317 8575Construction work of RCC drain and CC road from Rohit Modern School to Hariom Grocery Store in Ward-35 Akbarpur Bahrampur. 9.67 06/03/2025 9.67 21 Mar 202516 Jun 2025 16 Jun 2025 Balaji Const.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
318 858 Repair work of damaged road from house no. 15/33 to Vasundhara Hospital in ward-74 by laying interlocking tiles on Dense and site track. 9.69 08/02/2025 9.69 21 Mar 2025   POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
319 859 Work of drain and interlocking tiles in the damaged lane from Lochan's house to Shambhu Sharma and Siddharth Public School and from Jeet Pal's house to Ram Singh's house in Ambedkar Nagar, Ward 38, Arthala. 1 9.69 08/02/2025 9.69 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
320 860 Construction work of drain from Jitender's house to Hanuman temple and from Hanuman temple to Sachchinand Rai's house in ward 05 Gagan Vihar and construction work of interlocking tiles in the damaged street. 9.70 20/01/2025 9.70 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
321 861 Construction of C.C. road and drain in Mandir Wali Gali and Sanjay Wali Gali in Ward-59, Old City Chandrapuri. 9.75 20/01/2025 9.75 21 Mar 2025  Madan Const NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
322 862 Construction of drain and C.C. road in ward-93, Kaila Bhatta from Vakil Grocery via Qadir to Suresh Yadav and Shiv Mandir and from Shahdab to Faragad at Kabutar Chowk. 9.80 20/01/2025 9.80 21 Mar 2025  J.P. Shakti Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
323 863 Road improvement work by Danes from D-124 to Shri Seva Ram Tyagi's house in Ward 67, Sanjay Nagar D-Block, D-67 to D-81, D-103 to D-109, D-92 to D-85. 9.86 20/01/2025 9.86 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
324 864 Construction work of interlocking tiles road and drain in Ward-50, Prem Enclave, Street No. 10, Prayer Hall, Street No. 12 and from Deepak's house to Ravish Tyagi's street. 9.90 20/01/2025 9.90 21 Mar 2025   Vinod KumarJunior Engineer MEMBER KOTA 2024-25(II) 
0%
325 865 Work of interlocking tiles in Ward 67, Rajnagar Sector-08 from R-08/33 to R-08/36, R-08/37 to R-08/42 and in front of Vardaan Hospital. 9.92 20/01/2025 9.92 21 Mar 2025  Roop Rakh Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
326 866 Work of construction of RCC drain from building no. 57 to building no. 115 in ward 67, Rajnagar section-08. 9.81 20/01/2025 9.81 21 Mar 2025  Keshram Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
327 867 Work of drain and interlocking tiles from Vedpal's house to Subhash Tyagi's house in Ward 46, Duhai. 9.93 20/01/2025 9.93 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
328 868 Construction work of RCC drain and road through CC from Satyapal's house to Sonu Pal's house to Devendra Raghav's house in Ward-43, Kadkad Model Village. 9.96 05/03/2025 9.96 21 Mar 2025  V.K. Contr. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
329 869 Construction of C.C. road and drain from the ancient well to Suresh's house under Daulatpura flyover, Ward-22. 10.05 20/01/2025 10.05 21 Mar 2025  Shiv Const.Co. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
330 8707Construction work of interlocking tiles and drain on the damaged road from Jain Saree to Mayank's house, from Pappu to Anurag's house, from Robil Traders to Satendra's house, from Mukesh Chaudhary's house to Bina Bhawan, from Chhabi's house to Sanjay's house in Ward 27, Shanti Nagar. 10.17 21/03/2025 10.17 21 Mar 202516 Jun 2025 16 Jun 2025 Anjali Const.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
331 871 Work of drain and interlocking tiles from Bhima's house to Mastram's house in Ward 42, Bamheta. 10.18 20/01/2025 10.18 21 Mar 2025  Khoshla Asso. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
332 872 Work of construction of interlinking tiles and drain from Tularam to Rampal Fauji, Rajveer to Anar Singh's house in Ward-32, Harvanshnagar. 10.19 20/01/2025 10.19 21 Mar 2025  Mahalaxmi Infra. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
333 873 Construction work by interlocking tiles on unpaved site track from Ward 80 Rajendra Nagar A-32 to Radha Krishna Temple. 10.21 20/01/2025 10.21 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
334 875 Slab work on drain from KC/E-61 to New Hair Salon in Ward 91, Kavi Nagar. 10.28 20/01/2025 10.28 21 Mar 2025  A.S. Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
335 876 Repair work of damaged road from Pyare Lal to Kiran, Oyo Hotel to Rajendra's house in Ward 01, Krishna Nagar Bagu through C.C. road. 10.31 20/01/2025 10.31 21 Mar 2025  A.S. Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
336 877 Construction work of drain and interlocking tiles in the damaged street from Qazmi Mosque to Hafiz Yusuf's house in ward 66. 10.32 05/03/2025 10.32 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
337 878 Improvement work through drain and interlocking tiles in the service lane from D-35 to D-42 and D-34 to D-19 in D Block of Ward-97. 10.41 05/03/2025 10.41 21 Mar 2025  Sholanki Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
338 879 Repair work of damaged road from house no. 4B/1157 to house no. 4B/1185/1187 park corner till Shiv Ganga Society gate no. 02 in ward-61 Vasundhara by Dense. 10.43 21/03/2025 10.43 21 Mar 2025  R.G. Builtach Engg. Ltd. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
339 880 Construction work of drain and interlocking tiles in the damaged street from Imran's house to Bose Service Center in Ward 63,66. 10.53 20/01/2025 10.53 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
340 881 Repair work of drain and C.C. in the damaged lane from Nandu's house to Sushil's house in Shahid Pyarelal Colony, Ward 60, Shyampur Main. 10.54 20/01/2025 10.54 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
341 8824Ward-25, Vijayanagar: Work of interlinking tiles on the road between D Block and C Block, D-7, D-6, C-51, C-61, on the road near the zonal office park, on the sidewalk of the road at various places and in the street named Akhit Roshan. 10.58 21/03/2025 10.58 21 Mar 202516 Jun 2025 16 Jun 2025 Pargati Enter. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
342 884 Ward 01, Bhim Nagar, lane no. 07 from Shiva Book Depot to Gajraj, from Gajraj to Mahesh's house, lane no. 10 from Sundar Pal to Mukesh, lane no. 08 from L.R. Public School to Meena Kutir, repair work of drain and improvement of damaged road through C.C. road. 10.78 20/01/2025 10.78 21 Mar 2025  JSB Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
343 885 In Ward-12, Balupura, from Dinesh Sharma to Dharamshala via Kalu Dairy and from Bablu's house to Shriram Marble, construction of a side drain and C.C. road. 10.78 20/01/2025 10.78 21 Mar 2025  A.P. Const.Co. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
344 886 Repair work of drain and C.C. in the damaged lane from Nathuram's house to Nandu's house in Ward 60 Shyampur Main, Shahid Pyarelal Colony, GT Road. 10.84 20/01/2025 10.84 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
345 888 Construction work of interlocking tiles and RCC drain from E-849 to E-970 in Ward-51 E-Block. 10.92 20/01/2025 10.92 21 Mar 2025  J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
346 889 Repair work of drain and C.C. in the damaged lane from Sushil's house to the temple in Shahid Pyarelal Colony, Ward 60, Shyampur Main. 10.95 20/01/2025 10.95 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
347 8919Work of laying tiles on the side track of the market road (from Kalig Marg to Yashoda Marg) and the Gaur Ganga II road in Ward 77, Vaishali Sector 4. 11.28 05/03/2025 11.28 21 Mar 202529 May 2025 29 May 2025 Naman Enter. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
348 892 Construction of drain and C.C. road from Jitendra's house to Kamal's house and from Sushil Kumar's house to Anil Gupta's house and from Lokesh Kumar's house to Laluram confectionery shop in ward-12, Kanjimal. 11.29 20/01/2025 11.29 21 Mar 2025  Zuber Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
349 893 Road improvement work by CC and interlocking tiles work on side patri from plot no. 18/16 to plot no. 18/20 on Mangal Bazar road in ward-43 Kadakad model. 11.32 05/03/2025 11.32 21 Mar 2025  A.S. Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
350 894 Work of drain and interlocking tiles from Sanju's house to Manveer's house in Ward 24, Kajipura, Satpal wali gali, from Manveer's house to Dharmendra's house. 11.32 20/01/2025 11.32 21 Mar 2025  Khoshla Asso. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
351 895 Construction work of CC road and RCC drain from house no. D/50 to house no. D/226 in Ward-04, Thana Road D Block. 11.41 20/01/2025 11.41 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
352 8967Road improvement work by CC and interlocking tiles work on side patti from plot no. 18/14 to plot no. 18/16 on Mangal Bazar road in ward-43 Kadakad model. 11.54 05/03/2025 11.54 21 Mar 202526 May 2025 26 May 2025 Gourangi Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
353 897 Work of construction of interlinking tiles and drain in Ward-32, Harvanshnagar, from Rajendra Tyagi's house to Nempal's house, Ram Adhar wali gali, from Indrapal's house to Rakesh Sharma's house and from Rajwant to Sanjay's house. 11.69 20/01/2025 11.69 21 Mar 2025  Yes Enter. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
354 898 Work of drain and interlocking tiles from Arvind's house to Lakhichand's house in Ambedkar Nagar, Ward 38, Arthala and in the damaged street of Kishan Pal. 11.72 20/01/2025 11.72 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
355 899 Construction of drain from Ramgopal's house to Sajeev's house in Valmiki Mohalla, Ward No. 57, Makanpur village and road repair work through interlocking tiles. 11.84 05/03/2025 11.84 21 Mar 2025  Pardhan Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
356 900 Ward-59, Old City, Khazanchi Wali Gali in Delhi Gate, Kishore Paan Wali Gali at Sihani Gate, C.C.C. and drain work in the square near the temple in Mohalla Sohanlal. 11.93 20/01/2025 11.93 21 Mar 2025  Navdha Const NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
357 901 Road improvement work by interlocking tiles from Jan Seva Kendra to Mahadev Temple via Ayush General Store on the road in front of Janta Opticals in Ward 57, Nyay Khand 2. 11.97 05/03/2025 11.97 21 Mar 2025  Mohit Choudhary POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
358 903 Construction work of drain from Jitendra's house to Kapil's house in ward 05 Gagan Vihar and construction work of interlocking tiles in the damaged street. 12.04 20/01/2025 12.04 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
359 904 Work of drain and interlocking tiles in the damaged lane from K.P. Singh's house to house no. 353 G.R. Singh's house in ward 44 Sanjay Colony. 1 12.11 20/01/2025 12.11 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
360 905 Construction work of drain and C.C. in the damaged lane from Salim's house to Shri Chand's house in Bachcha Colony, Ward 37, Shalimar Garden. 12.14 20/01/2025 12.14 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
361 9066Construction work of C.C. road from near Radha Kunj M.I.G gate to C-380 in ward-68 Brajvihar. 12.17 21/03/2025 12.17 21 Mar 202526 May 2025 26 May 2025 Gourangi Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
362 907 Construction work of drain and C.C. road in the damaged lane from Ratiram's house to Sameena's house and from Jimal's house to Mustafa Mosque in ward 90 Shahidnagar III. 12.22 20/01/2025 12.22 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
363 909 Construction of road and RCC drain through C.C. on the damaged road from Manoj's house to Sunita's house, from Tilak's house to Bhagat Singh Yadav's house in Ward 14, Sarvodayanagar. 12.38 20/01/2025 12.38 21 Mar 2025  Manveer Singh Cont. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
364 912 Construction work of RCC drain and CC road in Gupta ji Vinesh Sharma and Pal Halwai lanes in ward-40 Sahibabad village. 12.72 05/03/2025 12.72 21 Mar 2025  Mohit Choudhary POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
365 913 Construction work of drain and interlocking tiles in the damaged street from Javed's house to Haji Riyazudin's house in Ward 28, Nilamani Colony. 12.75 20/01/2025 12.75 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
366 9148Road repair work through CC on the damaged road from A-92 to A-84 in Ward 94 Suryanagar Rampuri. 12.82 05/03/2025 12.82 21 Mar 202526 May 2025 26 May 2025 Roop Rakh Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
367 915 Construction work of drain and C.C. in the damaged lane from B 55 to B 49 in ward 10 DLF. 12.96 20/01/2025 12.96 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)In Progress
20.00%
368 916 Construction work of drain and CC road from Aditya to Ram Avatar Sharma’s house via Vicky Rawat in Ward-31, Vishwas Nagar. 12.99 20/01/2025 12.99 21 Mar 2025  Choudhary Asso. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
369 917 Improvement work by Dense on the road in front of house no. K/45 to K/51 and other places in K Block, Ward-96, Nehrunagar III. 13.02 20/01/2025 13.02 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
370 918 Construction work of RCC drain and CC road from Birpal to Niranjan, Aliya to Shaukeen, Chaman to Taj, Tayyab to Khillu's house in Veer Abdul Hameed Colony in Ward 48, Mirzapur. 13.04 20/01/2025 13.04 21 Mar 2025  J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
371 919 Road improvement work by interlocking tiles from E-400 to E-716, E-764 to E-757 in Ward-51 E-Block. 13.04 20/01/2025 13.04 21 Mar 2025  A.S. Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
372 920 Construction of C.C. road and drain near Gafi Chowk in Ward-23, Kailashnagar from Dr. Kaushik to Gyani's house, from Vinod to Madhu's house, from Rajveeri to Brijesh, from Vishnu to Sachin's house and from Ramlal to Santosh's house. 13.09 20/01/2025 13.09 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
373 921 Construction work of damaged wall from house no. A-101 to A-801 in Ward-74 Sec-17 Vasundhara. 13.09 08/05/2025 13.09 21 Mar 2025  Global Engg. & Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
374 922 Repair work of side track towards park from KG-73 to KG-62 via KG-74 in G-Block, Ward 65, Kavi Nagar. 13.12 20/01/2025 13.12 21 Mar 2025  Global Engg. & Infra. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
375 923 Ward-13, Ghukna Vijaylaxmi Provision from in front of Pawan Kumar, Yad Ram's house to Ramesh Gupta, Ratanpal's house to Ajay Tyagi, Shakuntala Niwas to Jagjivan Niwas and from Shri Chand Tyagi's house to Lokesh Tyagi. 13.13 20/01/2025 13.13 21 Mar 2025  J.P. Shakti Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
376 924 Work of drain and interlocking tiles in the unpaved lane from Sanjay's house to Shaudan's dairy in New Chitrakoot Colony, Ward 44, Sanjay Colony. 13.15 20/01/2025 13.15 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
377 925 Construction work of drain and CC road from Shriramnath Tyagi via RNT School and from Kaushal Sharma to Dheeraj's house in Ward-31, Vishwasnagar. 13.19 20/01/2025 13.19 21 Mar 2025  Choudhary Asso. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
378 926 Construction work of drain and interlocking tiles in the damaged street from Rajkumar Yadav's house to Charan Pal's house, from Rajkumar's house to Laxman Prasad's house and from Bhoop Singh's house to Sudhir's house in ward 45, Karaheda. 13.27 20/01/2025 13.27 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
379 928 Construction work of C.C. road and drain in Ward-33, from Nasratpura Jain temple to Manish's house, Sharma medical store lane, Sangeeta Kinnar lane, Hanuman temple lane and Subhash lane in Premnagar till Virendra Kumar lane and Balvindra lane. 13.36 20/01/2025 13.36 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
380 929 Construction work of drain and CC road from Choudhary Singh Raj Bhati to Billu's house in Ward-26, Gaupuri Gali No.-03. 13.42 20/01/2025 13.42 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
381 930 Improvement work by Danes on the roads in front of H/46 & H/102 & H/71 & H/59 in Ward - 19, H Block. 13.43 20/01/2025 13.43 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
382 931 Construction of culvert on the big drain in front of Choudhary Bhawan in Ward 91, Kavi Nagar. 13.52 20/01/2025 13.52 21 Mar 2025  Dynamic Asso. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
383 9343Construction work of C.C. road and drain from the house of Kuldeep Giri near the gate in ward-52, Kotgaon to the houses of Mishra ji and Sangram Singh. 13.63 21/03/2025 13.63 21 Mar 202510 Jun 2025 10 Jun 2025 Shri Radha Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
384 935 Construction work of RCC drain and road through CC from Narpendra's house to corporation boundary and up to Upadhyay's house and up to Asharam's house in ward-40 Sahibabad village. 13.64 05/03/2025 13.64 21 Mar 2025  Mohit Choudhary POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
385 936 Construction of drain and C.C. road from Shri Jameel to Shri Shahzad and from Masjid to Shahid's house in Ward-92, Chaman Colony. 13.66 20/01/2025 13.66 21 Mar 2025  A.H. Const NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
386 937 Construction work of interlinking tiles and drain in Pammi wali gali in ward-49, A block, the lane opposite the tubewell in C block and C/641 and C/642 and the lane opposite the park. 13.76 20/01/2025 13.76 21 Mar 2025  Anuj kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
387 9386Construction work of RCC drain and CC road from Laxmi Kirana Store to Rohit Modern School in Ward-35 Akbarpur Bahrampur. 13.81 21/03/2025 13.81 21 Mar 202516 Jun 2025 16 Jun 2025 Balaji Const.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
388 939 Construction work of drain and interlocking tiles in the damaged street from Anish's house to Choudhary Allah Mayer's house and Anwar's house in Ward 64 Garima Garden. 13.99 20/01/2025 13.99 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)In Progress
50.00%
389 941 Construction work of damaged street from plot no. 597 to plot no. 102 in ward 78, Shalimar Garden Ex-2 by C.C. 14.12 20/01/2025 14.12 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
390 942 Improvement work by Danes on roads J/268 & J/254 & J/259 & J/269 in Ward - 19, J Block. 14.13 20/01/2025 14.13 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
391 943 Construction work of RCC drain and CC road from Shaukeen to Shawab, Safijan to Rushtam, Master ji shop to Shaan, Rustam to Sarwar's house in ward 48 Veer Abdul Hameed Colony. 14.18 20/01/2025 14.18 21 Mar 2025  J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
392 944 Improvement work of RCC drain and CC road from B-97 to B-112 in Ward 75, Lajpat Nagar. 14.23 20/01/2025 14.23 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Not Started
0.00%
393 945 Construction work of Triveni Dham road in Ward 73, Shalimar Garden through CC. 14.26 20/01/2025 14.26 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
394 946 Construction work of damaged drain from J.D. Chaudhary to Tayab Mosque and up to Asgar's house in ward 63,66. 14.32 20/01/2025 14.32 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
395 947 Road improvement work and RCC drain construction work by Dense from K-22 to K-36 in Block K of Ward-15 Sector-12. 14.34 20/01/2025 14.34 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
396 948 Road improvement work and RCC drain construction work by Dense from K-66 to Sai Car Decoration in K Block in Ward-15 Sector-12. 14.34 20/01/2025 14.34 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
397 949 Construction work of drain and interlocking tiles in the damaged street from Choudhary General Store to Koyal's house and from Koyal's house to Abubakr Mosque in Ward 64 Garima Garden. 14.40 20/01/2025 14.40 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
398 950 Construction work of damaged drain through RCC from GC Grand to the corner of Lotus Apartment in Vaibhav Khand, Ward 99. 14.51 05/03/2025 14.51 21 Mar 2025  M.D. Enter. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
399 951 Construction work of RCC drain and CC road from Selu Pandit's house to Waleshwar Tyagi's house in Ward-41 Jhandapur. 14.53 05/03/2025 14.53 21 Mar 2025  Aasutos Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
400 952 Construction work of damaged drain through RCC from the corner of Lotus Apartment to Gate No. 2 on Middle Circle Road in Vaibhav Khand, Ward 99. 14.56 05/03/2025 14.56 21 Mar 2025  Bijender Singh POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
401 953 Construction of road and RCC drain through C.C. on the damaged road from Rajkumar's house to Vijendra's house, from Tilak's house to Mahesh's house, from Bindal's house to Harbhajan's house, from Mahalaxmi General Store to in front of Dr. Mahor Clinic in Ward 14, Sarvodayanagar. 14.76 20/01/2025 14.76 21 Mar 2025  Zuber Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
402 954 Construction work of drain and interlocking tiles in the damaged street from L 245 to L 256 in L Block, Ward 85, Lajpat Nagar. 14.78 20/01/2025 14.78 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
403 955 Construction work of damaged street through C.C. from Plot No. 600/10 to Plot No. 597 in Ward 78, Shalimar Garden Ex-2. 14.86 20/01/2025 14.86 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
404 956 Construction work of drain and C.C. in the damaged lane from Mother Dairy to Jitendra's house in ward 82. 15.04 20/01/2025 15.04 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
405 957 Construction work with CC in the damaged street from Javed's house to Darshan's house in Ward 73, Shalimar Garden, Ganesh Puri. 15.30 20/01/2025 15.30 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Not Started
0.00%
406 958 Construction work by interlocking tiles on road site track in L Block, Ward 85, Lajpat Nagar. 15.55 20/01/2025 15.55 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
407 959 Improvement work and interlocking tiles by Dense on the road in front of house no. H-231 H-11/25 H-244 & H-239 & H-261 in Ward-39, Nerunagar III H-Block. 15.55 20/01/2025 15.55 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
408 960 Improvement work by Dense on the road in front of house no. H/295 H/197 H/282 & H/321 & H/268 in Ward-39, Nerunagar III H-block. 15.59 20/01/2025 15.59 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
409 961 Construction work of drain and interlocking tiles in the damaged street from Mahesh's house to Jai Prakash's house in Ward 45, Karhaida. 15.61 20/01/2025 15.61 21 Mar 2025  BIJENDER SINGH S/O HARPAL 9818305310Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
410 962 Work of construction of interlinking tiles and drains in the lanes adjacent to house no. 1089 and house no. 1071 and house no. 1092, ahead of F block Sachin Halwai in Ward-49, Nandgram. 15.92 20/01/2025 15.92 21 Mar 2025  Rishu Const NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
411 963 Construction work of damaged drain from Fakru Halwai's house to Kale's house and from Kale's house to Gullar's house in ward 63,66. 15.92 20/01/2025 15.92 21 Mar 2025  GLOBAL ENGINEERS AND INFRASTRUCTURE 9718152015Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
412 964 Work of CC road and tiles in C-354 & 349, 232 & 343 & C-345 and house no. 133 to 136 in Ward-52, New Punchavati. 16.11 20/01/2025 16.11 21 Mar 2025  Shriji Infra Project Pvt.Ltd. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
413 9656Work of drain and interlocking tiles from Randhir's house to Omveer's house in Ward 46, Duhai. 16.15 21/03/2025 16.15 21 Mar 202506 Jun 2025 06 Jun 2025 Balaji Const.Co. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
414 966 Construction work of drain and interlocking tiles in the damaged street from main road to Bunty Sharma's house and Saraswati Vatika School in ward 28, Mohan Colony. 16.26 20/01/2025 16.26 21 Mar 2025  KRISHNA ASSOCIATES 8512820110Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
415 967 Work of drain and interlocking tiles from Arjun Koch's house to Pawan's plot in Ward 30, Surya Garden. 16.37 20/01/2025 16.37 21 Mar 2025  Cotack Builders Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
416 968 Construction work of drain and C.C. in the damaged lane from Ramesh's house to Somnath's house and from Madan Lal's house to B-65 in ward 82. 16.44 20/01/2025 16.44 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
417 969 Work of construction of interlocking tiles road and drain from Brijpal's house to Ankit and from Bhagmal's house to Manoj Dhobi in Ward-13, Ghukna. 16.91 20/01/2025 16.91 21 Mar 2025  Choudhary Asso. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
418 970 Work of construction of interlocking tiles and drain from in front of Gaushala to Hari Nagar and from Lovely Confectionery to Sukhpal's house on Ward-23, Kailash Nagar Gaushala Road. 17.31 20/01/2025 17.31 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
419 971 Construction work of interlocking tiles road and drain in Ward-22, Old Panchvati, from house no. 63/36 to SB Jain, NK Sharma gali and Aman wali gali. 17.48 20/01/2025 17.48 21 Mar 2025  S.D. Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
420 972 Construction work of drain and C.C. in the damaged lane from Mata Mandir to Library in Ward 10 DLF. 17.59 20/01/2025 17.59 21 Mar 2025  "Executive Engineer Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
421 973 Construction work of C.C. road and drain in front of Ward-17, Sevanagar Consul Hospital, from Jai Kishan Pal, Ganga Ram, Ramesh Singh to Sharma Dr. 18.07 20/01/2025 18.07 21 Mar 2025  R.R. Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
422 974 Improvement work of RCC drain and CC road in ward 75, Lajpat Nagar, from B-64 to B-49, on both sides of the park and from B-84 to the park, from B-76 to the park. 18.18 20/01/2025 18.18 21 Mar 2025  Charan singh contractor Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Not Started
0.00%
423 975 Resurfacing work from R-11/179 to ISKCON Temple in Ward 84, Rajnagar. 18.27 20/01/2025 18.27 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
424 976 Ward-96, Nehrunagar III, Improvement work by Dense on the road in front of Babulal School and the road in front of house no. B/61, B/82, near the park. 18.27 20/01/2025 18.27 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
425 977 Road improvement work by Dense from C/10 to Isar Tractor on the main road in Ward-09, Patel Nagar II C Block and work of interlocking tiles on the side track in front of C-01, C-02. 18.56 20/01/2025 18.56 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
426 978 Ward 83 Shyampur Ex0 from A-35 to Malik STD and A-112 on the unpaved site track, interlocking tiles and road repair work of damaged road by dens 18.56 20/01/2025 18.56 21 Mar 2025  SHREEJI INFRA PROJECTS PVT LTD 9911102010Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)In Progress
20.00%
427 979 Resurfacing work in Ward 71, Sanjay Nagar from B-13HIG to B-208, B-208 to B-53 and from B-53 via B-86 to B-95. 18.88 20/01/2025 18.88 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
428 980 Construction work of interlocking tiles and RCC drain till the corner of the park in E-25 in Ward 55 E-Block. 18.91 20/01/2025 18.91 21 Mar 2025  Keshram Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
429 981 Construction work of drain from Life Medical Store to Prem Das's house in Ward No. 29, Bhaupura Kuti and laying of interlocking tiles in the damaged street. 19.19 20/01/2025 19.19 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
430 982 Construction work of RCC drain from Negi's house to old Shiv temple in ward-02 Rahul Vihar. 19.51 20/01/2025 19.51 21 Mar 2025  Zuber Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
431 983 Construction work by interlocking tiles on unpaved site track from Radha Krishna temple to 150 feet road in ward 80, Rajendra Nagar. 19.91 20/01/2025 19.91 21 Mar 2025  BIJENDER SINGH S/O HARPAL 9818305310Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
432 984 Construction work of drain and interlocking tiles in the damaged street from Dr. Kamal's house to Fauji Jang Bahadur's house in Ward 20, Bhaupura Rajiv Colony, Street No. 5. 19.95 20/01/2025 19.95 21 Mar 2025  KRISHNA ASSOCIATES 8512820110Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
433 985 Road improvement work by density on the damaged road around Buddha Park and upto 6/145, 6/119 in Ward 86, Rajendra Nagar Sector 05. 20.08 20/01/2025 20.08 21 Mar 2025  SHANTANU CONSTRUCTION 9871119064Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
434 986 Work of improving CC road from Negi's house to old Shiv temple in ward 02 Rahul Vihar. 21.23 20/01/2025 21.23 21 Mar 2025  Charan Singh Contr. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
435 987 Construction work of drain and C.C. in the damaged lane from Shrivastav's house to Arbaaz's house and from Arbaaz's house to Taban B-6 in ward 37, Shalimar Garden Bachcha Colony, Vikram Enclave. 22.59 20/01/2025 22.59 21 Mar 2025  ZUBER CONSTRUCTION CO 9350508259Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
436 988 Work of drain interlocking tiles from Mukesh to Gaurav and from the gate of Aashray Awas Yojana Colony to Aashray Road in Aashray Awas Yojana Colony in Ward-06, Deendayalpuri. 24.76 20/01/2025 24.76 21 Mar 2025  Anuj kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
437 989 Resurfacing work from C-203 to C-190 in Ward 62, Govindpuram C-Block. 26.13 20/01/2025 26.13 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
438 990 Road improvement work through drain and Dense from SH-211 to Islamuddin's house in Ward 18, Rajapur. 26.23 20/01/2025 26.23 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
439 992 Resurfacing work in lane number 02/188 to 02/220 and 02/240 in Ward 56, Chiranjiv Vihar Sector-02. 28.72 20/01/2025 28.72 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
440 993 Road and drain construction work from Carte Chowk to M-08 via Kamal Mandir, Jahanvi Beauty Parlour in Ward 47, Shastri Nagar. 29.31 20/01/2025 29.31 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
441 994 Work of drain and interlocking tiles from Mannadham Temple Meerut Road to Vinayak Properties in Ward 16, Morta. 29.77 20/01/2025 29.77 21 Mar 2025  Choudhary Asso. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
442 991 In Ward 30, Sadarpur, from Shri Mukesh's house to Shri Rajaram Khatik's house, from Shri Krishna Pal's house to Shri Gaur Singh's house, the street of Shri Indra Singh Khatik's house, the street of Mrs. Neetu's house, from Shri Hari's house to Shri Omveer's house, from Shri Jaipal's house to Shri Sunil's house, Shri Rajpal's street, from Shri Wasim's house to Shri Satish's house, from Shri Kalu Singh's house to Shri Vijaypal Master's house, Shri Jagsain's street and from Dr. Ramu's house to Shri Modli's house, work of drain and interlocking tiles. 27.59 20/01/2025 27.59 21 Mar 2025  Yes Enter. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
443 995 Remaining work of tiling on walls, electrical, sanitary and painting etc. in Ward-95 Kaila General Primary School I. 29.98 20/01/2025 29.98 21 Mar 2025  A.P. Const.Co. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
444 996 Improvement work of road from C/161 to A-131 in Ward-55 B-Block by Danes. 6.16 20/01/2025 6.16 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
445 997 Ward-46, Mainapur crematorium shed, altar and footpath construction work. 9.23 20/01/2025 9.23 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
446 998 Work of shed, altar and footpath in Ward-18, Rajapur Shastrinagar crematorium. 9.81 20/01/2025 9.81 21 Mar 2025  Trinetra Infra Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
447 999 Road improvement work in the street from Shiv Shakti Park to P-167A, P-134 in Ward-67, Sanjay Nagar P-Block. 9.84 20/01/2025 9.84 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
448 1000 Construction work of culvert near Rahul Danny's house on Rajapur Road in Ward-47, Mahendra Enclave. 2.50 20/01/2025 2.50 21 Mar 2025  Raguwanshi Builtack Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
449 1001 Road improvement work by laying interlocking tiles on the damaged road from Narendra to Budhram in Ward-27, Sain Vihar, Ramvati to Rahul in Gald No. 06, Chandrapal to Geeta in Gali No. 05, Vijay to Mishra. 11.27 20/01/2025 11.27 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
450 1002 Work of supply of precast concrete drain cover in Ward-67, Rajnagar and Sanjaynagar. 9.83 20/01/2025 9.83 21 Mar 2025  Sekhar Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
451 1003 Road improvement work by DANS from R-02/44 to R-02/50 and from Plot No. 124 to Plot No. 188 in Ward-84, Rajnagar Sector-02. 9.86 20/01/2025 9.86 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
452 1004 Drain repair work in front of LIC office in Ward-52, East Model Town. 6.76 20/01/2025 6.76 21 Mar 2025   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
453 1005 Road improvement work and side track work by Danes on the road leading to JKG School from Dr Anurag's house in E-block, via Vikas Khari's house to E-02, in Ward-14. 13.81 20/01/2025 13.81 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
454 10068CC road repair work of damaged road from Jan Seva Kendra to Rajveer to H-Block in Ward-03, Sector-09, Purana Vijay Nagar. 14.96 01/01/2025 14.96 21 Mar 202516 Jun 2025 16 Jun 2025 Gourangi Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
455 1007 Road improvement work by Dense from Ward-15, Sector-12 Shiv Juice Centre to L-Block via Ambedkar Park and work of interlocking tiles on side track. 29.82 20/01/2025 29.82 21 Mar 2025   SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
456 100922Construction work of toilet near Naini Restaurant in A-Block, Ward-94. 8.41 27/02/2025 8.41 21 Mar 202503 Jun 2025 03 Jun 2025 Mahalaxmi Infra. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
457 1010 Construction of toilet at the corner of GC Centre on Mall Road in front of Neeho Mall in Ahimsa Khand-2, Ward-98. 8.41 20/01/2025 8.41 21 Mar 2025  Ujjwal Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
458 10113Road improvement work by providing drain and interlocking tiles on the damaged road from Vikas' house to Surendra's house in Ward-27, San Vihar. 9.78 06/03/2025 9.78 21 Mar 202516 Jun 2025 16 Jun 2025 Pragati Enterprises SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
459 1012 Work of drain and interlocking tiles in the damaged street of Maha Lakshmi Property in Ward-45, Karhaida. 12.34 20/01/2025 12.34 21 Mar 2025  Govind Const. Vinod KumarJunior Engineer MEMBER KOTA 2024-25(II) 
0%
460 1013 Road improvement work through drain and CC from Satnam Furniture to the front of the park and from K-28 to the front of K-1307 in Ward-03, Vijayanagar Sector-09. 6.32 20/01/2025 6.32 21 Mar 2025  Manveer Singh Cont. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
461 1014 Ward - 01, Krishna Nagar Bagu, from DR Public School to Than Singh, Munna Lal to Hanuman Temple, Akil Kumar to Harkesh Shyam, repair work of damaged road behind DR Public School through CCC and construction of drain. 9.86 20/01/2025 9.86 21 Mar 2025  OTHER SHIV KUMAR SAROJ 8178016826 Junior Engineer MEMBER KOTA 2024-25(II)In Progress
50.00%
462 1015 Work of interlocking tiles from 01 to 24 in street no. 05 in H.No. 1 in Ward-86, Rajendra Nagar Sec-05. 4.23 20/01/2025 4.23 21 Mar 2025  MOHIT CHAUDHARY 9891903494Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
463 1016 Road and drain construction work through interlocking tiles from Vivek Sagar to Sudhir's house in Ward-01, Laththmar Colony. 2.54 20/01/2025 2.54 21 Mar 2025  Nirban Infra SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
464 1017 Construction work of drain and damaged street through C.C. from Salim's house to Bundu's house in Pappu Colony, Ward-10, DLF. 9.95 20/01/2025 9.95 21 Mar 2025  MOHIT CHAUDHARY 9891903494Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)In Progress
20.00%
465 1018 Construction work of toilet at the corner of Manoj Vihar on CISF Road in Ahimsa Khand 1, Ward-98. 8.41 20/01/2025 8.41 21 Mar 2025  M.D. Enter. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
466 1019 Road improvement work by interlocking tiles on the damaged road from Lal Mandir to Manoj Kumar, Mugdal to Neeraj in Ward-27, Dundahaida. 9.59 20/01/2025 9.59 21 Mar 2025  Pradhan Contr. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
467 1020 Repair of drain and improvement work of damaged road from Mahipal to Umesh Gupta in Ward-01, Krishna Nagar Bagu through CC road. 3.68 20/01/2025 3.68 21 Mar 2025  Nirban Infra SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
468 1021 Repair work of toilet adjacent to cremation ground in Ward-47, Mahendra Enclave. 6.46 20/01/2025 6.46 21 Mar 2025  Raguwanshi Builtack Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
469 1022 Road improvement work through drain and CC in Om Medicos street under Ghaziabad App 311 in Ward-03, Old Vijaynagar. 26.02 20/01/2025 26.02 21 Mar 2025  Keshram Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
470 1023 Work of interlocking tiles from H.No. 519 to 5/18 in Ward-86, Rajendra Nagar Sector-05. 8.23 20/01/2025 8.23 21 Mar 2025  RAJ ENTERPRISES 9958109476Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
471 1024 Patch repair work on left free cut at Hapur Chungi Chowk in Kavi Nagar Zone. 9.82 20/01/2025 9.82 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
472 1025 Construction work of drain and C.C. road in three small lanes namely Bori Wali, Beaton and Anand Halwai, lane no. 7, C-Block, Ward-70, Janakpuri. 9.86 20/01/2025 9.86 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)In Progress
50.00%
473 10267Work of interlocking tiles in front of Chaudhary Dharm Kate in Ward-46, Duhai Industrial Area. 9.66 10/03/2025 9.66 21 Mar 202510 Jun 2025 10 Jun 2025 A.K.G. Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
474 102710Work of interlocking tiles in front of Anil's factory in Ward-46, Duhai Industrial Area. 9.43 10/03/2025 9.43 21 Mar 202510 Jun 2025 10 Jun 2025 Shyam Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
475 1028 Construction work of C.C. road and drain in Ward-01 Bhimnagar Street No. 06 from Vikrant Building Material to Prakash, Kishan to Ramcharan, Sumit Advocate to Dr. Bengali. 6.70 20/01/2025 6.70 21 Mar 2025  Shawariya Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
476 1029 Construction work of C.C. road and drain in Ward-32, Krishnanagar, from Gaurav Tyagi's house via Moolchand's house to Rajkumar's house. 7.74 20/01/2025 7.74 21 Mar 2025  Zuber Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
477 1030 Work of construction of interlocking tiles and drain from Om Dairy to Rakesh Tyagi's house in Ward-32 Banwari Gali No.-03. 6.97 20/01/2025 6.97 21 Mar 2025  Zuber Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
478 1031 Work of RCC boundary wall for parking in front of Community Centre in Ward-92 Kaila Islamnagar. 9.99 20/01/2025 9.99 21 Mar 2025  A.H. Const NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
479 1032 Repair work of damaged drain and C.C.C. from street no. 4 temple of Ward-60 Shyampur Main to house of Sachin Choudhary. 3.25 20/01/2025 3.25 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
480 1033 Work of drain and interlocking tiles from Kalu's house to Gajju's house/Balaji temple in street no. 02 in ward-16 Gadhi. 5.76 20/01/2025 5.76 21 Mar 2025  Dua Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
481 1034 Work of drain and interlocking tiles in Ward-30 Keshav Kunj Gali No. 18. 7.48 20/01/2025 7.48 21 Mar 2025  A.K.G. Const. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
482 1035 Work of drain and interlocking tiles from Power House to Shivalaya Properties in Ward-30 Sadarpur. 8.41 20/01/2025 8.41 21 Mar 2025   Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
483 1036 Work of drain and interlocking tiles from the house of Shri Satveer to the house of Shri Ajit via the house of Shri Saroj in Ward - 24 Mehrauli. 9.88 20/01/2025 9.88 21 Mar 2025  Rahul Builders Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
484 1037 Ward-70 Janakpuri, Vrindavan Garden Main Road, Construction and Beautification work of Shaheed Sthal 1 and construction of new drain for water drainage. 9.87 20/01/2025 9.87 21 Mar 2025   Vinod KumarJunior Engineer MEMBER KOTA 2024-25(II) 
0%
485 1038 Construction work of Shaheed Sthal-2 and RCC slab at the corner of Ward-70 Vrindavan Garden Shivaji Park Gurudwara. 9.94 20/01/2025 9.94 21 Mar 2025   Vinod KumarJunior Engineer MEMBER KOTA 2024-25(II) 
0%
486 1039 Construction work of RCC drain and CC road from Rajkumar to Subhash Choudhary, Furkan wali gali, Hetu to Teju, Kiranpal to Kamalpal's house in ward-48 Mirzapur. 9.50 20/01/2025 9.50 21 Mar 2025  J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
Fund Name: NIGAM NIDHI 2024-25
487 1040 Work of drain and interlocking tiles from Saroj's house to Dr. Sharjar's house in Ward-42 Bamheta. 8.40 20/01/2025 8.40 21 Mar 2025  Khoshla Asso. Rajender SinghJunior Engineer MEMBER KOTA 2024-25(II) 
0%
488 1041204Construction of a centre for the health department near Vijay Park in Ward-37, Shalimar Garden. 5.18 06/11/2024 5.18 10 Feb 202515 Apr 2025 15 Apr 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: 15th Finance Commission(AQI/NCAP)
489 1042205Work of constructing a centre for the health department on the Movie Palace road in Ward-82 Jawahar Park. 5.18 06/11/2024 5.18 10 Feb 202515 Apr 2025 15 Apr 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: Awasthapna
490 11561Road construction work from Raj Medical Store to T.C. Institute on Nandgram Ashram Road. 290.00 22/04/2024 290.00 12 May 202401 Jul 2024 01 Jul 2024 Shantanu Kans. Preeti BansalJunior Engineer 15th Finance Commission(AQI/NCAP)Completed
100%
491 1158otherConstruction work of gate at Tigri roundabout under Vijay Nagar zone. 228.81 10/10/2024 228.81 30 Oct 202419 Dec 2024 19 Dec 2024 Arun Cons SHIV KUMAR SAROJJunior Engineer AwasthapnaIn Progress
0.00%
492 1159otherConstruction work of commercial complex at Rajnagar Ex. Ghaziabad. 475.68 03/03/2025 475.68 18 Mar 202512 May 2025 21 Dec 2024 Sunil Garg & Co. Preeti BansalJunior Engineer AwasthapnaIn Progress
0.00%
493 1160otherConstruction work of shops on Municipal Corporation land near Markaz Mosque in Ward-95 Kaila Bhatta 225.00 08/10/2024 225.00 23 Oct 202417 Dec 2024 17 Dec 2024 Arun Cons NAGENDRA SHARMAJunior Engineer AwasthapnaIn Progress
0.00%
Fund Name: 15th Finance Commission(SWM)
494 1161otherWork of laying paver blocks at the construction site for establishment of ABC Centre in Ghaziabad district under City Zone Animal Birth Control Project. 24.00 01/08/2024 24.00 16 Aug 202410 Oct 2024 10 Oct 2024 Chandramohan Singh Raghuvanshi NAGENDRA SHARMAJunior Engineer AwasthapnaIn Progress
0.00%
495 116222Construction of RCC drain from Ward-25 and 58 Vijayanagar Bypass to Rathi Road and Balaji Sweet. 206.55 28/11/2024 206.55 13 Dec 202406 Feb 2025 06 Feb 2025  SHIV KUMAR SAROJJunior Engineer 15th Finance Commission(SWM)In Progress
0.00%
496 116321Construction of boundary wall of STP Plant under Vijayanagar Zone. 51.65 27/11/2024 51.65 12 Dec 202406 Feb 2025 06 Feb 2025 Zuber Cons0 SHIV KUMAR SAROJJunior Engineer 15th Finance Commission(SWM)In Progress
0.00%
497 1164100Repair of damaged drain in front of Mohan Mandir in Ward 28 Rajiv Colony and construction of drains through RCC from Agrawal Sweets to Katori Mill Toilet at Mohan Nagar Square. 118.71 30/09/2024 118.71 15 Oct 202409 Dec 2024 05 Feb 2025  Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(SWM)Completed
100%
498 11658Ward 64: Construction work of RCC drain from Air Force boundary through Sikandarpur village crossing Civil Terminal Road crossing Bazirabad Road to the main drain. 612.04 30/09/2024 612.04 15 Oct 202409 Dec 2024 09 Dec 2024  Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(SWM)In Progress
85.00%
499 11665Construction of damaged drain through RCC from ITS College to Bansal Wire in Ward-38 Arthala Anand area. 98.04 25/09/2024 98.04 10 Oct 202404 Dec 2024 09 Dec 2024  Sanjay Gangwar 8178016821 Junior Engineer 15th Finance Commission(SWM)Completed
100%
500 1167otherPrecast RCC boundary wall work from point A to point D on municipal corporation land in village Galand (Waste to Energy Plant) 221.00 16/11/2024 221.00 01 Dec 202425 Jan 2025 04 Dec 2024 Zuber Cons0 Preeti BansalJunior Engineer 15th Finance Commission(SWM)In Progress
0.00%
501 1168otherConstruction of parking on Municipal Corporation land Khasra No. 03 and Khasra No. 13B in Ward-17 Hindon Vihar (door to door garbage collection) 45.37 07/12/2024 45.37 22 Dec 202415 Feb 2025 25 Jan 2025 Krishna Asso. NAGENDRA SHARMAJunior Engineer 15th Finance Commission(SWM)In Progress
0.00%
502 1169otherConstruction of parking on Municipal Corporation land Khasra No. 13A in Ward-17 Hindon Vihar. (Door to door garbage collection) 69.70 07/12/2024 69.70 22 Dec 202415 Feb 2025 15 Feb 2025 Krishna Asso. NAGENDRA SHARMAJunior Engineer 15th Finance Commission(SWM)In Progress
0.00%
503 1170otherConstruction work of retaining wall of a side drain from Ekta culvert to Suryaday Public School under Ward-73. 265.00 21/10/2024 265.00 05 Nov 202430 Dec 2024 15 Feb 2025  Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(SWM)In Progress
0.00%
504 1171453Ward-15 RCC drain construction from DAV Chowk to Medical Tiraha and DAV Chowk to Ambedkar Park (big drain) (L Block). 84.28 22/10/2024 84.28 06 Nov 202431 Dec 2024 30 Dec 2024  SHIV KUMAR SAROJ 8178016826 Junior Engineer 15th Finance Commission(SWM)In Progress
0.00%
Fund Name: 15th Finance Commission(AQI/NCAP)
505 11729Construction of RCC drain from Kanavani culvert to Vasundhara section-01 cut in ward-54. 182.43 30/09/2024 182.43 15 Oct 202409 Dec 2024 31 Dec 2024 RG Buildtech Engg. Ltd. Sanjay GangwarJunior Engineer 15th Finance Commission(SWM)In Progress
0.00%
506 117319Construction of green and gasifier crematorium in Hindon Vihar. 350.00 06/11/2024 350.00 21 Nov 202415 Jan 2025 09 Dec 2024 Shreeji Infraproject Pvt. Ltd. NAGENDRA SHARMAJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
507 117424Road construction work from GDA four lane to pipeline road. 273.62 31/08/2024 273.62 15 Sep 202409 Nov 2024 15 Jan 2025 Green Revolution Foundation Rajender SinghJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
508 117511Road and drain construction work from Renault showroom to the primary school via railway crossing in Ward 46, Mainapur Industrial Area. 220.15 01/10/2024 220.15 16 Oct 202410 Dec 2024 09 Nov 2024 Devkali Infra Pvt. Ltd. Rajender SinghJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
509 11764Road and drain construction work from Khasra No. 686 to Panchal Dharma Kate in Ward 46, Duhai Industrial Area. 124.84 23/09/2024 124.84 08 Oct 202402 Dec 2024 10 Dec 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
510 11776Ward-49, Dense work from Meerut Road to Parshuram Temple on Nandgram Main Road and from Atal Chowk to Mother India School and F-Block. 316.11 25/09/2024 316.11 10 Oct 202404 Dec 2024 02 Dec 2024 Zuber Cons0 NAGENDRA SHARMAJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
511 11787Road construction by Dense on the kutcha road of Sheetla Mata temple in Anand industrial area of ​​ward-38 Arthala. 216.06 30/09/2024 216.06 15 Oct 202409 Dec 2024 04 Dec 2024  Sanjay Gangwar 8178016821 Junior Engineer 15th Finance Commission(AQI/NCAP)Completed
100%
512 117918Dense road work in Ward-88 Arjun Nagar from Ramteeram Road to Jai Hanuman Kirana Store, from Kaushik Provision Store to Manyak Collection and from Gurudwara to H.No. 16 and Tanishq Beauty Parlour in front of the park and from Bikaner Shop in Bagh Bhatiyari via Anmol Market to Reliance Showroom around the park. 57.18 22/10/2024 57.18 06 Nov 202431 Dec 2024 09 Dec 2024 Shreeji Infraproject Pvt. Ltd. NAGENDRA SHARMAJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
Fund Name: 15TH FINANCE COMMISSION
513 1180otherRCC drain and CC road work from Joya Medical Store to Karela Market in Ward-50 Noornagar. 80.36 07/10/2024 80.36 22 Oct 202416 Dec 2024 31 Dec 2024 Prateek Enterprises NAGENDRA SHARMAJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
514 118138Construction work of garbage collection secondary point near Sahibabad depot under Vasundhara Zone. 29.68 07/01/2025 29.68 22 Jan 202518 Mar 2025 18 Mar 2025  Sanjay Gangwar 8178016821 Junior Engineer 15TH FINANCE COMMISSIONCompleted
100%
515 118235Work of garbage collection secondary point (RRTS) near the gate of Sahibabad Mandi under Vasundhara Zone. 29.68 07/01/2025 29.68 22 Jan 202518 Mar 2025 18 Mar 2025  Sanjay Gangwar 8178016821 Junior Engineer 15TH FINANCE COMMISSIONCompleted
100%
516 1185otherConstruction of garbage collection secondary point on the canal track below Vaishali Sector-05 Elevated under Vasundhara Zone. 29.68 16/01/2025 29.68 31 Jan 202527 Mar 2025  Malik Cons0 Sanjay GangwarJunior Engineer 15TH FINANCE COMMISSION 
0%
517 118636Construction of garbage collection secondary point in front of Vasundhara Sector-08 Indirapuram police station. 29.68 07/01/2025 29.68 22 Jan 202518 Mar 2025 27 Mar 2025 RC Contract Sanjay GangwarJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
518 118742Construction of MRF Centre on Bazirbad Road in Karhada in Mohannagar Zone. 29.68 16/01/2025 29.68 31 Jan 202527 Mar 2025 18 Mar 2025  Sanjay Gangwar 8178016821 Junior Engineer 15TH FINANCE COMMISSIONCompleted
100%
519 1188otherConstruction of MRF Centre at Rajiv Kalaneni in Mohannagar Zone. 29.78 20/02/2025 29.78 07 Mar 202501 May 2025 27 Mar 2025  Sanjay Gangwar 8178016821 Junior Engineer 15TH FINANCE COMMISSIONCompleted
100%
520 118943Construction of secondary point near Apsara border toilet under Mohannagar zone ward-34. 29.68 16/01/2025 29.68 31 Jan 202527 Mar 2025 01 May 2025  Sanjay Gangwar 8178016821 Junior Engineer 15TH FINANCE COMMISSIONCompleted
100%
521 11901Construction of garbage collection secondary point near Purvanchal Bhawan in Ward-38 Arthala. 29.68 05/02/2025 29.68 20 Feb 202516 Apr 2025 27 Mar 2025  Sanjay Gangwar 8178016821 Junior Engineer 15TH FINANCE COMMISSIONCompleted
100%
522 119139Construction work of MRF Centre in Ward-53 Sanjaynagar M-Block. 29.68 10/01/2025 29.68 25 Jan 202521 Mar 2025 16 Apr 2025 Star Enterprises Rajender SinghJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
523 119241Construction work of MRF Centre in Ward-67 Sanjaynagar P-Block. 29.68 17/01/2025 29.68 01 Feb 202528 Mar 2025 21 Mar 2025 A.S. Cons Rajender SinghJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
524 1193otherConstruction work of MRF Centre in Ward-62 Harsav. 29.68 16/01/2025 29.68 31 Jan 202527 Mar 2025 28 Mar 2025 Raghuvanshi Buildtech Rajender SinghJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
525 119426Construction work of MRF Centre at Gate No. 01 of Ward-65 Swadeshi Compound. 24.49 20/12/2024 24.49 04 Jan 202528 Feb 2025 27 Mar 2025 Prateek Enterprises Rajender SinghJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
526 119530Construction work of MRF Centre near District Cooperative Bank in Ward-84 Rajnagar. 7.07 06/01/2025 7.07 21 Jan 202517 Mar 2025 28 Feb 2025 Kotak Builders Rajender SinghJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
527 119632Construction work of retaining wall of drain near MRF Centre in Ward-62 Harsav. 21.22 06/01/2025 21.22 21 Jan 202517 Mar 2025 17 Mar 2025 J.S.S. Cons Rajender SinghJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
528 119727Construction work of retaining wall of drain near MRF Centre in Ward-67 Sanjay Nagar P-Block. 26.47 19/12/2024 26.47 03 Jan 202527 Feb 2025 17 Mar 2025 Shantanu Kans0 Rajender SinghJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
529 1200otherConstruction of secondary waste collection center near Ward-69 Hamdard Chowk Lohianagar police post. 29.68 07/01/2025 29.68 22 Jan 202518 Mar 2025  Raghuvanshi Buildtech NAGENDRA SHARMAJunior Engineer 15TH FINANCE COMMISSION 
0%
530 1201otherConstruction work of secondary waste collection center near Hanuman temple behind Uttarachal Bhawan in Ward-11 Nandgram. 29.86 07/01/2025 29.86 22 Jan 202518 Mar 2025 18 Mar 2025 Pramod Kumar Singhal NAGENDRA SHARMAJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
531 1202otherConstruction of garbage house in front of government school at Ward-92 Kaila Bhatta Chamda Paith. 25.64 06/01/2025 25.64 21 Jan 202517 Mar 2025 18 Mar 2025 Universal Ventures NAGENDRA SHARMAJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
532 1203otherConstruction work of secondary waste collection in front of C-block on Ward-49 Nandagram main road. 29.68 06/01/2025 29.68 21 Jan 202517 Mar 2025 17 Mar 2025 A.P. Cons NAGENDRA SHARMAJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
533 1204otherConstruction of garbage dump near Sanatan Dharma School from Express Market, Ward-12. 29.68 26/12/2024 29.68 10 Jan 202506 Mar 2025 18 Mar 2025 Charan Singh Contra NAGENDRA SHARMAJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
Fund Name: 15th Finance Commission(AQI/NCAP)
534 120529Construction work of garbage dump near Durga Bhabhi Chowk, Ward-59. 6.02 26/12/2024 6.02 10 Jan 202506 Mar 2025 06 Mar 2025 A.S. Cons NAGENDRA SHARMAJunior Engineer 15TH FINANCE COMMISSIONIn Progress
0.00%
535 1222otherWard - 69 Lohianagar C-11 Road improvement by density and laying of interlocking tiles on side tracks from Mahindra Showroom to Lohianagar Police Chowki. 158.25 14/03/2025 158.25 29 Mar 202523 May 2025 31 May 2025 Akansha Const. NAGENDRA SHARMAJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
536 1223otherImprovement by density on the roads of Ward-59 Old City Chandrapuri and Bihari Nagar, Manohari Vidya Mandir in front of Mittal Hardware and dirty drain in New Colony. 121.55 14/03/2025 121.55 29 Mar 202523 May 2025 23 May 2025 Arun Cons Co NAGENDRA SHARMAJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
537 1226otherRepair work of damaged road from Bajirabad Road Garimanjali School to Pasuda Primary School in Mohan Nagar Zone. 291.33 15/03/2025 291.33 30 Mar 202524 May 2025   Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(AQI/NCAP)In Progress
50.00%
538 1229otherImprovement work by dense in house no. 3/112, 4/42 to 2/92 4/7 4/1 to 4/56 in ward 86, Rajendra Nagar sector 5. 54.84 14/03/2025 54.84 29 Mar 202523 May 2025   Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(AQI/NCAP)In Progress
90.00%
539 1230otherRepair work of damaged road from Gurjar Chowk to Pandit ji's house in Ward 29 Bhaupura Defence Colony. 67.69 15/03/2025 67.69 30 Mar 202524 May 2025 23 May 2025  Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(AQI/NCAP)In Progress
60.00%
540 1231otherRepair work of damaged road from Shani Mandir to Sahibabad police station and Shani Chowk police post between wards 85 and 75 by Dens. 59.29 13/03/2025 59.29 28 Mar 202522 May 2025 24 May 2025  Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(AQI/NCAP)In Progress
80.00%
541 1234otherWard 45 Karhaida DP Property damaged road repair work by Dens. 49.05 14/03/2025 49.05 29 Mar 202523 May 2025 06 Jun 2025  Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(AQI/NCAP)In Progress
90.00%
542 12388Resurfacing work in Ward 18, Shastri Nagar from Raj Gas Agency via Bagwali Colony to Rajapur flyover. 175.89 13/03/2025 175.89 28 Mar 202522 May 2025 10 Jun 2025 Akash Infra Rajender SinghJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
543 1239otherRoad construction work from Hapur Road to PNB Bank via A-Block CNG Pump in Ward 62, Govindpuram. 326.06 14/03/2025 326.06 29 Mar 202523 May 2025 22 May 2025 Shreejee Infraproject Pvt Ltd Rajender SinghJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
544 1240otherRoad improvement work from NH-09 to Balle Chowk via Vishandu Baba Shiv Temple in Ward 42, Bamheta. 231.74 13/03/2025 231.74 28 Mar 202522 May 2025 23 May 2025 Shreejee Infraproject Pvt Ltd Rajender SinghJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
545 1242otherWork of CC road from Ambedkar School in Ward 53, Raispur via Valmiki Basti to the statue of Chaudhary Charan Singh ji. 255.32 13/03/2025 255.32 28 Mar 202522 May 2025 04 Jun 2025 Shantanu Cons Rajender SinghJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
546 1243otherImprovement work of the main road and connecting roads connected to the main roads of Ward 68 Brijvihar. 396.66 13/03/2025 396.66 28 Mar 202522 May 2025 22 May 2025 Juner Cons Sanjay GangwarJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
547 1244otherRepair work of damaged internal roads of Ward 54 Sec 11 Vasundhara. 192.63 13/03/2025 192.63 28 Mar 202522 May 2025 22 May 2025 Shreejee Infraproject Pvt Ltd Sanjay GangwarJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
Fund Name: 15th Finance Commission(SWM)
548 1245otherWard 76, Vaishali, Sector 1, Madan Mohan Malviya Marg, repair work of damaged road from Police Chowki to Fire Brigade T Point through C.C. 90.39 14/03/2025 90.39 29 Mar 202523 May 2025 22 May 2025 A. K. Cons Sanjay GangwarJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
549 1247otherConstruction of drain between Sanjaynagar P-Block Cut and Bharat Petrol Pump. 128.93 13/03/2025 128.93 28 Mar 202522 May 2025 31 May 2025 Sunil Garg & Co. Rajender SinghJunior Engineer 15th Finance Commission(SWM)In Progress
0.00%
Fund Name: 15th Finance Commission(AQI/NCAP)
550 1248otherReconstruction of damaged drain from Kalkagarhi to Holy Child School by RCC. 302.52 13/03/2025 302.52 28 Mar 202522 May 2025 22 May 2025 A.H. Cons NAGENDRA SHARMAJunior Engineer 15th Finance Commission(SWM)In Progress
0.00%
551 1250otherResurfacing work in Ward 47, Shastri Nagar from Shastri Nagar Chowk via Carte Chowk to Hapur Road. (Main Road) 250.85 14/03/2025 250.85 29 Mar 202523 May 2025 06 Jun 2025 A.K. Cons Rajender SinghJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
552 1252otherRoad improvement work by RCC drain and DAS in lane no. 10, D-block, ward-62, Govindpuram. 42.82 14/03/2025 42.82 29 Mar 202523 May 2025 31 May 2025 Shantanu Cons Rajender SinghJunior Engineer 15th Finance Commission(AQI/NCAP)In Progress
0.00%
553 1253otherRepair work of damaged road from Pappu Colony to Tahirpur Marg in Ward 10 DLF by Dense. 61.29 14/03/2025 61.29 29 Mar 202523 May 2025 23 May 2025  Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(AQI/NCAP)In Progress
90.00%
Fund Name: Smart City
554 1254otherRepair work by resurfacing of damaged road on Maurya Road between wards 86, 83, 80. 145.40 14/03/2025 145.40 29 Mar 202523 May 2025 23 May 2025  Vinod Kumar 8650930015 Junior Engineer 15th Finance Commission(AQI/NCAP)In Progress
90.00%
555 12728Establishment of a modern carcass plant. 575.00 19/11/2024 575.00 04 Dec 202428 Jan 2025 28 Jan 202527 Sep 2025 NAGENDRA SHARMA 8882460223 Junior Engineer Smart CityIn Progress
55.00%
View View
Fund Name: CM GRID
556 127810Installation of 350 new cameras under City Surveillance Project 245.00 20/10/2024 243.92 27 Feb 202527 Jun 2025 27 Jun 202526 Sep 2025 All JE 0000000000 Junior Engineer Smart CityIn Progress
0.00%
View View
557 128602gDevelopment of Roads from Mohan Nagar Bus stand to Airforce Station via Mohan Nagar Chouraha 2332.00 16/03/2024 1688.00 07 Aug 202408 Oct 2024 08 Oct 2024 R& C Infra Engineers Pvt Ltd 8586051107Vinod Kumar 8650930015 Junior Engineer CM GRIDIn Progress
72.00%
View View
Fund Name: CM-VNY
558 128702gDevelopment of Road works from Seshnag Gate to Elevated Road 1227.00 13/03/2024 1228.00 07 Aug 202408 Oct 2024 08 Oct 202407 Jan 2026R& C Infra Engineers Pvt Ltd 8586051107Vinod Kumar 8650930015 Junior Engineer CM GRIDIn Progress
50.00%
View View
Fund Name: MEMBER KOTA
559 12881308/GM(N-9)/E-Tender/2025Construction of a Working Women's Hostel. 2440.00 28/02/2025 2440.00 21 Mar 202503 Jun 2025 27 Jun 2025 M/s. Mittal Associates Jitendra JauhariJunior Engineer CM-VNY 
0%
Fund Name: NIGAM NIDHI 2024-25
560 129457Work of interlocking tiles on side track from K-70 to K-43 in K-Block, Ward-96, Nehrunagar-Third. 4.24 05/09/2024 4.24 09 Sep 202414 Oct 2024 09 Oct 2024 R.R Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
561 129539Work of supply and spreading of sand in Ward-91, Kavi Nagar Ramlila Ground. 4.41 02/09/2024 4.41 19 Sep 202409 Oct 2024 01 Oct 2024 R.D. Enter. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: BOARD FUND
562 1296153Repair of damaged road from Khemchand to Ramgopal, Sharda's house to Dr. Rakesh, Kiranpal to Shripal in ward-58, Mawai through C.C. 9.20 03/09/2024 9.20 26 Dec 202430 Jan 2025 30 Jan 2025 Ariti Const.Co. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
563 1434141/Nazarat 2024-25नगर निगम मुख्यालय में नयी लिफ्ट लगाये जाने के साथ-साथ 02 वर्ष का रख-रखाव का कार्य। 26.11 17/08/2024 23.60 20 Aug 202425 Sep 2024 25 Sep 202418 Feb 2025OTHER SUNIL KUMAR MAURYA 8707646842 Junior Engineer BOARD FUNDCompleted
100%
Fund Name: NIGAM NIDHI 2024-25
564 1490175/I/Nazarat/2024-25नगर निगम मुख्यालय में लिफ्ट नं-3 को नई लगाये जाने के साथ-साथ 02 वर्ष का रख-रखाव का कार्य। 26.11 21/09/2024 23.90 15 Oct 202415 Oct 2024 15 Oct 202415 Jan 2025SUNIL GARG & CO. 9310488879SUNIL KUMAR MAURYA 8707646842 Junior Engineer BOARD FUNDCompleted
100%
Fund Name: MEMBER KOTA 2024-25(II)
565 6864Construction work of drain on both sides and street through C.C. in Dileen Tripathi street in front of Shiv temple, Ward-70, Janakpuri C-Block. 9.82 26/07/2024 9.82 05 Sep 2024 07 Oct 2024  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25In Progress
10.00%
566 803 Construction work of RCC drain and CC road in the streets of Manoj, Yogesh Ghumsingh Jagmal in Ward 21 Bhowapur village. 7.39 05/03/2025 7.39 21 Mar 2025  H.R. Builders POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
567 804 Road and drain construction work through interlocking tiles on the damaged road from Suresh's house to Thakur Deshraj's house and from Vinod's house to Ankit's shop in Ward 58, Sector 09 Shivpuri. 7.45 30/01/2025 7.45 21 Mar 2025  A.H. Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
568 806 Construction work of CC road and RCC drain from Divya Kirana Store to house no. H/703 and from Tarachand's house to Satendra Singh's house in Ward-03, H Block. 7.72 30/01/2025 7.72 21 Mar 2025  A.H. Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
569 807 Construction work of drain and interlocking tiles in the damaged street from Vijay Kumar's house to Durvijay's house in Ward No. 05, Gagan Vihar. 7.74 30/01/2025 7.74 21 Mar 2025  Ujjwal Cons. 9625363623Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)In Progress
70.00%
570 808 Construction work of C.C. road and drain in Old Mosque Street and from Surendra's house to Wasim's house in Ward-50, Noor Nagar. 7.83 30/01/2025 7.83 21 Mar 2025  Sachin Builders NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
Fund Name: NIGAM NIDHI 2024-25
571 8095Construction work of CC road from house no. A 98 to house no. A 88 in A-block in Ward-97 Ramprastha. 7.98 05/03/2025 7.98 21 Mar 202526 May 2025 26 May 2025 Gourangi Const. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
Fund Name: MEMBER KOTA 2024-25(II)
572 6965Work of drain and street through CCC and culvert through RCC from the corner of Maharana Pratap Park to H.No. 88-1-1 to building no. 50 in Ward-70, Rajbagh. 9.97 26/07/2024 9.97 05 Sep 202412 Nov 2024 07 Oct 2024 Prateek Enter. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
573 810 Construction work of drain and C.C. road in the damaged lane from Fayaz's house to Imran's house in ward 90 Shahidnagar III. 8.13 30/01/2025 8.13 21 Mar 2025   Sanjay Gangwar 8178016821 Junior Engineer MEMBER KOTA 2024-25(II)In Progress
50.00%
574 811 Construction work of CC road and RCC drain from Puran Vijayeta's house to Rahul's house in Ward-04, Thana Road D Block. 8.18 30/01/2025 8.18 21 Mar 2025  J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
575 812 Construction work of RCC drain and CC road from Jaiprakash to Roopchand, Vinita to Shripal's house in Ward 07 Shiv Vihar. 8.19 30/01/2025 8.19 21 Mar 2025  Manveer Singh Cont. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
576 8132Road improvement work by interlocking tiles from near Tikona Park to 448G and from H.No. 311/2 to Public Service Centre in Ward 57, Nyay Khand 2. 8.21 05/03/2025 8.21 21 Mar 202524 May 2025 24 May 2025 S.G. Enter. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
577 814 Construction work of RCC drain and CC road from Manoj to Dharampal's house in Ward 07 Shiv Vihar. 8.22 30/01/2025 8.22 21 Mar 2025  Manveer Singh Cont. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
578 815 Work of construction of drain from the cut of Hydel Colony to KA-39 in Ward 91, Kavi Nagar. 8.24 30/01/2025 8.24 21 Mar 2025  V.S. Buildcon.Co. POOJA SINGHJunior Engineer MEMBER KOTA 2024-25(II) 
0%
Fund Name: NIGAM NIDHI 2024-25
579 816 Ward-08, Maliwada Thakur wali gali, from Jayaprakash to Satendra's house, work of drain and interlocking tiles and drain construction work in Pappu wali gali, Chandrashekhar wali gali, lane opposite Chandrashekhar, Nice Look wali gali, Sundar wali gali, Baba Chaat wali gali, lane no.02, temple wali gali, Dheemar wali gali, well wali gali and other lanes. 8.24 30/01/2025 8.24 21 Mar 2025  J.P. Shakti Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
Fund Name: MEMBER KOTA
580 7060Construction work of drain and C.C. street and R.C.C. culvert on both sides from Manish Sharma's house to Ramraj Orphanage in Ward-70, Janakpuri, Ramnagar. 9.93 24/07/2024 9.93 05 Sep 2024 07 Oct 2024 Prateek Enter. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
581 522117Repair work of damaged road from Jain temple to the road between Sec 10 and 12 in ward 61 Sec 10 by Danes. 10.95 10/09/2024 10.95 07 Oct 202416 Dec 2024 16 Dec 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
582 523104Work of interlocking tiles from C-71 to C-49 via C-59 and from C-95 to C-85 in Ward 62, RK Puram. 27.22 10/09/2024 27.22 19 Sep 202415 Oct 2024 14 Oct 2024 SG Enterprises Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
583 524101Work of construction of RCC drain from C-257 to C-246 in Ward 62, Govindpuram C-Block, Lane No. 07. 16.77 10/09/2024 16.77 19 Sep 202412 Dec 2024 14 Oct 2024 J.R. Builtack Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
584 525140Work of drain and CC road in ward 62, Madiya village from Vijendra Singh's house via Amit Rathi's house to Sunil's house. 12.18 10/09/2024 12.18 19 Sep 202412 Dec 2024 15 Oct 2024 Ek Danth Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
585 526139Construction work by interlocking tiles in the drain and damaged street from the house of Haji Jabruddin to the house of Haji Mohd. Shahjad and from the house of Choudhary Ibrahim to the house of Salman, under ward 63. 20.06 12/09/2024 20.06 19 Sep 202415 Oct 2024 14 Oct 2024 Mohit Choudhary Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
586 527140Construction work by interlocking tiles in the drain and damaged street from the house of Isaad to the houses of Farooq, Mansoor and Banno under ward 63. 12.34 10/09/2024 12.34 19 Sep 202412 Dec 2024 14 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
Fund Name: NIGAM NIDHI 2024-25
587 528137Construction work of drain and CC road in the damaged street up to the house of Nanak Chand Moharram under ward 63/66. 17.60 12/09/2024 17.60 19 Sep 2024 14 Oct 2024 Anuj kumar Contr. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
50.00%
Fund Name: MEMBER KOTA
588 71189Work of drain and interlocking tiles in the unpaved lane from Sarfaraz's house to Aslam's house in lane no. 12 of Rajiv Colony in Ward-20, Bhaupura. 4.77 15/12/2023 4.77 05 Sep 202410 Feb 2025 10 Feb 2025  Vinod Kumar 8650930015 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
589 529174Construction work of drain and damaged street with interlocking tiles from Yasin's house to Salimuddin's house in Ward 64 Garima Garden. 14.67 12/09/2024 14.67 19 Sep 2024 15 Oct 2024 Mohit Choudhary Vinod KumarJunior Engineer MEMBER KOTAIn Progress
50.00%
590 530136Construction work of drain and damaged street with interlocking tiles from Dr. Rhees's house to Sarif's house in Ward 64 Garima Garden. 17.27 12/09/2024 17.27 19 Sep 202415 Feb 2025 14 Oct 2024 Anuj kumar Contr. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
591 531107Road improvement work by DANS from KH-124 to KH-107 and KH-92 to KH-70 in Ward 65, Kavi Nagar H-Block. 21.13 10/09/2024 21.13 19 Sep 2024 14 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
592 532111Road improvement work by DANS in Ward 65, Kavi Nagar H-Block from KH-145 to KH-135, KH-263 to KH-247, KH-183 to KH-171, KH-220 to KH-198, KH-170 to KH-156. 26.38 10/09/2024 26.38 19 Sep 2024 14 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
593 533141Road improvement work by DANS from KH-41 to Railway Ring Road in Ward 65, Kavi Nagar H-Block. 14.24 10/09/2024 14.24 19 Sep 2024 15 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
594 534175Improvement work of damaged street from Chaudhary Medical Store to Chaudhary Mustakim's house under Ward No. 66 by providing drain and interlocking. 13.27 12/09/2024 13.27 19 Sep 202412 Nov 2024 15 Oct 2024 Mohit Choudhary Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
Fund Name: NIGAM NIDHI 2024-25
595 535164Improvement work of the damaged lane from Rahisu's house to Niaz Bhai's house and from Feuji's house to Dr. Nura and from Rajkumar's house to Nasir's house under ward 66 by providing drain and interlocking tiles. 20.40 12/09/2024 20.40 19 Sep 202412 Dec 2024 15 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
Fund Name: MEMBER KOTA
596 7270Repair work through drain and C.C. in the damaged street from the temple to Ramveer's house in Jal Nigam Colony, Ward-60, Shyampur Main. 8.42 26/07/2024 8.42 05 Sep 202428 Nov 2024 07 Oct 2024 Akruti Const. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
597 536138Improvement work of damaged street from Deen Maulana's house to Zahid's house under ward 66 by providing drain and interlocking tiles. 16.47 12/09/2024 16.47 19 Sep 2024 14 Oct 2024 Anuj kumar Contr. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
598 537119Construction work of RCC drain from J-373 to J-421 and J-514 to J-600 in Ward 67, Sanjay Nagar J-Block. 14.96 10/09/2024 14.96 19 Sep 202415 Oct 2024 15 Oct 2024 Keshram Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
599 538107Improvement work by interlocking tiles in the damaged lanes from single story C-113 to C-130 and C-81 to C-85 in Ward-68 Brajvihar. 11.19 10/09/2024 11.19 19 Sep 202430 Dec 2024 15 Oct 2024 V.K. Contr. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
600 539172Ward-69, Lohianagar A-block from A-68 to railway line and B-block from B-72 to B-168 in service lane. Work of drain and C.C. and road improvement work by Dans from B-73 to B-86, B-112 to B-105 via B-101. 17.13 10/09/2024 17.13 07 Oct 2024 05 Mar 2025 DKS Infratach India Pvt.Ltd. Preeti BansalJunior Engineer MEMBER KOTAIn Progress
0.00%
601 540132Work of drain and C.C. in service lane from C-78 to C-154 in Ward-69, Lohianagar C-Block and work of drain and interlocking tiles from Golden Bakery to Saini Compound and in front of Deepak Tyagi in C-Block. 16.36 10/09/2024 16.36 19 Sep 202407 Jan 2025 14 Oct 2024 Modern Const.Co. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
602 54106-12-2024Work of drain and C.C. road in Ward-69, Lohianagar Lal Quarter from H.No.-53/1 to 53/8 and H.No.-3/1 to 1/1 and H.No.-2/8 to 6/1 and H.No.-8/1 to 8/8. 11.36 10/09/2024 11.36 07 Oct 202423 Mar 1900 09 Dec 2024 A.V. Enter. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
Fund Name: NIGAM NIDHI 2024-25
603 542159Construction work of drain and C.C. street in ward 70 Janakpuri C. Block from building number C.146 Mangal Sain ji's house to Rajendra Baisaya's house and from B.44 to Gorakh Nath temple. 29.76 12/09/2024 29.76 19 Sep 2024 15 Oct 2024 Prateek Enter. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
80.00%
Fund Name: MEMBER KOTA
604 7368Work of interlocking tiles in the damaged street from Sanjay's house to Narendra's house in Durga Colony, Ward-60, Shyampur Main. 6.29 26/07/2024 6.29 05 Sep 2024 07 Oct 2024 JSS Const. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
605 543160Ward 70, Janakpuri A Block, lane no. 4, from A-94 to Raj Bahadur's house to Jagriti Public School and from Councilor's office Manjeet Rana's house to Vishwakarma's house, construction work of drain and C.C. lane. 29.76 12/09/2024 29.76 19 Sep 2024 15 Oct 2024 Prateek Enter. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
606 544115Road improvement work by Danes in Ward 71, Sanjay Nagar E-Block from E-106 to E-116, E-131 to E-116, E-132 to E-150, E-190 to E-95. 14.27 10/09/2024 14.27 19 Sep 2024 15 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
607 545117Road improvement work by DANS from E-569 to Forest Department office in Ward 71, Sanjay Nagar. 12.12 10/09/2024 12.12 19 Sep 2024 15 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
608 546127Repair of damaged road from house no. B-57 to house no. B-49 in Radha Krishna Society, Ward-72, Kaushambi through Dense and work of interlocking tiles on side patri. 14.68 10/09/2024 14.68 21 Oct 202416 Dec 2024 16 Dec 2024 Arun Const.Co. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
609 547118Repair of damaged road from house no. A-01 to house no. A-24 in Park Street and from the corner of the park to the gate by Dense and work of interlocking tiles on side patri in Ward-72 Kaushambi. 12.00 10/09/2024 12.00 21 Oct 2024 16 Dec 2024 Arun Const.Co. POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
10.00%
610 548125Repair of damaged road from house no. B-77 to house no. C-05 in ward-72 Kaushambi by Dense and work of interlocking tiles on side patri. 13.22 10/09/2024 13.22 07 Oct 2024 16 Dec 2024 R.G. Builtach Engg. Ltd. POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
0.00%
Fund Name: NIGAM NIDHI 2024-25
611 549143Ward-72 Vaishali Sector-01: Repair work of damaged road from Thursday to transformer by Dense. 13.74 10/09/2024 13.74 07 Oct 2024 20 Feb 2025 Prateek Enter. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
Fund Name: MEMBER KOTA
612 7462Repair work through drain and C.C. in the damaged street from Sanjay Sharma's house to Israr's house in Rajiv Colony, Shyampur Main, Ward-60. 5.06 26/07/2024 5.06 05 Sep 2024 07 Oct 2024 Akruti Const. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
613 550155Construction work of drain and damaged street through C.C. from S.K. Sharma's house to C-43 in Ward 73, Shalimar Garden Ex-1. 26.53 12/09/2024 26.53 19 Sep 202412 Nov 2024 15 Oct 2024 Univershal Vanchar Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
614 551145Construction work of drain and damaged street through CC from Nathulal's house to SK Sharma in Ward 73, Shalimar Garden Ex-1. 23.47 12/09/2024 23.47 19 Sep 202412 Nov 2024 15 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
615 552132In Ward-74 Sec-15 Vasundhara, repair work of damaged wall from house no. 15/1100 to house no. 15/1146 and construction work of interlocking tiles from house no. 15/1131 to house no. 15/1127. 10.94 10/09/2024 10.94 07 Oct 202430 Dec 2024 30 Dec 2024 V.S. Buildcon.Co. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
616 55384Repair work of damaged road from house no. C-18 to C-31 in ward-74 by Dense. 13.67 10/09/2024 13.67 19 Sep 202422 Nov 2024 15 Oct 2024 Prateek Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
617 55465Construction work of damaged interlocking tiles in Ward-74 to 13, from house no. 13/394 to house no. 403 and house no. 389 to 388 and house no. 13/335 to 13/356 and house no. 13/332. 10.81 10/09/2024 10.81 19 Sep 202406 Nov 2024 14 Oct 2024 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
618 55585Repair of damaged road from 6/210 to 6/225 in Ward-74 Sec-06 Vaishali by Dense and work of interlocking tiles on site plate. 14.55 10/09/2024 14.55 19 Sep 202422 Nov 2024 15 Oct 2024 Prateek Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
Fund Name: NIGAM NIDHI 2024-25
619 556157Construction work of damaged street through C.C. from D-173 to D 132, D 200 to D 137, D 196 to D 180, D 330 to 84, D 115 to D 21, D 113 to D 24 and D 176 to D 57, near power house in D Block, Ward 75, Lajpat Nagar. 20.18 12/09/2024 20.18 19 Sep 202418 Jan 2025 15 Oct 2024 S.R.S. Buildcon Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
620 7561Construction work of drain and CC road in the street from Arif's house to Premvati's house in Ward-34, Shaheednagar First. 4.46 26/07/2024 4.46 05 Sep 202420 Jan 2025 07 Oct 2024 H.R. Builders Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
621 31142Ward-25, Repair and painting work of Ramlila Ground. 4.32 18/09/2024 4.32 19 Sep 202408 Oct 2024 01 Oct 2024 Keshram Const. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
622 31235Repair and painting work of Ramlila Ground near Tanki Complex in Ward-55, C-Block. 2.10 18/09/2024 2.10 19 Sep 202403 Oct 2024 01 Oct 2024 Jai Shanidev Const Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
623 31336Repair and painting work of Ramlila Ground in Ward-51, Pratap Vihar E-Block. 1.38 18/09/2024 1.38 19 Sep 202403 Oct 2024 01 Oct 2024 Jai Shanidev Const Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
624 31437Repair and painting work of Ramlila Ground near Tanki Complex, Ward-51. 2.45 18/09/2024 2.45 19 Sep 202403 Oct 2024 01 Oct 2024 Jai Shanidev Const Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
625 31551Repair and painting work of Ward-71 Sanjay Nagar Ramlila Ground. 5.74 11/09/2024 5.74 19 Sep 202409 Oct 2024 08 Oct 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
626 31638Repair and painting work of Ramlila Ground and Arya Samaj Temple park in Ward-84 Rajnagar Sector-10. 6.82 11/09/2024 6.82 19 Sep 202405 Oct 2024 01 Oct 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
627 31733Work of repair and painting etc. of Chhath Ghat located at various places under Vasundhara Zone. 9.52 17/09/2024 9.52 19 Sep 202411 Nov 2024 05 Oct 2024 A H Const Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
628 31843Under Vijayanagar Zone, Ward-07, Sudamapuri C-Block Balaji Temple, A/600 Tikona Park, in front of Sarvodaya Inter College (Mata Ahilyabai Holkar Park), Ward-15, K Block Temple Park, L-Block Ram Janaki Park, Ward-27 Shanti Nagar Near Water Tank, Ward-35, Shiv Temple and Radha Krishna Temple Complex and Ward-58 A-Block A-491 Park, repair and painting work of Chhath Ghats built earlier. 2.34 18/09/2024 2.34 19 Sep 202408 Oct 2024 01 Oct 2024 Manveer Singh Cont. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
629 7663Construction work of drain and CC road in the street from Haji Akbar's house to Budhba's house in Ward-34, Shaheednagar I. 4.92 26/07/2024 4.92 05 Sep 202412 Nov 2024 07 Oct 2024 H.R. Builders Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
630 7767Work of drain and interlocking tiles in the kutcha lane from Amrish's house to Nanak's house in lane no. 10 of Rajiv Colony, Bhaupura, ward-20. 5.64 15/12/2023 5.64 05 Sep 202412 Nov 2024 07 Oct 2024 Mohit Choudhary Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
631 78141Ward - 10, Pappu Kalani, Street No. 06, from Yashpal Pehalwan's house to Mahendra Singh Parcha's house, drain and C.C. work. 9.67 25/06/2024 9.67 05 Sep 202414 Oct 2024 14 Oct 2024 A.S. Const. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
632 79158Ward - 10, Pappu Kalani, Street No. 06, from Jagpal's house to Yashpal's house, drain and CC work. 9.85 28/06/2024 9.85 05 Sep 202415 Oct 2024 15 Oct 2024 A.S. Const. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
633 80163Ward - 10, Pappu Kalani, Street No. 06, from Subodh Das's house to Jagpal's house, drain and CC work. 9.32 01/07/2024 9.32 05 Sep 202415 Oct 2024 15 Oct 2024 A.S. Const. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
634 8166Work of boundary wall of vacant land of Municipal Corporation near Chikamberpur GT Road Shahidnagar Metro Station and Shani Temple, Ward-34, Shahidnagar First. 14.90 02/08/2024 14.90 05 Sep 202415 Oct 2024 07 Oct 2024 Mohit Choudhary Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
635 8270Patch repair work in Ward-22, Industrial Area Amrit Steel Compound. 9.75 25/07/2024 9.75 05 Sep 202415 Oct 2024 10 Oct 2024 Prateek Enter. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
636 8344Work of drain and interlocking tiles from Nutan's house via Horam's house to Diamond Steel shop in Ward-02, Siddharth Vihar. 17.35 13/06/2024 17.35 05 Sep 202428 Nov 2024 01 Oct 2024 Satnam Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
637 8438Ward-55, in front of Kuti Ashram, from Radha Sweets to the corner of the park (H.No. 288) and from B-338 to Satnam Halwai, repair work of interlocking tiles. 10.00 05/09/2024 10.00 05 Sep 202408 Oct 2024 01 Oct 2024 Pragati Enterprises SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
638 8539Construction work of interlocking tiles from Balaji Stationery to Garhwali Park and on the tank side (side track) in front of Kuti Ashram in Ward-55, D-Block. 6.73 05/09/2024 6.73 05 Sep 202407 Oct 2024 01 Oct 2024 Pragati Enterprises SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
639 8641Drain construction work in H.No. 205 to 260, H.No. 450 to 435, H.No. 451 to 466 and H.No. 546 to 335 in Ward-55, D-Block. 9.22 05/09/2024 9.22 05 Sep 2024 01 Oct 2024 Keshram Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
640 8740Drain construction work in H.No. 188 to 196, H.No. 200 to 197, H.No. 522 to 511 and H.No. 499 to 377 in Ward-55, D-Block. 9.38 05/09/2024 9.38 05 Sep 202408 Oct 2024 01 Oct 2024 Keshram Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
641 88125Road improvement work through drain and CC from Surjeet's house to Sundar's house in Ward-03, Vijaynagar Sector-09. 7.85 26/07/2024 7.85 05 Sep 202427 Jan 2025 24 Dec 2024 Jaiveer Singh Contr. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
642 89123Road improvement work through drain and C.C. from K-1306 to main road (Sanatani Gali No. 02) in Ward-03, Vijayanagar Sector-09. 9.51 26/07/2024 9.51 05 Sep 2024 24 Dec 2024 Jaiveer Singh Contr. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25In Progress
40.00%
643 90133Construction work of CC road and drain from Bunty's shop to Bhavani Auto Mobile via Sharma's house in lane no. 3 in Ward-25, Ambedkar Nagar. 8.19 26/07/2024 8.19 26 Nov 2024 24 Dec 2024 Pardhan Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
644 9177Road improvement work by providing drain and interlocking tiles on the damaged road from Pratap's house to Darogaji's house in Ward-27, San Vihar. 9.54 13/06/2024 9.54 05 Sep 202426 Nov 2024 14 Oct 2024 Chandra Mohan Singh Raguwanshi SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
645 9276Work of tiles and drain construction in Ward-27, San Vihar Street No.-08. 9.84 24/07/2024 9.84 05 Sep 202410 Dec 2024 14 Oct 2024 Pragati Enterprises SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
646 9345Road improvement work by laying interlocking tiles on the damaged road from Sadi Mahal to Mahesh's house in Ward-02, Rahul Vihar under Ward-53, Vijay Nagar Zone. 14.43 31/10/2024 14.43 05 Sep 202414 Oct 2024 01 Oct 2024 Satnam Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
647 9469Work of drain and interlocking tiles in the damaged street from Banwari's house to Goyal Book's house in street no. 04 in Ward-60, Shyampur Main. 5.13 26/07/2024 5.13 05 Sep 2024 07 Oct 2024  Sanjay Gangwar 8178016821 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
648 9549Work of interlocking tiles in Ward-53, Raispur Ambedkar School. 9.01 24/07/2024 9.01 05 Sep 202414 Oct 2024 04 Oct 2024 AKG Const. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
649 9746Work of interlocking tiles on the road leading to garbage factory behind C&D Waste Plant, Ward - 17. 18.59 04/09/2024 18.59 05 Sep 202414 Oct 2024 05 Oct 2024 Pramood Kumar Singhal Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
650 9845Work of interlocking tiles from Ward - 17, Garbage Factory to C&D Waste Plant behind street. 18.76 04/09/2024 18.76 05 Sep 202417 Jan 2025 05 Oct 2024 Satnam Const. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
651 9942Work of construction of culvert in front of Milan Sweets in Ward-67, Sanjay Nagar. 4.92 26/07/2024 4.92 05 Sep 202402 Dec 2024 04 Oct 2024 Keshram Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
652 10043Road improvement work by Danes from P-175 to P-183 and P-163 to P-135 in Ward-67, Sanjaynagar P-Block. 9.91 24/07/2024 9.91 05 Sep 2024 04 Oct 2024 R.G. Builtach Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: MEMBER KOTA
653 10168Construction work of pink toilet under the park at the Municipal Corporation Headquarters. 18.10 10/09/2024 18.10 05 Sep 2024 09 Oct 2024 Chandra Mohan Singh Raguwanshi NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
654 10299Ward-01, Bhim Nagar Street No. 08, from Dev Karan to Sanjeev, Omvir to Rajpal, damaged road, repair of drains and C.C. road improvement work. 6.52 03/09/2024 6.52 07 Oct 202413 Dec 2024 10 Dec 2024 Pradhan Contr. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
655 10397Repair of drain and improvement of damaged road from Murari Lal to Dev Karan in Ward-01, Bhim Nagar Street No. 08 by C.C. road. 8.57 04/09/2024 8.57 07 Oct 202413 Dec 2024 10 Dec 2024 Pradhan Contr. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
656 10457Road improvement work by interlocking tiles from Jaipal to Jaiveer Pal in Ward-01, Bhimnagar Bali No.-08. 5.44 04/09/2024 5.44 09 Sep 2024 10 Oct 2024 J P Sakti SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
657 10558Road improvement work by interlocking tiles from Ompal to Khub Singh in Ward-01, Bhimnagar Gali No.-08. 3.50 04/09/2024 3.50 09 Sep 2024 10 Oct 2024 J P Sakti SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
658 106128Repair work of drain and improvement of damaged road through C.C. road from Manoj to Devendra Bhagat in Ward-01, Christian Nagar Bagu E Block, Street No.01. 5.88 04/09/2024 5.88 16 Dec 202403 Jan 2025 24 Dec 2024 Nirban Infra SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
659 10769Repair of drains and C.C. road repair work on damaged road from Satnam and Chaudhary Chatar Singh, Ravindra Chauhan to Tarun Kumar in Ward-01, Krishna Nagar Bagu. 6.56 04/09/2024 6.56 09 Sep 2024 10 Oct 2024 Nirban Infra SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
660 10856Construction work of RCC drain from Rana Dairy to K/11 on Ward-03, Thana Road. 6.32 03/09/2024 6.32 09 Sep 2024 10 Oct 2024 J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
661 10955Construction of drain from Rakesh's house to Laxmi Dairy via Chhajju Singh in Ward-03, Purana Vijayanagar 6.86 03/09/2024 6.86 09 Sep 2024 10 Oct 2024 J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
662 110110Work of drain construction till Pradeep’s house Jatin Footwear in Ward-03, Purana Vijayanagar. 6.45 03/09/2024 6.45 07 Oct 2024 10 Dec 2024 J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
663 111113Construction of C.C. road and drain in Ward-03, Purana Vijayanagar from Ram Bahadur to Chandrapal and from Satendra's house via Murali's house to Agnihotri's house. 4.53 03/09/2024 4.53 07 Oct 2024 10 Dec 2024 J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
664 112112Drain and CC road improvement work from Inspector's house to Dulichand's house in Ward-03, Old Vijayanagar. 9.83 27/08/2024 9.83 07 Oct 2024 10 Dec 2024 J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
665 113105Construction of C.C. road and drain from Kavi Medical Store to Mahendra Masterji and from Balbir to Jitendra's shop in Ward-04, Mata Colony. 9.95 03/09/2024 9.95 07 Oct 2024 10 Dec 2024 S.R.S. Buildcon SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
666 11448Construction work of interlocking tiles road and drain from Munna Khan's house (Madar Meri Wali Gali) to Raju Kori's house and from Nirjan Kapde Walo to Rathore Chaat Wale in Ward-04, Mata Colony. 9.97 09/09/2024 9.97 09 Sep 202414 Oct 2024 08 Oct 2024 Pragati Enterprises SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
667 115103Work of construction of interlocking tiles road and drain from the house of Harveer Singh to the house of Askin in Ward-04, Rozi Colony. 2.44 27/08/2024 2.44 07 Oct 2024 10 Dec 2024 S.R.S. Buildcon SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
668 117102Construction of CC road and drain from house no. 282 to Lochan Singh's house in ward-04 Mata Colony 8.07 27/08/2024 8.07 07 Oct 2024 10 Dec 2024 S.R.S. Buildcon SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
10.00%
669 118106Construction work of CC road and drain from Mastaram's house to Subhash's house in Ward-04 Mata Colony. 7.96 27/08/2024 7.96 07 Oct 2024 10 Dec 2024 S.R.S. Buildcon SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
10.00%
670 12178Construction work of drain from Yogendra's house to Prakash's house in ward no. 05 Gagan Vihar and laying of interlocking tiles in the damaged street. 8.95 05/09/2024 8.95 09 Sep 202404 Dec 2024 08 Oct 2024 Abad Const Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
671 12282Construction work of drain from Urmila's house to Akash's house in ward no. 05 Gagan Vihar and laying of interlocking tiles in the damaged street. 8.27 05/09/2024 8.27 09 Sep 2024 08 Oct 2024 Abad Const Vinod KumarJunior Engineer MEMBER KOTAIn Progress
50.00%
672 12378Work of construction of drain and interlocking tiles from Ajay to Ramesh in Ward-07 Sudamapuri D-Block. 9.57 04/09/2024 9.57 27 Sep 202423 Jan 2025 14 Oct 2024 Abad Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
673 124104Work of construction of drain and interlocking tiles from Vicky to Ved Prakash, Kanishka Beauty Parlour to Chandrapal in Ward-07 Adarsh ​​Colony. 8.16 03/09/2024 8.16 07 Oct 2024 10 Dec 2024 S.R.S. Buildcon SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
674 12559Road improvement work by interlocking tiles on the damaged road from Dr. L.L. Sharma to Mithlesh, Nandi Lal to Prithvi in ​​Ward-07 Ardash Colony. 7.59 03/09/2024 7.59 27 Sep 202402 Jan 2025 14 Oct 2024 Abad Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
675 12660Road improvement work by interlocking tiles on the damaged road from Prithvi to Tewatia, Ashu to Kiran, Nandi Lal to Sonu in Ward-07 Adarsh ​​Colony. 9.78 02/09/2024 9.78 27 Sep 202402 Jan 2025 14 Oct 2024 Abad Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
676 12795Road improvement work by interlocking tiles on the damaged road from B.S.Tomar to Shiv Vihar square, behind Shri Ram temple in Ward-07, Shiv Vihar and work of laying RCC culvert in front of Prashant General Store, Vishnu. 8.77 03/09/2024 8.77 07 Oct 202411 Dec 2024 10 Dec 2024 A.P Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
677 128141Construction work of CC road and drain in the service line behind house no. 51 from SL Agarwal to Subhash Kansal in Ward-08, Laxmi Vihar Colony. 8.20 05/09/2024 8.20 09 Sep 202430 Dec 2024 30 Dec 2024 Vinod kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
678 12955Construction work of CC road and drain in Ward-08, Laxmi Vihar, near the triangular park, in front of Pramod Kumar and in front of Agarwal. 7.37 05/09/2024 7.37 09 Sep 202414 Oct 2024 09 Oct 2024 Vinod kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
679 130147Work of CC and drain parapet from Baljeet's house to Barfi's house in Ward-09, Shibbanpura. 4.60 05/09/2024 4.60 26 Nov 202407 Jan 2025 07 Jan 2025 S.D. Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
40.00%
680 131129Work of drain construction and interlocking tiles from H.No. 222 Shri Omveer to Meerut Road liquor shop in Ward-09, Purana Aryanagar. 6.65 11/07/2024 6.65 09 Sep 2024 14 Oct 2024 A3R Ent NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
80.00%
681 13288Work of making ramp in front of Aggarwal Sweets and near Ekta Park under Ward 10. 2.22 05/09/2024 2.22 09 Sep 202412 Nov 2024 08 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
682 13367Work of drain and interlocking tiles from Kanti Sharma to Adesh Tyagi and from Inam's house to Gaje Sharma's house in Ward-11, Nandgram Sangam Vihar. 9.25 05/09/2024 9.25 09 Sep 2024 09 Oct 2024 A.H Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
683 134112Work of drain and interlocking tiles in front of Himanshu Tyagi's house in Ward-11, Krishnakunj and from Rohela to behind Takshila School. 7.96 05/09/2024 7.96 09 Sep 202430 Nov 2024 14 Oct 2024 Nirban Infra Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
684 135140Road improvement work by Dense on the road from Kunal Tyagi to Shiv Shankar in Ward - 12, Jatwada Computer Market and work of interlocking tiles on the side track and work of interlocking tiles in front of Siddharth School. 8.05 05/09/2024 8.05 26 Nov 202430 Dec 2024 30 Dec 2024 Zuber Const. Preeti BansalJunior Engineer MEMBER KOTAIn Progress
0.00%
685 136124Ward-12, Hardev Sarai: Construction of drain and C.C. road from H.No.-95 and Jain sahab's house via Pankaj Tyagi to Virendra's shop. 8.87 05/09/2024 8.87 28 Sep 202428 Nov 2024 14 Oct 2024 Shyama Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
686 137119Construction of C.C. road and drain in ward-12, Kasyawan from Musharraf's house via Aslam to Imran, via Jameel to Bhuura to Adil and from Nazim to Kasam. 8.82 05/09/2024 8.82 09 Sep 202428 Nov 2024 14 Oct 2024 A P Const NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
687 138140Construction work of drain and CC road from the house of Shri Om Prakash Giri to the house of Shri Shankar Jha in Ward-14, Sector-12 Sarvodaya Nagar. 6.33 03/09/2024 6.33 26 Nov 202430 Dec 2024 24 Dec 2024 A.S. Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
688 13994Ward-14 Sarvodayanagar Street No. 08: Construction work of drain and CC road from Shri Baburam Sanger's house to I India Mart. 9.96 10/09/2024 9.96 07 Oct 202430 Dec 2024 10 Dec 2024 Manveer Singh Cont. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
689 140113Ward-17, Sevanagar Street No. 06: From Om Prakash Prachoon to Fauji's house and from Kamal Singh via RS Electricals to Ravi's house, drain and C.C. work. 7.85 05/09/2024 7.85 09 Sep 2024 14 Oct 2024 Shree Balaji Ent. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
75.00%
690 14158Ward-17, Sevanagar Vishwakarma Marg: Work of drain and interlocking tiles from Neeraj to Kishore's house via Brij Kishore's house and till Vishwakarma main road. 9.85 05/09/2024 9.85 09 Sep 202415 Oct 2024 09 Oct 2024 Pramood Kumar Singhal Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
691 142111Work of drain and C.C. from Lokesh Tyagi to Real Beauty Parlour in Ward-17, Seva Nagar and in Dr. Bengali lane and Ajit Tiwari lane. 8.41 02/09/2024 8.41 09 Sep 2024 14 Oct 2024 Shree Balaji Ent. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
60.00%
692 14362Work of drain and interlocking tiles from Nagendra Chaudhary's house to Lokesh Pandit's house in Ward 18, Rajapur. 7.47 03/09/2024 7.47 09 Sep 2024 09 Oct 2024 JSS Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
693 14467Work of drain and interlocking tiles in Pramod Wali Gali and Deepak Moodi Wali Gali in Ward 18, Rajapur. 3.85 03/09/2024 3.85 09 Sep 202415 Feb 2025 09 Oct 2024 Raguwanshi Builtack Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
694 14561Work of drain and interlocking tiles from Yad Ram's house to D P's house and in Sudhir's street in ward 18, Rajapur. 2.74 03/09/2024 2.74 09 Sep 202422 Jan 2025 09 Oct 2024 A3R Ent Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
695 14658Work of drain and interlocking tiles from Gulshan's house to A-168 in Ward 18, Bagwali Colony. 4.55 03/09/2024 4.55 09 Sep 202422 Jan 2025 09 Oct 2024 A3R Ent Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
696 14769Work of interlocking tiles from Reliance Industries to Dalip via Anas Fabrication in Ward-19, Patel Nagar Bounjha and construction work of drain and C.C. road from Bhagwan Daan to Banke Lal. 9.32 05/09/2024 9.32 09 Sep 2024 09 Oct 2024 Mahima Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
10.00%
697 14861Ward-19, Jagdish Nagar Tyre Market, R.K. Construction of interlocking tiles from Rubber to Meena's house. 9.76 05/09/2024 9.76 09 Sep 2024 09 Oct 2024 Mahima Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
698 14974Construction work of drain and interlocking tiles in the damaged street from Jai Singh's house to Balram Kasana's house in Ward 20 Bhaipura. 5.69 05/09/2024 5.69 09 Sep 2024 08 Oct 2024 Global Engg. & Infra. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
699 15080Construction work with interlocking tiles in the damaged street from Rajendra's house to Krishna Pal's house in Ward 20 Bhaupura. 2.32 05/09/2024 2.32 09 Sep 2024 08 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
700 151137Construction work of interlocking tiles on site plate in KV Block in Ward-21 Bhowapur. 9.24 05/09/2024 9.24 07 Oct 202424 Jan 2024 24 Jan 2024 Mahalaxmi Infra. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
701 15297Improvement work through drain and CC road in the damaged street from Dinesh Pandit's house to Rinku Pandit's house in Ward-21 Bhowapur. 6.19 05/09/2024 6.19 27 Sep 202406 Nov 2024 15 Oct 2024 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
702 15390Improvement work through drain and CC road in the damaged street from Bablu's house to Pappu's house and from Satte's house to Vijay Singh's house in Ward-21 Bhowapur. 4.57 05/09/2024 4.57 09 Sep 202428 Nov 2024 15 Oct 2024 Mahalaxmi Infra. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
703 154108Improvement work through drain and CC road in the damaged street from Sumit's house to Omi's house and from Satte's house to Satish's house and from Devendra to Shivam Deda in Ward-21 Bhowapur. 8.14 05/09/2024 8.14 09 Sep 202405 Nov 2024 15 Oct 2024 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
704 15582Work of installation and repair of iron railing etc. on the divider located on Shukra Bazar Road in Ward-21 Bhowapur. 7.70 05/09/2024 7.70 09 Sep 2024 15 Oct 2024 Shri Ram Const. POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
40.00%
705 156144Construction work of CC road and drain from Yadav Niwas to Ekta Siddh (House No. 55/A) in Ward-22 Radhankuj Enclave. 2.99 09/09/2024 2.99 07 Oct 202402 Jan 2025 02 Jan 2025 Amita Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
80.00%
706 157155Construction work of C.C. road and drain in Bakery lane on Ward-22, Bhatia Road and in Dheeraj Singh Choudhary (Anurag Choudhary) lane. 7.18 09/09/2024 7.18 26 Nov 202420 Jan 2025 20 Jan 2025 Dua Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
707 158128Construction work of C.C. road and drain from Nanne's house to Bala's house in Ward-22, Daulatpura Purana Telmill Wali Gali. 2.97 05/09/2024 2.97 09 Sep 202408 Apr 2025 08 Apr 2025 Shri Visnu Asso. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
708 159109Work of construction of interlocking tiles road and drain from Mehru's house to Akbar's house in Ward-23, Kaila Kheda. 8.39 27/08/2024 8.39 07 Oct 202413 Dec 2024 10 Dec 2024 J.P. Shakti Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
709 160118Construction work of interlinking tiles road and drain construction in Salman Kinnar Wali Gali from Noorhasan to temple, Titu to Balkishan and various lanes in Ward-23, Kaila Kheda. 8.43 27/08/2024 8.43 07 Oct 2024 10 Dec 2024 J.P. Shakti Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
710 161115Work of construction of CC road and drain from Anil Sagar to Shanti Kunj in Ward-23, Kailashnagar Street No.7. 3.16 03/09/2024 3.16 07 Oct 202427 Dec 2024 10 Dec 2024 J.P. Shakti Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
711 162117Construction work of CC road and drain in Ward-23, Kailashnagar, from Bhola Prajapati to Rajesh Prajapati, from Gyani via Sunil to Rajesh's house and from Sanjay Kirana Store to Hina. 6.44 06/09/2024 6.44 07 Oct 202427 Dec 2024 10 Dec 2024 J.P. Shakti Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
712 163133Work of drain and interlocking tiles from Aziz's house to Sheeshpal's house in Ward 24, Bayana village. 3.79 03/09/2024 3.79 27 Sep 202412 Dec 2024 15 Oct 2024 Vansh Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
713 164131Work of drain and interlocking tiles from Kalu's house to Rajveer's house in Ward 24, Nayphal village. 1.44 03/09/2024 1.44 27 Sep 2024 15 Oct 2024 Vansh Const. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
20.00%
714 165150Repair work of drain and interlocking tiles in Ward 24, Mehrauli Village, from Bittu's house via Satveer's shop to Rogan Pal's house. 3.67 03/09/2024 3.67 07 Oct 202412 Dec 2024 12 Dec 2024 Trinetra Infra Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
715 166141Work of drain and interlocking tiles from Beni's Dairy to Rajpal's house in Ward 24, Mehrauli Village. 5.80 03/09/2024 5.80 07 Oct 202421 Feb 2025 07 Oct 2024 Marden Const.Co. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
716 167137Work of drain and interlocking tiles from Sarfaraz's house to Ilyash's house in Ward 24, Bayana. 7.01 03/09/2024 7.01 09 Sep 2024 15 Oct 2024 Chandra Mohan Singh Raguwanshi Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
717 168160Construction work of C.C. road and drain in Ward No. 11, Ambedkar Nagar, from Munni Devi's house to Hari's house in Street No. 16, from Shobha Devi's house to Vinod Kumar's house via Arvind's house in Street No. 15. 9.96 03/09/2024 9.96 10 Feb 202512 Mar 2025 28 Feb 2025 Keshram Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
718 16979Work of interlocking tiles on the side track of the road from in front of house no. D/78 in Ward-25, on three sides of F-Block park and from in front of house no. B/122 to house no. B/54 in B-Block. 3.87 03/09/2024 3.87 09 Sep 202426 Nov 2024 14 Oct 2024 Trinetra Infra SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
719 17047Ward - 25, from Vinod Kumar Advocate to Satyacharan (Ashram Wali Gali), Vashisht Shishu Mandir Gali and the lane behind Shankar's shop, work of drain and interlocking tiles and work of interlocking tiles on both sides of the side track of the road in front of Rosewell School. 9.99 09/09/2024 9.99 09 Sep 202414 Oct 2024 08 Oct 2024 Nikhil Asso. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
720 17182Work of interlocking tiles on the side track outside Ramlila Ground, Ward-25. 6.45 03/09/2024 6.45 09 Sep 202410 Dec 2024 14 Oct 2024 Pragati Enterprises SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
721 172134Construction work of C.C. road and drain in lane no. 05 from Jeet Bag House to Lali's house in ward-25, Ambedkar Nagar, lane no. 13 from Manoj Dhol Wala to Ramesh Chand. 4.51 02/09/2024 4.51 26 Nov 2024 24 Dec 2024 Pardhan Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
722 17346Work of drain and interlocking tiles in Ward-25, Ambedkar Nagar from Syoraj Singh to Vinod and in Gupta Wali Gali and work of interlocking tiles on the side track of the road from Roopchand Halwai to Narendra Mohit. 9.50 09/09/2024 9.50 09 Sep 2024 08 Oct 2024 D S B ENTERPRiSES SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
723 17481Road and drain improvement work by C.C. on the damaged road from Nach Bharat Tent House to Ghaziabad Convent School and subsidiary lane in Ward No. 26, Bhud-Bharat Nagar. 4.00 03/09/2024 4.00 27 Sep 202415 Oct 2024 14 Oct 2024 Sidh Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
724 17583In ward no. 26, Madhopura, from Shivcharan to Bichhu Gurjar, Chamunda temple to Jagdish Jain, Chamunda temple to Shani temple, damaged road is repaired with C.C. Road and drain repair work. 6.82 03/09/2024 6.82 09 Sep 202415 Oct 2024 14 Oct 2024 Sidh Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
725 17699Road improvement work by interlocking tiles on the damaged road from Somdatt Sharma ji to Satyapal, Satyapal to Ishwar in Ward-27, Shanti Nagar. 8.33 03/09/2024 8.33 07 Oct 202404 Mar 2025 04 Mar 2025 Marden Const.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
726 17789Repair work of damaged road in front of Dundahaida pond, Ward No. 27. 3.29 03/09/2024 3.29 07 Oct 2024 10 Dec 2024 Chandra Mohan Singh Raguwanshi SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
727 178187Construction work of drain and interlocking tiles in the damaged street from J.P. Tyagi's house to Rizwan's house in Neelmani Colony, Ward 28, Rajiv Colony. 5.99 05/09/2024 5.99 07 Oct 202405 Sep 2024 12 Dec 2024 Pradhan Contr. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
728 17919Boundary wall work of Chamad Mata temple site in Kharsa No. 164 in Ward 30, Sadarpur. 9.82 03/09/2024 9.82 21 Oct 202424 Feb 2025 21 Oct 2024 Bashoya Const. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
0.00%
729 180106Work of drain and interlocking tiles from Rajveer's house to Subodh's house and from Kalua's house to Jugendra Singh's house in Ward 30, Sadarpur. 8.39 03/09/2024 8.39 09 Sep 202423 Nov 2024 14 Oct 2024 Aanav Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
730 181160Work of drain and interlocking tiles from Sunil Verma's house to Mahesh's house and from Subhash Pehlwan's house to Manjoor's shop in Ward 30, Sadarpur. 3.30 03/09/2024 3.30 26 Nov 202423 Jan 2025 23 Jan 2025 Abad Const Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
731 182124Work of drain and interlocking tiles from Harendra's house to Jaipal's house and in Subhash wali gali in ward 30, Sadarpur village. 2.02 03/09/2024 2.02 27 Sep 202412 Dec 2024 15 Oct 2024 Vansh Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
732 183114Work of construction of interlocking tiles and drain from the house of Rajbir Sain to the house of Chaudhary Rishipal, adjacent to District Cooperative Bank in Ward-31, Sihani. 4.51 05/09/2024 4.51 09 Sep 202418 Mar 2025 27 Sep 2024 Prakesh Const.Co. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
733 184114Construction work of drain and interlocking tiles from Ratanlal Sharma to Avnish Kumar Tyagi and from Srinivas to Lilu's house in Ward-31, Sihani. 6.02 02/09/2024 6.02 09 Sep 202412 Dec 2024 14 Oct 2024 J P Sakti Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
734 18560Construction work of drain and interlocking tiles from Rajkumar to Rajan's house in Ward-32, Krishnanagar. 6.07 05/09/2024 6.07 09 Sep 202426 Nov 2024 09 Oct 2024 A.H Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
735 18653Construction work of C.C. road and drain in Ward-33, Hata Chairman, near Subhash Ghodi Wale, in front of Danny, in front of Jani and in front of the apartment. 9.79 11/07/2024 9.79 09 Sep 2024 09 Oct 2024 Mahakaleshwar Engg. Preeti BansalJunior Engineer MEMBER KOTAIn Progress
0.00%
736 18749Construction work of CC road and drain in the street in front of Mullaji in Ward-33, Sarai Nazar Ali. 9.93 07/09/2024 9.93 09 Sep 2024 09 Oct 2024 Mahakaleshwar Engg. Preeti BansalJunior Engineer MEMBER KOTAIn Progress
20.00%
737 188159Work of drain construction in the small street behind the post office in Ward-33, Sarai Nazar Ali. 4.50 07/09/2024 4.50 07 Oct 202430 Jan 2025 30 Jan 2025 Trinetra Infra Preeti BansalJunior Engineer MEMBER KOTAIn Progress
60.00%
738 189otherWork of laying interlocking tiles in the courtyard of the primary school of Ward 34 Shahidnagar First. 5.88 05/09/2024 5.88 09 Sep 2024 08 Oct 2024 Akruti Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
739 19079Repair work by drain and C.C. in the damaged lane from Khalil's house to Nausaad's house (Chanda wali lane) in ward 34 Shaheednagar Pratham. 2.48 05/09/2024 2.48 09 Sep 2024 08 Oct 2024 Akruti Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
740 191137Construction work of damaged lane/road through CCC and drain in Ward-35 Buddhist Vihar Akbarpur Bahrampur from Subhash's house to Gopal's house, from Gyanendra's house to Sanjay Master's house, from Devendra Chaudhary's house to Saurabh's house. 9.63 04/09/2024 9.63 26 Nov 202402 Jan 2025 24 Dec 2024 Pardhan Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
741 19290Construction work of damaged lane/road through CC and drain from Shyam Lal's house to Satendra's house in Ward-35 Buddhist Vihar Akbarpur Bahrampur. 7.31 04/09/2024 7.31 07 Oct 202419 Dec 2024 10 Dec 2024 Balaji Const.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
742 19353Work of laying interlocking tiles in front of Vasundhara Sector 16 market in Ward 36 Sector 16 Vasundhara. 2.95 05/09/2024 2.95 09 Sep 2024 09 Oct 2024 H.R. Builders POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
743 194105Repair work of damaged road from behind Awas Vikas office to main road in Ward 36 Sec 16A Vasundhara by Danes. 5.65 05/09/2024 5.65 09 Sep 202415 Oct 2024 15 Oct 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
744 195112Repair work of damaged road from H.No. 16A/2001 to near S Plaza in Ward 36, S. 16A Vasundhara, near Awas Vikas Guest House, by DANS. 9.88 05/09/2024 9.88 09 Sep 202415 Oct 2024 15 Oct 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
745 196101Work of construction of drain and laying of interlocking tiles from Subodh Sharma's house to Nitin Sharma's house via Shivkumar's house in Ward 36, Prahladgarhi village. 6.07 05/09/2024 6.07 09 Sep 202405 Nov 2024 15 Oct 2024 Ujjwal Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
746 19737Work of construction of drain and laying of interlocking tiles from BH No. 16/08 to Jaiveer Singh's house in Ward 36, Prahladgarhi village. 6.14 05/09/2024 6.14 09 Sep 202411 Nov 2024 09 Oct 2024 Tej Const Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
747 19852Construction of drain and road improvement work through interlocking tiles and C.C. in ward 36, Prahaladgadhi village, from Somdatta to Basanta's house, in the street containing Krishnapal, Fatte, Vipin and Anup Singh. 9.05 05/09/2024 9.05 09 Sep 202405 Nov 2024 09 Oct 2024 Tej Const Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
748 19990Construction work of drain and CC from B-187 to B-55 in Ward 37, Shalimar Garden. 8.67 05/09/2024 8.67 09 Sep 2024 08 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
10.00%
749 20075Construction work by Sugar Pie Skool Interlocking Tiles from Plot No 499, Ward 37, Shalimar Garden. 6.61 05/09/2024 6.61 09 Sep 202412 Dec 2024 08 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
750 20187Construction work by interlocking tiles from B-214 to B-230 in Ward 37, Shalimar Garden. 8.35 05/09/2024 8.35 09 Sep 202414 Oct 2024 08 Oct 2024 A.S. Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
20.00%
751 20292Work of drain and interlocking tiles in the damaged lane from Kapil Goyal's house to K.R.T. Public School in Ramnagar, Ward 38, Arthala. 9.53 05/09/2024 9.53 09 Sep 2024 08 Oct 2024 JSS Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
80.00%
752 203165Road improvement work by DANS from Vinod Shukla to Rakesh Marg via A/51, K/104 in Ward-39, Nehrunagar Third A & K. 9.94 07/09/2024 9.94 07 Oct 2024 20 Feb 2025 Prateek Enter. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
753 20450Work of construction of interlinking tiles and drains in Somvati, Bablu Pal Wali Gali and Sunaro Wali Gali in Ward-39, Nasirpur. 9.47 07/09/2024 9.47 09 Sep 2024 09 Oct 2024 A.S. Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
754 20551Work of construction of interlinking tiles and drain in Ward-39, Rakesh Marg Street No. 02 and G-50, G91, G-100 in G Block, near the park and in the street behind the Patwari. 9.52 07/09/2024 9.52 09 Sep 202410 Oct 2024 09 Oct 2024 A.S. Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
755 20654Work of construction of interlinking tiles and drain in service line behind Ward-39, Nasirpur Nehru Nagar Third A/18 and buffalo dairies. 8.43 05/09/2024 8.43 09 Sep 202410 Oct 2024 09 Oct 2024 A.S. Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
756 20799Construction work of K.C. drain and C.C. road from B 540 to Ramash's house via Kaushik Medical Store in Ward-40 Sahibabad village. 7.72 05/09/2024 7.72 09 Sep 2024 15 Oct 2024 Shri Balaji Enter. Sanjay GangwarJunior Engineer MEMBER KOTAIn Progress
5.00%
757 208110Construction work of drain and interlocking tiles from A to Z Mobile to Mahasingh (Charan Singh wali gali) in ward-40 Sahibabad village. 5.31 11/07/2024 5.31 09 Sep 2024 15 Oct 2024 Ujjwal Const. Sanjay GangwarJunior Engineer MEMBER KOTAIn Progress
5.00%
758 20995Construction work of drain and CC road from Lucky flour mill to Sunny Shakshaina and Suresh Chauhan's house to Chhuttan's house and from Rinku Tomar's house to Rana's house and from Omprakash's house to Ramchandra in lane no. 1 in ward-40, Jhandapur. 5.46 05/09/2024 5.46 09 Sep 202406 Mar 2025 15 Oct 2024 Shri Balaji Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
759 210106Construction work of RCC drain and CC road from Samar Sharma to Saxena Super Store and from Rahul Sharma Dairy to Pratap's house in Ward-40 Jhandapur. 8.14 05/09/2024 8.14 09 Sep 202418 Mar 2025 15 Oct 2024 Shri Balaji Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
760 21175Construction work of culverts in Balmki Mohalla, Dhara Wali Gali, Railway Line Main Road, Dhobi Wali Gali, near Shiv Mandir, near Primary School and other places in Ward-40, Sahibabad Village. 3.85 05/09/2024 3.85 09 Sep 2024 15 Oct 2024 Chandra Mohan Singh Raguwanshi Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
761 21286Construction work of C.C. road and drain from Nandini General Store to house no. 592 and from Rajendra Sharma's house to Shri Balaji Electrical in ward-41 Jhandapur. 6.92 05/09/2024 6.92 09 Sep 202425 Nov 2024 15 Oct 2024 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
762 213109Construction work of RCC drain from Kashinath Building to SK Packing via Red Rose in Ward-43 Kadkad. 5.53 05/09/2024 5.53 09 Sep 202424 Feb 2025 15 Oct 2024 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
763 214148Construction of RCC drain and road through CC from Mahendra's house to house no. 491 Geeta Devi in ​​Ward-43 Kadkad Model, from HDFC (ATM) to house no. 1095 (Cookie Wali Gali). 5.24 05/09/2024 5.24 21 Oct 202424 Feb 2025 24 Feb 2025 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
764 21585Repair work of drain and C.C. in the damaged lane from M.L. Public School to Anil Pandit's house and from Pramod to Suresh Chauhan's house in Ward 44 Sanjay Colony. 5.37 05/09/2024 5.37 09 Sep 202409 Dec 2024 08 Oct 2024 Chandra Mohan Singh Raguwanshi Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
765 21681Construction work by interlocking tiles in the drain and damaged street from Raju's house to Suraj's house in ward 45, Karhaida. 8.29 05/09/2024 8.29 09 Sep 202412 Nov 2024 08 Oct 2024 JSS Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
766 21757Work of drain and interlocking tiles from Krishanpal Singh's house to Chandrapal Singh's house and the street leading to Harendra Shahlot's house and from Jogendra's house to Ramlal's house in Ward 46, Guldhar II. 8.58 03/09/2024 8.58 09 Sep 2024 09 Oct 2024 A.S. Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
767 218128Road improvement work by Danes from house no. 201 to 219 in ward 46, Mansi Vihar. 6.77 03/09/2024 6.77 09 Sep 202415 Oct 2024 15 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
768 219 Work of drain and interlocking tiles from Manoj's house to house no. 169 in Ward 46, New Friends Colony. 9.88 11/07/2024 9.88 09 Sep 2024   Rajender SinghJunior Engineer MEMBER KOTA 
0%
769 220 Road improvement work by Danes from SC-262 to S-257 and SC-263 to SC-268 and SC-315 to SC-302 in Ward 47, Shastri Nagar C-Block. 9.05 11/07/2024 9.05 09 Sep 2024   Rajender SinghJunior Engineer MEMBER KOTA 
0%
770 221127Road improvement work by DANS from SC-230A to SC-205 in Ward 47, Shastri Nagar C-Block. 7.22 23/09/2024 7.22 09 Sep 2024 15 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
771 222147Work of drain and interlocking tiles from Z-22 to Z-20 in Ward 47, Mahendra Enclave. 6.69 03/09/2024 6.69 07 Oct 202412 Dec 2024 12 Dec 2024 A.K. Asso. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
772 22375Construction work of C.C. lane from in front of Bunty's shop to Chaudhary Rashid's house in Ward-48, Mirzapur. 6.08 04/09/2024 6.08 09 Sep 202403 Dec 2024 14 Oct 2024 B S Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
773 22450Ward-48, Mirzapur Sector-12, from Intezaar to Choudhary Nanne Kha's house, the damaged road is repaired with C.C. Road. Work of repairing the road with C.C. 9.67 05/09/2024 9.67 09 Sep 202414 Oct 2024 08 Oct 2024 A P Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
774 22574Ward-48, Mirzapur Sector-12 Nurani Masjid to Mustafa, Aslam Chaudhary to Intezaar, Bablu to Aslam Chaudhary, Wasim Wali Gali, damaged road, road improvement work by C.C. 7.93 03/09/2024 7.93 09 Sep 202403 Dec 2024 14 Oct 2024 B S Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
775 22649Ward-48, Mirzapur Sector-12 From Nisar's house to Nurani Masjid Jan Seva Kendra to Wasim, Wasim, to Aslam, damaged road repair work by C.C. 9.86 05/09/2024 9.86 09 Sep 2024 08 Oct 2024 A P Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
776 22773Ward-48, Mirzapur Sector-12 Dr. Naeem Siddiqui from Shifa Clinic, Sher Shah from Imran, Kamal Pal from Bharatpal, work of road repair work through C.C. for the damaged road. 8.41 03/09/2024 8.41 09 Sep 202426 Nov 2024 14 Oct 2024 B.S. Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
777 22880Road repair work through C.C. on the damaged road from Faryad's house to Dr. Naeem Clinic and subsidiary lanes in Ward-48, Sector-12, Mirzapur. 8.88 03/09/2024 8.88 09 Sep 202415 Oct 2024 14 Oct 2024 A P Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
778 22994Ward-50, Sadiq Nagar, from Manoj Tyagi to Om Tyagi and work of drain and C.C. road. 4.10 05/09/2024 4.10 09 Sep 202413 Dec 2024 14 Oct 2024 Prakash Const Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
779 23052Work of drain and C.C. road from Arun Kumar's house to Ramanand Sharma via Manish Kumar in Ward-50, Sadiq Nagar. 6.70 05/09/2024 6.70 09 Sep 2024 09 Oct 2024 Mahakaleshwar Engg. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
780 23156In Ward-50, Saddik Nagar, from Sharma Medical Store to Shri Krishna Sharma via Rajan's house and from Rajkumar Tyagi to Ravindra Sharma's house, work of drain and C.C. road. 9.42 05/09/2024 9.42 09 Sep 2024 09 Oct 2024 Mahakaleshwar Engg. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
781 232122Work of construction of interlocking tiles road and drain from Mange's house to grocery shop in Ward-52, Kot village. 9.91 11/07/2024 9.91 09 Sep 2024 14 Oct 2024 A.S. Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
15.00%
782 233117Construction work of C.C., interlocking tiles road and drain construction from Kanta Wali Gali and Chahat Wali Gali at Kuye Wala Chowk in Ward-52, Kot Village. 7.22 05/09/2024 7.22 09 Sep 2024 14 Oct 2024 A.S. Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
10.00%
783 23464Work of interlocking tiles road construction and drain repair work from Ward-52, Panchvati B/145 to Tikone Park. 9.98 05/09/2024 9.98 09 Sep 2024 09 Oct 2024 Mahakaleshwar Engg. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
784 235167Work of interlocking tiles road construction and drain repair work in front of house no. B/39, B/164, B/158 and B/172 in Ward-52, Panchvati B Block. 9.99 09/09/2024 9.99 05 Dec 202424 Feb 2025 24 Feb 2025 M.S. Buildwal NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
785 236169Construction work of C.C. road and drain in lane no. 04, Arya Samaj lane, Ward-52, Purana Aryanagar Kot Village. 7.56 09/09/2024 7.56 26 Dec 202425 Feb 2025 25 Feb 2025 Shree Radhya Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
786 23759Work of drain and interlocking tiles in Ward 53, Raispur, from Amarnath's house to China's house, from Vinod's house to Devendra's house, from Prakash's house to Vinod's house, in Jitendra and Lilu's street. 9.87 03/09/2024 9.87 09 Sep 202410 Oct 2024 09 Oct 2024 A.S. Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
787 23869Work of drain and interlocking tiles in Ward 53, Raispur, from Amit's house to Yashpal's house, Lala wali gali, Pradeep wali gali, Raj Singh wali gali. 9.50 03/09/2024 9.50 09 Sep 2024 09 Oct 2024 Om Enter. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
0.00%
788 239158Work of drain construction from Veeru's house to Ram Vatika in Ward 53, Raispur. 4.23 03/09/2024 4.23 07 Oct 202424 Jan 2025 22 Jan 2025 Dua Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
789 240159Work of interlocking tiles and shed in Harijan Chaupal in Ward 53, Raispur and work of interlocking tiles in front of the house of former councilor Narendra Chaudhary. 4.93 03/09/2024 4.93 07 Oct 202422 Jan 2025 22 Jan 2025 Dua Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
790 241otherWork of construction of Johar side wall and interlocking tiles from M-459 to M-452 in Ward 53, Sanjay Nagar M-Block. 7.24 03/09/2024 7.24 21 Oct 2024 12 Dec 2024 A.P Const. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
0.00%
791 24265Footpath work in Ward 53, Sanjay Nagar M-Block from M-324 to M-328, M-354 to M-361, M-92 to M-76. 7.12 03/09/2024 7.12 09 Sep 202410 Oct 2024 09 Oct 2024 Shri Balaji Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
792 243136Construction work of CC road parallel to our park from in front of Kishan Sharma's house in Sadbhavna Society in Ward-54. 4.17 22/08/2024 4.17 21 Oct 202422 Jan 2025 22 Jan 2025 JSS Const. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
793 244119Improvement work by interlocking tiles in Prayas Housing Society in Ward-54 Vasundhara Sector-03 from 3/273 to 3/283 and in front of Laxmi Narayan Temple. 8.89 05/09/2024 8.89 09 Sep 202416 Dec 2024 16 Dec 2024 Mahakaleshwar Engg. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
794 24570Construction work of interlinking tiles road in house no. 259 to 270, 258 to 247 and 236 to 246 (Tikona Park) in Ward-55, D Block. 9.99 03/09/2024 9.99 09 Sep 202415 Oct 2024 14 Oct 2024 V.S. Buildcon.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
795 24671Construction work of interlinking tiles road from house no. 236 to 402 and 403 to 393 in Ward-55, D Block. 9.74 03/09/2024 9.74 09 Sep 2024 14 Oct 2024 V.S. Buildcon.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
796 24772Construction work of interlinking tiles road in house no. 298 to 304 and 419 to 434 in Ward-55, D Block. 9.97 03/09/2024 9.97 09 Sep 202415 Oct 2024 14 Oct 2024 V.S. Buildcon.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
797 248138Road improvement work by DANS from 05/129 to 05/159 in Ward 56, Chiranjiv Vikar Sector-05. 9.93 03/09/2024 9.93 09 Sep 2024 15 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
798 24957In ward-57 Makanpur, from Manoj Tyagi via Moolchand to Ravi Tawar, from Islamuddin to Sachin Tyagi, from Moolchand to Sunita's house and from Lakesh Sharma to Kanti, road improvement work through drain and C.C. 9.96 05/09/2024 9.96 09 Sep 2024 09 Oct 2024 Mahakaleshwar Engg. POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
0.00%
799 250143Road repair work through C.C. on the damaged road from Sundar to Radheshyam, Madanlal to Sanjay Sharma's house in Ward-58, Mawai. 7.86 03/09/2024 7.86 26 Nov 202430 Dec 2024 24 Dec 2024 A.P Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
800 251135Road repair work through C.C. on the damaged road from Parshuram to Satendra, Kishan to Rajkumar, Deendayal to Manoj in ward 58, Mawai. 8.08 03/09/2024 8.08 26 Nov 202402 Jan 2025 24 Dec 2024 Pardhan Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
801 252122Road repair work through C.C. on the damaged road from Ashok Duggal to D.W.S. Academy, Devdutt Sharma in Ward 58, Mawai Street No. 11. 9.62 03/09/2024 9.62 09 Sep 202426 Dec 2024 24 Dec 2024 A.H Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
802 25395Improvement work by laying drain and interlocking tiles in damaged lane from GT Road to house no. 109/7 (Sawarwal lane) and Harpal Singh lane and Verma House in Ward 60 Shyampur Main. 7.30 05/09/2024 7.30 09 Sep 2024 08 Oct 2024 H.R. Builders Vinod KumarJunior Engineer MEMBER KOTAIn Progress
10.00%
803 25491Work of drain and interlocking tiles in the damaged street in Jai Bharat Enclave of Ward 60, Shyampur Main, in lane no. 06 from Church to B-41 and in lane no. 07 from Shanti Bhawan to Shakuntala Devi's house. 6.93 05/09/2024 6.93 09 Sep 202415 Oct 2024 08 Oct 2024 H.R. Builders Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
804 25584Work of drain and interlocking tiles in the damaged street in lane no. 04 from Surendra Sharma's house to the temple in Jai Bharat Enclave of Ward 60, Shyampur Main and from B 19 to B 26 in lane no. 05. 9.37 05/09/2024 9.37 09 Sep 2024 08 Oct 2024 Nikhil Asso. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
805 25683Repair work of drain and C.C. in the damaged lane from Budhram Sharma's house to Virendra's house in Rajiv Colony, Shyampur Main, from Virendra to Ramkumar's house. 9.56 14/08/2024 9.56 09 Sep 2024 08 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
50.00%
806 25777Construction of RCC drain in lane no. 04 of ward 60 Shyampur Main from Jaipal's house to Goyal Book wala's house and from Rai's house to temple and from Mikku's house to Aryan Academy. 9.91 14/08/2024 9.91 09 Sep 202421 Nov 2024 08 Oct 2024 J.P. Shakti Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
807 25896Repair work of drain and C.C. in damaged lanes of Raghupat Pandey wali, Nand Sharma wali and K.S. Rawat in Indra Garden of ward 60 Shyampur Main. 6.02 14/08/2024 6.02 09 Sep 202407 Nov 2024 08 Oct 2024 H.R. Builders Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
808 259111Repair work of the damaged road near Shivaji Park and Central Park in Ward No. 61-10 by Dense. 9.07 06/09/2024 9.07 09 Sep 202415 Oct 2024 15 Oct 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
809 26063Repair work of damaged road from Central Park to Mahavir Marg in Ward 61 Sec 10 by Dense. 5.32 05/09/2024 5.32 09 Sep 202415 Oct 2024 14 Oct 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
810 261186Construction work of drain and damaged street through C.C. from Shahid's house to Anish's house in Ward No. 64, Garima Garden. 9.40 05/09/2024 9.40 07 Oct 202412 Dec 2024 12 Dec 2024 Pradhan Contr. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
50.00%
811 262152Construction work by interlocking tiles in the drain and damaged street from Mustakim's house to Imtiaz's house in Ward 64 Garima Garden. 8.66 05/09/2024 8.66 09 Sep 2024 15 Oct 2024 Marden Engg. Asso. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
812 26354Work of interlocking tiles and drain repair from R-07/194 to R-07/174 in Ward 67, Rajnagar. 9.86 02/09/2024 9.86 09 Sep 2024 09 Oct 2024 Mahakaleshwar Engg. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
0.00%
813 26471Work of Public Facility Centre with NITRA wall in front of CMO office in Ward 67, Sanjay Nagar. 9.54 11/07/2024 9.54 09 Sep 2024 09 Oct 2024 Keshram Const. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
10.00%
814 26552Work of installing S.S. boards at various places in Ward 67, Sanjay Nagar. 9.52 02/09/2024 9.52 09 Sep 2024 08 Oct 2024 S.R.S. Buildcon Rajender SinghJunior Engineer MEMBER KOTAIn Progress
0.00%
815 26682Work of installing directional boards at various places in Ward 67, Sanjay Nagar. 9.89 03/09/2024 9.89 09 Sep 2024 09 Oct 2024 Keshram Const. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
0.00%
816 267134Improvement work by interlocking tiles in damaged streets from B-317 to B-353 in Ward-68 Brajvihar. 8.62 01/09/2024 8.62 09 Sep 202420 Jan 2025 20 Jan 2025 V.K. Contr. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
817 268139Improvement work by interlocking tiles in the damaged streets from B-260 to B-352 and B-286 to B-322 in Ward-68 Brajvihar. 9.70 01/09/2024 9.70 07 Oct 202424 Jan 2025 24 Jan 2025 V.K. Contr. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
818 26975Repair of drains from D-17/1 to D-121 in D Block in Ward-68 Brajvihar and improvement work by interlocking tiles in damaged streets. 8.21 05/09/2024 8.21 09 Sep 202430 Dec 2024 15 Oct 2024 Chandra Mohan Singh Raguwanshi Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
819 27054Repair of drain from D-152 to D-217 and D-124 in Ward-68 Brajvihar and improvement work by interlocking tiles in damaged streets. 7.18 05/09/2024 7.18 09 Sep 202410 Oct 2024 09 Oct 2024 J P Goyal Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
820 27138Improvement work by interlocking tiles in Ward-68 Brajvihar from C-153 to C-158 and from C-162 to C-169 and from C-166 to the corner of the park. 9.75 05/09/2024 9.75 09 Sep 202410 Oct 2024 09 Oct 2024 J P Goyal Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
821 272131Work of construction of interlocking tiles and drain on the side track in front of Yadavji Sweets in Ward-69, Lohianagar C-Block and from C-281 to C-287. 3.90 05/09/2024 3.90 09 Sep 2024 14 Oct 2024 Prakash Const NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
80.00%
822 273171Road improvement work by DANS in Ward - 69, Lohia Nagar Lal Quarter from H.No. 76/1 to 76/7 via H.No. 73/1 and from H.No. 69/8 to 72/1 and from H.No. 87/1 to 93/1. 9.12 05/09/2024 9.12 07 Oct 2024 05 Mar 2025 DKS Infratach India Pvt.Ltd. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
823 27481Work of interlocking tiles from E-57 to E-356 in Ward 71, Sanjaynagar E-Block. 4.74 03/09/2024 4.74 09 Sep 202414 Oct 2024 09 Oct 2024 Shri Balaji Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
824 27580Work of interlocking tiles, Ward 71, Sanjaynagar E-468 to E-459. 5.68 03/09/2024 5.68 09 Sep 202410 Oct 2024 09 Oct 2024 Shri Balaji Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
825 276171Construction work of public facility center in front of J-139 in Ward 71, Sanjaynagar J-Block. 5.18 03/09/2024 5.18 09 Nov 202415 Feb 2025 26 Dec 2024 A.K Const Rajender SinghJunior Engineer MEMBER KOTAIn Progress
0.00%
826 277125Road improvement work by Danes in Ward 71, Sanjay Nagar J-Block from J-190 to J-133, J-229 to J-277 and J-322 to J-313. 8.37 11/07/2024 8.37 09 Sep 2024 15 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
0.00%
827 27836Construction work of damaged footpath from Veg Cinema to ICICI Bank in Ward-72 Kaushambi. 6.92 05/09/2024 6.92 09 Sep 2024 09 Oct 2024 H.R. Builders POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
10.00%
828 27956Construction work of CC road from flat no. 126 to 125 in Ward-74 Sec-19 Satyam Enclave. 3.67 09/09/2024 3.67 09 Sep 2024 09 Sep 2024 H.R. Builders POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
829 280113Work of laying mato sheet and construction of toilet at Public Service Centre in Ward 76, Vaishali Sector 2B. 3.88 09/09/2024 3.88 21 Oct 2024 30 Nov 2024 Nirban Infra POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
60.00%
830 28143Work of laying interlocking tiles on the road from house no. 1/530 to house no. 618 A Balaji Apartment in Ward 76, Sector 1, Vaishali. 7.56 05/09/2024 7.56 09 Sep 202406 Nov 2024 09 Oct 2024 Nikhil Asso. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
831 28240Work of laying interlocking tiles on the road from Drona Classes via 2B 41 to H.No. 23 in Ward 76, S. 2B, Vaishali. 5.45 05/09/2024 5.45 09 Sep 2024 09 Oct 2024 H.R. Builders POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
832 283130Work of construction of remaining wall of big drain in Ward 76, Vaishali Sector 2. 9.91 05/09/2024 9.91 21 Oct 202412 Dec 2024 12 Dec 2024 A.H Const. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
833 28458Work of laying interlocking tiles on the road between Buddha Vatika and Ram Vatika in Ward 76, Sec 2B, Vaishali. 3.20 05/09/2024 3.20 09 Sep 2024 09 Oct 2024 H.R. Builders POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
0.00%
834 285156Repair work of damaged road parallel to Gor Ganga II in Ward 77, Vaishali Sector 4 by Dense. 4.74 01/09/2024 4.74 07 Oct 2024 06 Mar 2025 DKS Infratach India Pvt.Ltd. POOJA SINGHJunior Engineer MEMBER KOTAIn Progress
0.00%
835 28689Construction work of drain and damaged street through C.C. in Gol Gappe street in ward 82, Jawahar Park. 9.88 05/09/2024 9.88 09 Sep 202415 Oct 2024 08 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
836 28786Construction work of drain from D9 to D1 in ward 83, Shyampur Ex. and construction work of interlocking tiles in the damaged street. 8.16 05/09/2024 8.16 09 Sep 202412 Nov 2024 08 Oct 2024 Pramood Kumar Singhal Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
837 288171Construction work of drain from D 29 to D 35A in Ward 83 Shyampur Ex. and construction work of interlocking tiles in the damaged street. 3.45 05/09/2024 3.45 09 Sep 202412 Nov 2024 15 Oct 2024 Mohit Choudhary Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
838 2891344Road improvement work by DANS from 06/199 to 06/186, 06/172 to 06/185, 06/35 to 06/47 in Ward 84, Rajnagar Sector-06. 9.85 03/09/2024 9.85 09 Sep 202415 Oct 2024 15 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
839 29076Construction work by interlocking tiles in various streets of L Block in Ward 85, Lajpat Nagar. 8.71 05/09/2024 8.71 09 Sep 202412 Dec 2024 08 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
840 291150Road improvement work by HIG-04 in Ward 86 Rajendra Nagar Road 05. 8.18 05/09/2024 8.18 09 Sep 202415 Oct 2024 15 Oct 2024 R.G. Builtach Engg. Ltd. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
841 29239Work of interlocking tiles on side track in composite school in Ward - 87, Justice Section 03, Indirapuram Makanpur. 4.96 05/09/2024 4.96 09 Sep 202406 Nov 2024 09 Oct 2024 R.R. Const. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
842 29371Construction work of drain and C.C. road in the damaged lane from Haji Nizam's house to Alamm Food in Ward No. 90 Shahid Nagar III. 7.43 05/09/2024 7.43 09 Sep 202412 Nov 2024 07 Oct 2024 Star Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
843 29473Construction work of drain and C.C. road in the damaged lane from Sharif's house to Aash Mohammad's house in lane no. 01 of ward 90 Shahid Nagar III. 8.25 05/09/2024 8.25 09 Sep 202412 Nov 2024 07 Oct 2024 Star Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
844 29572Construction work of drain and C.C. road in the damaged lane from Aash Mohammad's house to Haji Jamma's house in lane no. 01 of ward 90 Shaheednagar III. 7.42 07/10/2024 7.42 09 Sep 202412 Nov 2024 07 Oct 2024 Star Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
845 29656C.C. work in service lane behind K.C./E-55 to K.C./E-25A in C-Block, Ward 91, Kavi Nagar. 9.92 04/09/2024 9.92 09 Sep 202412 Dec 2024 09 Oct 2024 AKG Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
846 29766Work of interlocking tiles in front of KC-128 and KC/CC-20 in Ward 91, Kavi Nagar C-Block. 1.12 04/09/2024 1.12 09 Sep 2024 09 Oct 2024 M.S. Buildwal Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
847 29853Work of interlocking tiles in front of KF-63 and KF-64 in Ward 91, Kavinagar F-Block. 2.82 04/09/2024 2.82 09 Sep 2024 09 Oct 2024 M.S. Buildwal Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
848 29955CC work in service lane from KJ-42 to KJ-60 in Ward 91, Kavi Nagar J-Block. 9.01 04/09/2024 9.01 09 Sep 202423 Nov 2024 09 Oct 2024 AKG Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
849 30070Work of interlocking tiles from KL-01 to KL-40 in Ward 91, Kavinagar L-Block. 5.56 04/09/2024 5.56 09 Sep 202423 Nov 2024 09 Oct 2024 R.D. Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
850 301 Work of drain and C.C. road from Haji Shamsuddin to Maharaj's house in Ward-92, Kaila Islamnagar. 8.73 11/07/2024 8.73 09 Sep 2024   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 
0%
851 30259Work of repair of wall, chamber, net, RCC and Hume pipe and C.C. in front of Shri Rashid, Anwar, Aziz and Nazir shop in Ward-92, Kaila Islamnagar. 2.83 05/09/2024 2.83 09 Sep 2024 09 Oct 2024 K.K const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
852 30365Repair work of drain/sewer, culvert and C.C. in front of Shri Nadeem, Nasir Building, Bashir, Indian Medical, Zarif, Jarrah, Hakeem, Ramzani, Meenu, Main Road and Farooq's house in Ward-93, Kaila Bhatta. 2.87 02/09/2024 2.87 09 Sep 2024 09 Oct 2024 A.H Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
853 304123Work of drain and C.C. from Tayyab Qureshi to Shakeel's house and from Haji Bundu to Lahik in Ward-93, Kaila Bhatta. 6.29 05/09/2024 6.29 09 Sep 2024 14 Oct 2024 J P Sakti NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
854 30534Road improvement work by interlocking on damaged site plate from B-08 to B-11 in Alaknanda Apartment in Ward 94 Suryanagar Rampuri. 4.30 05/09/2024 4.30 09 Sep 202415 Jan 2025 09 Oct 2024 R R Const Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
855 306130Ward-92, Kaila Bhatta, lane no. 01 from Haji Khalil Qureshi to Haji Yasin and lane no. 02 from Indra Sardar to Shama and Yusuf and Salim's house and from Imran to Kalu's house. Construction of C.C. road and drain. 7.95 07/09/2024 7.95 09 Sep 2024 14 Oct 2024 Mahima Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
856 30766RCC road construction work from Sabir's house to Jumayeraullah Khan's house in Ward-95, Kaila Bhatta Habib Colony. 8.35 07/09/2024 8.35 09 Sep 2024 09 Oct 2024 A.P Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
857 30863Ward-95, RCC road construction work from Kaila Bhatta Habib Colony Gate to Haji Babu's house. 8.99 07/09/2024 8.99 09 Sep 2024 09 Oct 2024 A.P Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
858 309158Road improvement work by Danes from C-01 to C-10 and C-13 to C-41 in Ward-96, Nehrunagar-Second and interlocking tiles work from A-72 to A-74 in Ashoknagar. 9.54 05/09/2024 9.54 26 Nov 202428 Jan 2025 28 Jan 2025 P.P. Reyalcon Pvt.Ltd. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
Fund Name: NIGAM NIDHI 2024-25
859 310 Ward-96, Nehrunagar - Road improvement work by Danes from 3rd E-144 to H.No.-05 and from 3rd-E-30 to 3rd-E-179 and work of interlocking tiles in service lane from 3rd-E-60 to 3rd-E-54. 9.09 11/07/2024 9.09 09 Sep 2024   NAGENDRA SHARMAJunior Engineer MEMBER KOTA 
0%
860 31993Repair and painting work of Chhath Ghat situated on Hindon River in Ward-44, Sanjay Colony and Chhath Ghat near Sahibabad Station Shani Temple and barricading work in the river. 9.26 18/09/2024 9.26 19 Sep 202415 Oct 2024 08 Oct 2024 Global Engg. & Infra. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
861 32047Repair and painting work of Chhath Ghat under Kavi Nagar Zone. 9.06 18/09/2024 9.06 19 Sep 202410 Oct 2024 04 Oct 2024 Sakhar Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
862 32194Repair and painting work of Chhath Ghat under Mohan Nagar Zone. 7.55 18/09/2024 7.55 19 Sep 202415 Oct 2024 08 Oct 2024 Global Engg. & Infra. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
863 32296Repair and painting work of Chhath Ghat in Ward-03/25/51/55 under Vijaynagar Zone. 2.33 18/09/2024 2.33 07 Oct 202413 Dec 2024 10 Dec 2024 Pradhan Contr. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
864 32351Patch repair work at various places in Ward-51 and 55 under Vijaynagar Zone. (Access road to Ramlila Ground) 5.82 26/09/2024 5.82 19 Sep 202414 Oct 2024 09 Oct 2024 Modern Engg. Asso. SHIV KUMAR SAROJJunior Engineer NIGAM NIDHI 2024-25Completed
100%
865 324163Patch repair work at various places in Ward-91, Kavi Nagar. 4.54 05/09/2024 4.54 09 Nov 202405 Feb 2025 05 Feb 2025 Shantanu Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
866 32576Patch repair work at various places in Ward-71, Sanjaynagar. 9.81 05/09/2024 9.81 27 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
867 32683Patch repair work on Raispur Road in Ward-67, Sanjaynagar. 9.24 05/09/2024 9.24 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
868 32775Patch repair work on CNG Pump Road, Ward-62, Govindpuram. 7.62 05/09/2024 7.62 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
869 32884Patch repair work on Road No. 03, Ward-62, Govindpuram. 9.85 05/09/2024 9.85 27 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
870 32972Patch repair work on Road No. 02, Ward-62, Govindpuram. 9.98 05/09/2024 9.98 27 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
871 33073Patch repair work at various places in Ward-56, Chiranjiv Vihar. 4.15 05/09/2024 4.15 27 Sep 202402 Dec 2024 09 Oct 2024 Akansha Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
872 33178Patch repair work at various places in Ward-47, Shastri Nagar. 8.23 05/09/2024 8.23 19 Sep 202405 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
873 33273Patch repair work at various places in Ward-18, Rajapur and Shastrinagar. 9.47 05/09/2024 9.47 19 Sep 202402 Dec 2024 09 Oct 2024 Akansha Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
874 33379Patch repair work at various places on Ramlila route in Ward-84, Rajnagar. 9.32 19/09/2024 9.32 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
875 33477Patch repair work at various places in Ward-56, Chinrajeev Vihar and Avantika Pratham. 9.42 05/09/2024 9.42 19 Sep 202402 Dec 2024 09 Oct 2024 Akansha Const. Rajender SinghJunior Engineer NIGAM NIDHI 2024-25Completed
100%
876 33546Patch repair work on main road and Mother Dairy in Ward-54 Sector 11 and 13. 8.35 11/09/2024 8.35 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
877 33650Patch repair work on main road and Shop Prex Mall of Ward-89, 77 Vaishali Sector 3,2,4,5. 9.69 11/09/2024 9.69 19 Sep 202406 Nov 2024 27 Sep 2024 RG Buildtech Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
878 33741Patch repair work in wards 54 and 74 from Sector 1 cut Vasundhara via Kanawani culvert via Sector-19 Vasundhara to K.R.Mangalam cut of Sector-6 Vaishali on Gurudwara road. 9.78 11/09/2024 9.78 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
879 33845Patch repair work on service road Radisson Gajab Street and Shukra Bazar Road in Ward-21. 9.36 11/09/2024 9.36 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
880 33944Patch repair work of damaged potholes on the main road of Sahibabad Industrial Area Site-4 under Vasundhara Zone by Danes. 9.98 11/09/2024 9.98 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
881 34051Patch repair work on the internal roads of Vaishali Sector-2 B/2 C, Vaishali 3 Rachna Naveen Hospital Marg, Jain Mandir Marg and Vaishali Sector-1 in Ward-76, 77. 9.97 11/09/2024 9.97 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
882 34149Patch repair work on Ward-68 Braj Vihar main road and Radha Kunj Colony and Braj Vihar A and D Block roads. 9.73 11/09/2024 9.73 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: MEMBER KOTA 2024-25(II)
883 34242Patch repair work on service road of Ward-36 Vasundhara Sector 12 and 14. 9.38 11/09/2024 9.38 19 Sep 202415 Oct 2024 09 Oct 2024 RG Buildtech Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
884 796 Construction work of CC road and drain from Fateh Bahadur Yadav to Vijay Sharma's house near Children Public School, Ward-03. 7.14 30/01/2025 7.14 21 Mar 2025  J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
885 797 Construction work of drain from A-1 to A-16 and Akhilesh's house in ward 83 Shyampur Ex. and construction work of interlocking tiles in the damaged street. 7.15 30/01/2025 7.15 21 Mar 2025   Vinod Kumar 8650930015 Junior Engineer MEMBER KOTA 2024-25(II)Completed
100%
886 798 Construction work of CC road and RCC drain from Sundar Singh's house to Ashish's house via Rohtas's house in Ward-03, H Block. 7.16 30/01/2025 7.16 21 Mar 2025  Dhanwantri Veer Jhohari SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II) 
0%
887 799 Work of interlocking tiles inside Gautam Buddha Park in Ward-12, Kalkagarhi and on the side pavement of the road in front of Suchita Complex. 7.24 30/01/2025 7.24 21 Mar 2025  M.D. Enter. NAGENDRA SHARMAJunior Engineer MEMBER KOTA 2024-25(II) 
0%
888 8002Road improvement work through interlocking tiles from E-184 to E-201 and E-124 to E-103 in Ward 55 E-Block. 7.31 06/03/2025 7.31 21 Mar 202516 Jun 2025 16 Jun 2025 Pargati Enter. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 2024-25(II)In Progress
0.00%
Fund Name: NIGAM NIDHI 2024-25
889 801 Construction work of drain and C.C. road in the street from Gurudwara to Haseen's house in ward 34 Shaheednagar Pratham. 7.34 30/01/2025 7.34 21 Mar 2025  Govind Const. Vinod KumarJunior Engineer MEMBER KOTA 2024-25(II) 
0%
890 34348Patch repair work on the roads of Double Zonal Office Road, Sector 10B main road and Sector-10, 12, 14 Vasundhara between Ward-61, 36. 9.68 11/09/2024 9.68 19 Sep 202410 Oct 2024 09 Oct 2024 Arun Const.Co. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
891 34447Patch repair work on Dr. Burman Marg in Ward-72 Kaushambi. 9.95 11/09/2024 9.95 19 Sep 202410 Oct 2024 09 Oct 2024 Arun Const.Co. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
892 345109Road improvement work by patch near H.No. 11/9A, 11/104 and 11/6 in Ward-83, Rajendra Nagar Sector-11. 6.01 18/09/2024 6.01 19 Sep 202414 Oct 2024 09 Oct 2024 R.G. Builtach Engg. Ltd. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
893 346106Road improvement work by patch from plot no. 870 to 823 in Ward-78, Shalimar Garden Ex-1. 9.40 18/09/2024 9.40 27 Sep 202414 Oct 2024 09 Oct 2024 Maheshn Cand Contr. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
894 347105Road improvement work by patch work at various locations in Ward-70, Janakpuri and Vrindavan Garden. 9.64 18/09/2024 9.64 19 Sep 202414 Oct 2024 09 Oct 2024 Maheshn Cand Contr. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
895 348107Road improvement work by patch work from Shanti Mandar Kutir to Harihar Mandar's house in Ward - 28. 9.11 18/09/2024 9.11 19 Sep 202414 Oct 2024 09 Oct 2024 Maheshn Cand Contr. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
896 349112Road improvement work by patch work in front of Swami Vivekananda School, Ward-83, Rajendra Nagar. 8.78 18/09/2024 8.78 19 Sep 202414 Oct 2024 10 Oct 2024 R.G. Builtach Engg. Ltd. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
897 350108Patch improvement work of main Jain temple road, Ward-70, Rajbagh. 8.14 18/09/2024 8.14 19 Sep 202414 Oct 2024 09 Oct 2024 Maheshn Cand Contr. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
898 351104Road improvement work by patch near 10/4,10/6,10/9,10/7 and 10/20 in Ward-83, Rajendra Nagar. 7.15 18/09/2024 7.15 19 Sep 202414 Oct 2024 09 Oct 2024 R.G. Builtach Engg. Ltd. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
899 352110Road improvement work by patch on the road between Ward-83 and 86. 7.66 18/09/2024 7.66 19 Sep 202414 Oct 2024 09 Oct 2024 R.G. Builtach Engg. Ltd. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
900 353112Patch repair work near Mother Dairy, Chatore and H.No. 342 & 343 on Maurya Road in Mohan Nagar Zone. 9.52 18/09/2024 9.52 19 Sep 202414 Oct 2024 10 Oct 2024 R.G. Builtach Engg. Ltd. Vinod KumarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
901 35499Patch repair work of damaged road from Radha Krishna Wali Road and Padav culvert to community building in Ward no. 38 and 44. 9.02 07/09/2024 9.02 19 Sep 2024 09 Oct 2024  Sanjay Gangwar 8178016821 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
902 35598Patch repair work of damaged roads at various places in Ward-34 and 90 Shaheednagar. 9.95 17/09/2024 9.95 19 Sep 2024 09 Oct 2024  Sanjay Gangwar 8178016821 Junior Engineer NIGAM NIDHI 2024-25Completed
100%
903 356103Patch repair work of damaged road from Sahibabad Railway Station Cut GT Road Light to Girls Hostel in Ward-60, Shyampur Main. 8.57 13/09/2024 8.57 19 Sep 202414 Oct 2024 09 Oct 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
904 357114Repair work of damaged road by patch work from Seal Pack Company to Plot No. 80J of Rajendra Nagar Industrial Area, Ward-60, Shyampur Main. 9.98 13/09/2024 9.98 19 Sep 202414 Oct 2024 10 Oct 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
905 358102Repair work by patching the damaged road in lane no. 04 of Rajendra Nagar India Area in Ward-60, Shyampur Main. 9.65 13/09/2024 9.65 19 Sep 202414 Oct 2024 09 Oct 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
906 359101Patch repair work of the main damaged road of Rajendra Nagar Ind Area of ​​Ward-60, Shyampur Main. 9.87 13/09/2024 9.87 19 Sep 202414 Oct 2024 09 Oct 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
907 36071Patch repair work at various places in Ward-52 of City Zone, Old Aryanagar Road and Model Town. 9.76 19/09/2024 9.76 27 Sep 202425 Oct 2024 10 Oct 2024 Prateek Enter. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
908 36176Punch repair work at various places in Ward-31, Sihani Main Road, the road in front of Shagun Farm House and Ward-50. 9.94 17/09/2024 9.94 19 Sep 202410 Oct 2024 10 Oct 2024 Arun Const.Co. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
909 36277Patch repair work at various places in Ward-19 under City Zone. 5.88 17/09/2024 5.88 19 Sep 202414 Oct 2024 10 Oct 2024 Arun Const.Co. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
910 36386Patch repair work at various places in Ward-08 and 69 under City Zone. 9.97 17/09/2024 9.97 19 Sep 202410 Oct 2024 10 Oct 2024 Arun Const.Co. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25Completed
100%
911 36475Patch repair work at various places in Ward-09 and 49 under City Zone. 9.82 17/09/2024 9.82 19 Sep 2024 10 Oct 2024 Modern Engg. Asso. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
Fund Name: HON.MAYOR
912 36572Patch repair work at various places in Wards 12, 88 and 96 under City Zone. 9.94 17/09/2024 9.94 27 Sep 202415 Oct 2024 15 Oct 2024 Prateek Enter. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
913 36679Work of drain and interlocking tiles on both sides from Arvind Medical Store to Viru Choudhary's house via Bittu Choudhary in Ward - 50 Shanti Nagar and work of drain till Mithlesh's house. 18.37 18/09/2024 18.37 19 Sep 2024 10 Oct 2024 A.S. Const. NAGENDRA SHARMAJunior Engineer HON.MAYORIn Progress
0.00%
914 36785Work of construction of interlocking tiles on the road leading to the cremation ground located at Ward-50, Rajnagar Extension Road, Noor Nagar. 6.30 10/09/2024 6.30 19 Sep 202414 Oct 2024 10 Oct 2024 Juber Const SHIV KUMAR SAROJJunior Engineer HON.MAYORCompleted
100%
915 368136Work of construction of interlocking tiles and drain from Nathu Singh's house to Birbal Sharma's house on Bhatt Road in Ward-13 Ghukna. 2.80 10/09/2024 2.80 07 Oct 202412 Dec 2024 12 Dec 2024 J.P. Shakti Const. Preeti BansalJunior Engineer HON.MAYORCompleted
100%
916 369134Work of drain and interlocking tiles from Deendayal Sharma to Sonu Tyagi in Ward-11 Nandgram Brajnagri. 12.60 18/09/2024 12.60 07 Oct 202413 Dec 2024 13 Dec 2024 Zuber Const. Preeti BansalJunior Engineer HON.MAYORCompleted
100%
917 370154Work of drain and interlocking tiles from Shashibala's house to Rajiv Tyagi's house and from Adesh Tyagi to Rajni Sharma's house in Ward-50 Saraswati Vihar. 11.77 18/09/2024 11.77 07 Oct 202420 Jan 2025 20 Jan 2025 Pramood Kumar Singhal NAGENDRA SHARMAJunior Engineer HON.MAYORIn Progress
0.00%
918 37190Work of interlocking tiles on the damaged road in front of Gadhi village on Ward-16 Vardaan Road. 23.52 18/09/2024 23.52 19 Sep 2024 10 Oct 2024 Bashoya Const. Rajender SinghJunior Engineer HON.MAYORIn Progress
0.00%
919 37287Work of drain and interlocking tiles from Shiv Properties to Amit Bhatnagar's house in Ward-46 New Friends Colony. 11.87 18/09/2024 11.87 19 Sep 2024 10 Oct 2024 Om Enter. Rajender SinghJunior Engineer HON.MAYORIn Progress
20.00%
920 37385Work of drain and interlocking tiles from the house of Mahesh Tyagi to the house of Raje Sharma in Ward-16 Morta. 14.86 18/09/2024 14.86 19 Sep 2024 10 Oct 2024 Om Enter. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
921 37499Road improvement work by Danes in Ward-47 Shastri Nagar C-Block from Raj Gas Agency to SC-231, SC-231 to SC-287, SC-263 street, SC-302 to SC-315 and SC-256 to SC-251. 29.59 18/09/2024 29.59 19 Sep 2024 10 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
922 37598Ward-91 Kavi Nagar I Block K.I. Repair of drain from 01 to K.I.16 and tiling work on site track. 7.08 10/09/2024 7.08 19 Sep 202412 Dec 2024 10 Oct 2024 Vinod kumar Contr. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
923 37692Work of drain and interlocking tiles from Manoj's house to Yograj's house in Ward-30 Radha Garden. 6.35 11/09/2024 6.35 19 Sep 202415 Oct 2024 10 Oct 2024 JSS Const. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
924 37793Road improvement work through drain and Dense from C-83/64 to C-83/77 in Ward-62 Govindpuram C-Block. 20.60 18/09/2024 20.60 19 Sep 202415 Oct 2024 10 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
925 37894Road improvement work through drain and Dense in Ward-62 Govindpuram C-Block from C-83/82 to C-83/102, 83/102 to 83/98, 83/96 to 83/89, 83/89 to 83/82. 24.10 17/09/2024 24.10 19 Sep 2024 10 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
926 379142Work of drain and interlocking tiles from B-15 to B-105 in Ward-47, Mahendra Enclave. 23.18 20/02/2024 23.18 19 Sep 202415 Oct 2024 15 Oct 2024 A.S. Const. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
927 38095Work of drain and interlocking tiles from Anil's house to Vision Singh's house in Ward-30, Surya Garden. 4.50 19/09/2024 4.50 19 Sep 202415 Oct 2024 10 Oct 2024 JSS Const. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
928 38196RCC drain construction work from MAS Steel/Gali No.-04 to Gali No.-15 in Ward-30, Balaji Enclave. 29.86 19/09/2024 29.86 19 Sep 2024 10 Oct 2024 Marden Engg. Asso. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
929 38291Work of RCC drain and interlocking tiles in Raghuveer Tour & Travels/Gali No.16 to Gali No.9 in Ward-30, Balaji Enclave. 29.84 19/09/2024 29.84 19 Sep 2024 10 Oct 2024 Marden Engg. Asso. Rajender SinghJunior Engineer HON.MAYORIn Progress
30.00%
930 38397Work of interlocking tiles from King Gym to B-153 via B-163 in Ward-47, Mahendra Enclave. 14.67 19/09/2024 14.67 19 Sep 202414 Oct 2024 10 Oct 2024 A.S. Const. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
Fund Name: MEMBER KOTA
931 38488Work of drain and interlocking tiles from Primary School to Baljagat School in Ward-16, Sikrod Village. 27.42 19/09/2024 27.42 19 Sep 202403 Jan 2025 10 Oct 2024 Om Enter. Rajender SinghJunior Engineer HON.MAYORCompleted
100%
932 385132Ward-01, Bhim Nagar Street No. 08, from Subhash Pal to Mohan Kumar, repair of drains and improvement of damaged road by C.C. road. 14.96 10/09/2024 14.96 19 Sep 2024 24 Dec 2024 Pardhan Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
60.00%
933 38654Road improvement work of interlocking tiles on the damaged road from Roshan's house to Vinay's shop in Ward-02, Siddharth Vihar, Street No. 08 AB. 11.84 10/09/2024 11.84 19 Sep 2024 10 Oct 2024 A.S. Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
40.00%
934 38763Road improvement work by interlocking tiles on the damaged road from Avtar to Ankur in Ward-02 Siddharth Vihar Street No. 07 AB. 12.44 10/09/2024 12.44 19 Sep 202426 Nov 2024 10 Oct 2024 Nirvan Infra SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
935 38862Construction work of damaged lane/road from Kuldeep's house to Himmat's house and Lakhbir wali lane and the lane parallel to Himmat and from Vicky Mohan's house to Lala Shop in Ward-02 Siddharth Vihar through interlocking tiles and drain. 14.95 10/09/2024 14.95 19 Sep 2024 10 Oct 2024 Nirvan Infra SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
936 389otherConstruction work of damaged lane/road from Ritika Beauty Parlour house to Neetu's house and from Vinay's house to Neetu's house in Ward-02, Siddharth Vihar, Lane No. 02 with interlocking tiles and drain. 14.99 08/08/2024 14.99 07 Oct 2024  A.S. Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTA 
0%
937 390107Construction work of CC road and RCC drain from Kanchan Traders to Jaiveer Bhadana's house via Subhash Vakil on Ward-03, Thana Road. 19.21 10/09/2024 19.21 07 Oct 2024 10 Dec 2024 Zuber Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
938 391117Construction work of drain from Master Builder to Dharamveer's house in Ward 05 Gagan Vihar and construction work of interlocking tiles in the damaged street. 10.42 12/09/2024 10.42 19 Sep 2024 14 Oct 2024 Krishna Asso. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
939 392120Construction work of drain from Rakesh's house to Tillu's house in ward 05 Gagan Vihar and construction work of interlocking tiles in the damaged street. 22.36 12/09/2024 22.36 19 Sep 2024 14 Oct 2024 Asutosh Kumar Cont Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
940 39384Construction work of drain and interlocking tiles in Ward-06, D-Block and Handicapped Colony from D-269 to D-123 and in the street of D-193 and from Chandni to the house of Durgesh Devi. 14.92 10/09/2024 14.92 19 Sep 2024 10 Oct 2024 Anuj kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
80.00%
941 39483Construction work of drain and interlocking tiles in Ward-06, D-Block from D-172 to D-181 and from D-223 to Ramraja and from Adesh Tyagi to Rakesh Tyagi. 13.87 10/09/2024 13.87 19 Sep 2024 10 Oct 2024 Anuj kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
80.00%
942 39581Construction work of drain and interlocking tiles from Manoj to Ramphal and from Rishi to Prempal Singh and from Sanjay Kumar to Brijesh Singh and from Ashok wali gali and from Ramveer Tyagi to Zakir's house in Ward-06, Nandgram Deendayalpuri. 23.93 10/09/2024 23.93 19 Sep 2024 10 Oct 2024 Khoshla Asso. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
40.00%
943 396108Work of construction of drain and interlocking tiles in Dilip and subsidiary streets from Ankur Kashyap in Ward-07 Indraraj Colony. 12.52 10/09/2024 12.52 07 Oct 2024 10 Dec 2024 Zuber Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
944 397160Construction work of CC road and drain from Jitendra to Parvati's house in Ambedkar Bhawan, Shanti to Ramu and Raj in Ward-08, Ramagarhi. 10.18 10/09/2024 10.18 26 Dec 202406 Feb 2025 06 Feb 2025 Zuber Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
945 39878Construction work of C.C. road and drain in Shankar Manohar, Paneer Wali Gali and Haridatt Jatav Wali Gali in Ward-08, Pranagadhi. 11.41 10/09/2024 11.41 19 Sep 2024 10 Oct 2024 Vinod kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
946 39980Construction of C.C. road and drain from fire station to Jaipal ration and Khemchand's mill in ward-08, Maliwada 13.58 10/09/2024 13.58 19 Sep 2024 10 Oct 2024 Vinod kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
60.00%
947 400163Construction of C.C. road and drain in Ward-09, Shibbanpura from Omkar's house to Hariom's house via Virendra's house. 14.37 10/09/2024 14.37 09 Oct 202413 Feb 2025 13 Feb 2025 Vinod kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
948 401153Work of construction of interlocking tiles and drain in Ward-09, Shibbhanpura, from the house of Jasvir Singh via the house of Amar Singh to the house of Rajesh Kashyap. 13.20 10/09/2024 13.20 07 Oct 202420 Jan 2025 20 Jan 2025 Pramood Kumar Singhal Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
949 40282Work of construction of drain and interlocking tiles in the service line behind the house of H.No. 173 Shri Anand Tyagi, Rajkumar Jain and H.No. 143 Smt. Poonam Tyagi in Ward-09, New Aryanagar. 12.00 10/09/2024 12.00 19 Sep 2024 10 Oct 2024 Modern Const.Co. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
40.00%
950 403123Road improvement work by drain and C.C. in the damaged lane from C-93 to Vaishno Devi temple in ward 10. 26.07 12/09/2024 26.07 19 Sep 202415 Oct 2024 14 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
951 404116Improvement work of damaged street from parking to B1/65 in ward 10 DLF by providing drain and interlocking tiles. 21.72 12/09/2024 21.72 19 Sep 202412 Nov 2024 14 Oct 2024 Tej Const Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
952 405156Ward-11, Nandgram, Krishna Kunj: Z.R.S. Makeover to Verma, Choudhary Sahab's lane through Kapil Tyagi and Hemant Verma lane, Mithlesh's house through Atul's house to Krishna Kunj main road and work of drain and interlocking tiles. 11.07 10/09/2024 11.07 26 Nov 202421 Jan 2025 21 Jan 2025 Zuber Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
953 406146Work of drain and interlocking tiles from Madan Singh to Shiv Mandir park and from Pramod Pandit to Yadav ji's house in Ward-11, Nandagram E-Block. 22.54 10/09/2024 22.54 26 Nov 202407 Jan 2025 07 Jan 2025 S.D. Contr. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
954 407137Construction work of RCC drain from the corner of Buddha Park in Ward-12, Balupura, passing through Hon'ble Councilor's Office and Raju Provision Store to Friends Chemist Ramteeram Road. 14.93 10/09/2024 14.93 26 Nov 202430 Dec 2024 30 Dec 2024 Zuber Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
955 408139Construction work of drain and C.C. road from Shiva's shop to Deepak's house in Jatwada Kanjimal, from Mukesh's house to Udaychand's house, from Satish's house to Srinivas's house, from Jeet's house to Prashant's house via Raman's house, and adjacent to Sushil's house in Kallupura. 13.78 10/09/2024 13.78 26 Nov 202430 Dec 2024 30 Dec 2024 Zuber Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
956 409109Ward-13, Ghukna: Construction work of drain and interlocking tiles from B.N. Thakur to Ajaypal's house via Mahendra Tyagi and Vijay Tyagi's lane and from Kamlesh to Ojha and from Naresh Chandra to Trivedi and from Harbirpal to Ilu Sharma's house and from Dinesh Sharma to Bhatta Road and Surend's lane. 15.78 10/09/2024 15.78 19 Sep 2024 14 Oct 2024 A H Const NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
957 410107Construction work of drain and interlocking tiles in lane no. 8 in ward-13, Ghukna and Brahmapuri from Pankaj to Rajesh Tyagi's house and from Pappu's house to Omi's house, via Atar Singh's house to Mahendra Nai's house and Banwari Dhobi wali lane and from Jaiprakash to Roopchand and from Moolchand Tyagi to Harpal's house. 14.83 10/09/2024 14.83 19 Sep 202428 Nov 2024 14 Oct 2024 Shyama Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
958 411149Construction work of drain and interlocking tiles in Khajur wali gali in ward-13, Ghukna, from Lokesh's house to Shashi Bhushan Tyagi's house and from Rakesh to Vinod and from Ramswaroop to Sunil Panchal and Jaiveer Nayak wali gali and from Umendra Convent School to Narendra's house. 17.73 10/09/2024 17.73 07 Oct 202415 Jan 2025 15 Jan 2025 A.V. Enter. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
959 41261Repair work of damaged road from R-169 to R-109, R-126 to R-118, R-183 to R-200, R-156 to R-134, R-142 to R-135 to R-148 and R-143 in Railway Enclave R-Block in Ward-14 by Dense. 24.13 10/09/2024 24.13 19 Sep 2024 14 Oct 2024 Prateek Enter. SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
960 41352Repair work of damaged road from R-38 to R-48, R-49 to R-55, R-71 to R-66, R-109 to R-96, R-109 to R-54 to R-50 in Railway Enclave R-Block in Ward-14 by Dense. 16.57 10/09/2024 16.57 19 Sep 202415 Oct 2024 14 Oct 2024 RG Buildtech Engg. Ltd. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
961 414126In Ward-15, RCC drain construction work on both sides from Sector 12 Shiv Juice Center via Ambedkar Park to L Block. 25.29 10/09/2024 25.29 26 Nov 202413 Jan 2025 24 Dec 2024 Sidh Const SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
962 41553Road repair work by Dense from Sector 12 Jai Auto Mobile to L Block L-26 in Ward-15. 29.96 10/09/2024 29.96 19 Sep 202415 Oct 2024 14 Oct 2024 RG Buildtech Engg. Ltd. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
963 41686Work of laying interlocking tiles and thermoplastic paint, cat eye on side track from Sector 12 Jai Auto Mobile to L Block L-26 in Ward-15. 14.97 10/09/2024 14.97 19 Sep 2024 14 Oct 2024 Chandra Mohan Singh Raguwanshi SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
964 41786Work of drain and interlocking tiles from Rajpal's house to Chandrapal's house in Ward 16, Sikrod village. 26.63 10/09/2024 26.63 19 Sep 2024 10 Oct 2024 Om Enter. Rajender SinghJunior Engineer MEMBER KOTA 
0%
965 418 Work of drain and interlocking tiles from Pawan Dagar's house to Manveer Fauji's house in Ward 16, Sikrod village. 26.72 08/08/2024 26.72 07 Oct 2024   Rajender SinghJunior Engineer MEMBER KOTA 
0%
966 419116In Ward-17, Sevanagar, from Kuldeep's house to T.K. Dubey via Sandeep, Rajkumar, Harish's houses and from Saroj's house to Madan's house and from Shakuntala to Verma's house and from N.B.T. School to Mittal Hardware, drain and C.C. work. 21.18 10/09/2024 21.18 19 Sep 202415 Oct 2024 14 Oct 2024 Pramood Kumar Singhal Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
967 420105Work of drain and C.C. from Naresh Photographer to Shivendra Kaushik's house via Madan Tyagi and Anil Sharma's house in Ward-17, Seva Nagar. 12.80 10/09/2024 12.80 19 Sep 2024 14 Oct 2024 Shree Balaji Ent. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
70.00%
968 42189Work of drain and interlocking tiles from Virendra Chaudhary's house to Jairam's house in Ward 18, Rajapur. 18.40 10/09/2024 18.40 19 Sep 2024 10 Oct 2024 Sarthak Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
969 422105Work of drain and interlocking tiles in Ward 18, Bagwali Colony, from A-105 to A-223, street A-116, street A-195, from A-225 to Tejpal's house. 14.20 10/09/2024 14.20 19 Sep 202412 Dec 2024 14 Oct 2024 Sarthak Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
970 423152Construction work of interlocking tiles and drain in Ward-19, Patel Nagar Bounjha from the house of Rakesh Sharma via Pammi to Mokam Singh and from Kamal to Krishna and from Vijay Sharma to Ramchand Upadhyay. 16.48 10/09/2024 16.48 07 Oct 202420 Jan 2025 20 Jan 2025 Pramood Kumar Singhal Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
971 4241Work of construction of interlocking tiles and drain in Ward-19, Balmiki Basti from Sinha Property to H.No. K-56 to Maa Kirana Store, from Shekhar to H.No. K-20, from Mukesh to Sunil Parcha, from Vansh to Guptaji, from Radhelal to Pappu Choudhary and till Rajendra Maurya Wali Gali. 13.69 10/09/2024 13.69 28 Nov 202411 Apr 2025 11 Apr 2025 S.D. Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
972 425122Construction work of drain and interlocking tiles in the damaged street from the house of Subis Chandela to the house of Prem Singh in ward 20 Bhaupura. 10.51 12/09/2024 10.51 19 Sep 202412 Dec 2024 14 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
973 426133Construction work of drain and interlocking tiles in the damaged street from Manveer's house to Rajiv's house (street no. 05) in ward 20 Bhaupura. 13.73 12/09/2024 13.73 19 Sep 202414 Oct 2024 14 Oct 2024 A.S. Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
50.00%
974 427132Construction work of drain and interlocking tiles in the damaged street from Indrapal Netaji's house to Janaki's house in Ward 20 Rajiv Colony. 17.75 12/09/2024 17.75 19 Sep 2024 14 Oct 2024 V.S. Buildcon.Co. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
975 428138Construction work of RCC drain and road through CC in KV block in ward 21 from KB-14 to KB-23 via KB-01. 13.80 10/09/2024 13.80 07 Oct 202424 Jan 2025 24 Jan 2025 Mahalaxmi Infra. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
976 429177Construction work of C.C. road and drain from the house of Gajendra Fauji near FCI godown in Ward-22, Rahul Vihar via the house of Vijaypal Choudhary to the house of Dhamendra Kumar Suryavanshi. 11.77 12/09/2024 11.77 07 Oct 202429 Mar 2025 29 Mar 2025 Akriti Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
977 4302Construction work of C.C. road and drain from Naveen Garments to Mama Barf Wala's house in Telmill Wali Gali in Ward-22, Daulatpura. 12.41 26/11/2024 12.41 26 Nov 202426 Apr 2025 26 Apr 2025 Krishna Asso. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
978 431148Construction work of CC road and drain in Ward-22 Sangam Vihar from house no. 33 to Bhajanlal's house, from Rajpal to Pramod's house, from Vedprakash to Ashok Kumar's house and from house no. 52A to K.K. Shukla's house. 13.35 12/09/2024 13.35 26 Nov 202407 Jan 2025 07 Jan 2025 S.D. Contr. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
979 432141Construction of CC road from Yogesh flour mill to Sadak culvert on Ward-23, Kailashnagar main road. 25.14 10/09/2024 25.14 26 Nov 2024 24 Dec 2024 Univershal Vanchar SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
50.00%
980 433otherWork of drain and interlocking tiles from Ambedkar Bhawan to Sanjay Singh's house and from Surendra's house to Ratan's house and from Surendra's house to Subhash's house in Ward 24, Mehrauli Village. 15.87 10/09/2024 15.87 07 Oct 2024 12 Dec 2024 Pream Const. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
70.00%
981 434otherWork of drain and interlocking tiles in Ward 24, Mehrauli Village, from Vinod Pandit's house to Mukesh's house, from Roopchand's house to Ajit's house, Magantram's street, from Nanak's house to Pyarelal's house, from Rampal's house to Ram Singh's house. 12.40 10/09/2024 12.40 07 Oct 2024 12 Dec 2024 Pream Const. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
0.00%
982 435119Work of interlocking tiles on the side track of the road in front of Goyal Gas Agency, Ward - 25. 14.84 10/09/2024 14.84 07 Oct 2024 17 Dec 2024 A.S. Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
983 436119In ward no. 26, Madhopura, from government ration shop to Shani temple, from grocery store to Shri Ram temple, from Shri Ram temple to Gulab Singh, from Shri Ram temple to Ganesh Dutt, from Babulal to Shankar, from Deepak to ice cream factory, from well temple to Chamunda temple, damaged road is repaired by C.C. Road and drain repair work. 17.43 10/09/2024 17.43 19 Sep 2024 24 Dec 2024 A.H Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
984 437124In ward no. 26, Madhopura, from Inder Gurjar to Choudhary Popan Singh to Bhagman Lal, Dola to Rajkumar, Satish to Rajkumar, Neetu to Arun, damaged road is repaired by C.C. Road and drain repair work. 10.57 10/09/2024 10.57 19 Sep 202415 Jan 2025 24 Dec 2024 Jaiveer Singh Contr. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
985 438121In ward no. 26, Madhopura, from Krishna General Store to Jagdish, from Dharampal to Panchayat Bhawan, from Shani Mandir to Jagdish, Kavita Advocate Wali Gali, from Tejpal to Urmila Sadan, from Mukesh to Shani Mandir Railway Line, the damaged road is repaired by C.C. Road and drain repair work. 10.32 10/09/2024 10.32 19 Sep 202426 Dec 2024 24 Dec 2024 A.H Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
986 439116Road improvement work by interlocking tiles on the damaged road from Soni Mahal to Happy, Vinod to Pappu, Pappu to Rajbala, Jamuna to Ganga Ram, Rajkumar to Hoshiyaar Singh in Ward-27, Shanti Nagar. 14.14 10/09/2024 14.14 07 Oct 2024 10 Dec 2024 J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
987 44091Road improvement work by interlocking tiles on the damaged road from Dixit to Mukesh, Deepchand to Vinod, Neetu to Shailesh, Rohit (Tota) to Satveer, Dr. Major to Ram Kuvar in Ward-27, Shanti Nagar. 10.97 03/09/2024 10.97 07 Oct 202413 Dec 2024 10 Dec 2024 Cotack Builders SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
988 441114Road improvement work by interlocking tiles on the damaged road from Keshav Chaudhary to Chanchal Tyagi, Robin Tyagi to Keshav Tyagi, Lilu Tyagi to Nishant, Shriram Cable to Rinku Pal in Ward-27, Sain Vihar. 11.27 10/09/2024 11.27 07 Oct 2024 10 Dec 2024 J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
989 442111Road improvement work by interlocking tiles on the damaged road from Satyapal to Omkar, Shokendra to Pramod Sharma, Pintu to Sheshnath, Babita to Harendra Chaudhary in Ward-27, Shanti Nagar slum. 13.17 10/09/2024 13.17 07 Oct 2024 10 Dec 2024 J.P. Shakti Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
990 443129Construction work of damaged drain from water plant to Qasim's house in Nilmani Colony, Ward No. 28, Rajiv Colony and construction work of interlocking tiles in the damaged street. 16.66 12/09/2024 16.66 19 Sep 202414 Oct 2024 14 Oct 2024 A.S. Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
991 444123Construction work of drain from Meena Bhais Wale to Mahadev's house in Nilmani Colony of Ward 28 Rajiv Colony and laying of interlocking tiles in the damaged street. 11.61 10/09/2024 11.61 19 Sep 202414 Oct 2024 14 Oct 2024 A.S. Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
992 445118Construction work of drain and interlocking tiles in the damaged street from Ashok Mistry's house to Ramesh and Kamlesh's house to Nagendra Chauhan's house in Neelmani Colony, Ward 28, Rajiv Colony. 15.73 12/09/2024 15.73 19 Sep 2024 14 Oct 2024 S.R.S. Buildcon Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
993 446119Construction work of drain and damaged street through C.C. from Seva Ram's house to Kisan Pal's house in ward no. 29, Bhaupura Kuti. 18.96 10/09/2024 18.96 19 Sep 202409 Dec 2024 14 Oct 2024 Anuj kumar Contr. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
994 447121Construction work of drain and damaged street through C.C. from Dr. Bengali's house to Ramesh Chand's house in Ward No. 29, Bhaupura Kuti. 14.68 10/09/2024 14.68 19 Sep 202412 Nov 2024 14 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
995 448124Construction work of drain and damaged street through C.C. from Kisan Pal's house to Dr. Bengali's house in Ward No. 29, Bhaupura Kuti. 16.36 10/09/2024 16.36 19 Sep 202415 Oct 2024 14 Oct 2024 Ujjwal Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
996 449162Work of drain and interlocking tiles from Meenu's house in Ward 30, Sadarpur village, via Vimala Tiwari Academy School to Shiv Temple. 14.89 10/09/2024 14.89 07 Oct 202428 Jan 2025 28 Jan 2025 A.K.G. Const. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
40.00%
997 450161Work of drain and interlocking tiles in Titu wali gali, Dalchand wali gali, from Daulatram's house to Gangaram's house in ward 30, Sadarpur village. 11.32 10/09/2024 11.32 07 Oct 2024 28 Jan 2025 JSS Const. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
60.00%
998 451108Construction work of drain and interlocking tiles in Ward-31, Sihani from Lakhram to Pappu and from Subhash Tyagi to Nandu Tyagi Mode and from Gaurav Tyagi to Naveen Tyagi's house. 17.79 10/09/2024 17.79 19 Sep 2024 14 Oct 2024 Anuj kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
999 452100Construction work of drain and interlocking tiles in Ward-31, Subhash Nagar, from Mahendra to Sauran and from Maya to Kunwarpal and from Bishan Pandit via Vinod Kumar Shah to Munesh Panditji and Akash wali gali and Pankaj to Sanjay wali gali and Pradeep Kumar Tyagi wali gali and Bunty Cyber ​​Cafe wali gali and from Babitpal to Munesh wali gali. 22.77 21/07/2024 22.77 19 Sep 2024 14 Oct 2024 Asutosh Kumar Cont NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
0.00%
1000 453104Construction work of drain and interlocking tiles from Ramkumar Yadav to Sheerpal, Naresh to Sitaram Pandit, Mahavir to Manoj, Pramod to Sundar, Indrapal to Rajpal and Jaisingh to Chotu's house in Ward-32, Harvanshnagar and Bhatta Road. 29.77 10/09/2024 29.77 19 Sep 202407 Mar 2025 14 Oct 2024 Chowdhary Associates Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
1001 454106Construction work of drain and interlocking tiles in Ward-32, Harvanshnagar from Rajpal to Shridevi and Bhagwandas wali gali and Harikrishna wali gali and from Sundar to Suresh and from Navneet to Gauri Shankar temple. 14.10 10/09/2024 14.10 19 Sep 202428 Nov 2024 14 Oct 2024 Shyama Const. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
1002 455161Construction work of CC road and drain from in front of SK Tour & Travel to GT Road in Ward-33, Jagniganj. 13.45 12/09/2024 13.45 07 Oct 202410 Feb 2025 10 Feb 2025 Vinod kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
75.00%
1003 456161Construction work of CC road and drain from Rajkumar to GT Road via Anil in Ward-33, Jagniganj. 13.51 12/09/2024 13.51 07 Oct 202410 Feb 2025 10 Feb 2025 Vinod kumar Contr. NAGENDRA SHARMAJunior Engineer MEMBER KOTAIn Progress
90.00%
1004 457180Repair work of drain and C.C. in damaged lane from GT Road to G 696 in Ward 34 Shahid Nagar Pratham. 15.05 10/09/2024 15.05 07 Oct 202409 Dec 2024 09 Dec 2024 Bijender Singh Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1005 458179Repair work of drain and C.C. in the damaged lane from Sahnawaj's house to Dr. Sarfaraz's house in Ward 34 Shaheednagar Pratham. 10.31 10/09/2024 10.31 07 Oct 202425 Nov 2024 25 Nov 2024 Bijender Singh Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1006 459178Repair work of drain and C.C. in the damaged lane from Khalil's house to Vittu Shuttering's house in Ward 34 Shahid Nagar Pratham. 13.72 10/09/2024 13.72 07 Oct 202425 Nov 2024 25 Nov 2024 Bijender Singh Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1007 460181Construction work of drain and C.C. road in the street from Kamil's house to the bakery in ward 34 Shahidnagar Pratham. 12.32 10/02/2024 12.32 07 Oct 202409 Dec 2024 09 Dec 2024 Bijender Singh Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1008 461101Construction work of damaged lane/road through CC and drain from Bijendra Yadav's house to Savita Raghav's house in Ward-35 Buddhist Vihar Akbarpur Bahrampur. 12.56 10/09/2024 12.56 07 Oct 202411 Feb 2025 10 Dec 2024 Marden Const.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
1009 462100Construction work of damaged lane/road through C.C. and drain in Ward-35 Buddhist Vihar Akbarpur Bahrampur from Bijendra Yadav's house to Ajay Yadav's house, from Vinod Prajapati's house (temple) to Kapil Pandit's house, from Babli Chaudhary's house (Tridev temple) to Amit Master's house. 14.96 10/09/2024 14.96 07 Oct 2024 10 Dec 2024 Marden Const.Co. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
1010 463142Construction work of damaged lane/road through CC and drain from the house of Suraj Balmiki to the house of Kanhaiya Halwai in Ward-35 Buddhist Vihar Akbarpur Bahrampur. 14.96 10/09/2024 14.96 26 Nov 2024 24 Dec 2024 R.C. Contr. SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
40.00%
1011 464115Construction work of RCC drain from Sector 16 Market to Mother Dairy in Ward 36 Sector 16 Vasundhara. 14.93 10/09/2024 14.93 07 Oct 202416 Dec 2024 16 Dec 2024 S.G. Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1012 465127Construction work of drain, interlocking tiles and C.C. from Babli Chauhan's house to Salim Bhai's property in Ward 37, Shalimar Garden. 13.10 12/09/2024 13.10 19 Sep 2024 14 Oct 2024 A.S. Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
10.00%
1013 466130Construction work of drain and interlocking tiles from Babli B 150 to B 181 in Ward 37, Shalimar Garden. 13.28 12/09/2024 13.28 19 Sep 202414 Oct 2024 14 Oct 2024 A.S. Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
10.00%
1014 467126Work of drain and interlocking tiles in the damaged street from Rohila's house to Pappu's house and from Narendra's house to Panchal's house in Ramnagar, Ward 38, Arthala. 11.30 10/09/2024 11.30 19 Sep 2024 14 Oct 2024 A.S. Const. Vinod KumarJunior Engineer MEMBER KOTACompleted
100%
1015 468125Work of drain and interlocking tiles in the damaged street in Ramnagar, Ward 38, Arthala, from Rajendra Bharti's house to Vinod Kashyap's house and from Rajendra to Dr. Sharif and from Chauhan's house to Devendra's house. 11.76 10/09/2024 11.76 19 Sep 2024 14 Oct 2024 A.S. Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
80.00%
1016 469143Work of drain and interlocking tiles in the damaged street from Bharpai's house to Bhagmal's house and from Bhagmal to Vijay, Ramu and Dinesh's street in Ramnagar, Ward 38, Arthala. 12.10 10/09/2024 12.10 19 Sep 2024 14 Oct 2024 V.S. Buildcon.Co. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
65.00%
1017 470131Work of drain and interlocking tiles in the damaged street from Shambhu Dayal's house to Yadav's house in Ramnagar of ward 38, Arthala and in Mohit's, Kanti Devi's, Kamal Sharma's and Sanjay's streets. 11.29 10/09/2024 11.29 19 Sep 2024 14 Oct 2024 V.S. Buildcon.Co. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
85.00%
1018 471166Road improvement work by Dense on the road in front of house no. H/45, 48, 187 and house no. H/190 from Amba Store in Ward-39, Nehrunagar Third H Block. 12.81 12/09/2024 12.81 07 Oct 2024 20 Feb 2025 Prateek Enter. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
1019 472149Construction work of RCC drain and interlocking tiles from Shyam Singh's house to Rudra Kumar's house (Dhara Wali Gali) in Ward-40 Sahibabad village. 13.94 10/09/2024 13.94 21 Oct 202424 Feb 2025 24 Feb 2025 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1020 473154Construction work of RCC drain and interlocking tiles from Dhara Bhawan to V.N. Yadav's house (Dhara Wali Gali) in Ward-40 Sahibabad village. 11.44 10/09/2024 11.44 21 Oct 202405 Mar 2025 05 Mar 2025 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1021 47461Construction work of RCC drain and interlocking tiles from Vishal Hardware to Amar Dental Care in lane no. 2 in ward-41 Jhandapur. 11.86 10/09/2024 11.86 19 Sep 202416 Dec 2024 14 Oct 2024 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1022 47562Construction work of RCC drain and interlocking tiles in lane no. 2 in ward-41 Jhandapur from Bansal General Store to Ambedkar Park and from Hanuman Mandir to Gyani Chak. 13.26 10/09/2024 13.26 19 Sep 202429 Jan 2025 14 Oct 2024 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1023 476 Construction work of C.C. road from public toilet to Akash Tyagi Mobile Care in Ward-41 Maharajpur. 12.75 21/07/2024 12.75 19 Sep 2024   POOJA SINGHJunior Engineer MEMBER KOTA 
0%
1024 47769Construction work of C.C. road from S.S. Network to Pal Stationery & Sports and up to house no. 62 in Ward-41 Maharajpur. 11.01 10/09/2024 11.01 19 Sep 2024 14 Oct 2024 V.K. Contr. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
1025 478109Work of drain and interlocking tiles from Ramu Chowk to Mahesh Yadav's house in Ward 42, Bamheta village. 14.05 10/09/2024 14.05 19 Sep 202402 Dec 2024 14 Oct 2024 Keshram Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1026 479112Work of drain and interlocking tiles from the house of Brahmadutt Yadav to the house of Anil Journalist in Ward 42, Bamheta village. 16.21 10/09/2024 16.21 19 Sep 202428 Nov 2024 14 Oct 2024 Keshram Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1027 480113Work of drain and interlocking tiles from Baniya Ke Bagh/Rajesh's shop to Devendra's house in Ward 42, Bamheta village. 24.92 10/09/2024 24.92 19 Sep 202402 Dec 2024 14 Oct 2024 Keshram Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1028 481153Construction work of RCC drain and CC road from Gaurav General Store to house no. 1282 and from house no. 1282 to Dharamveer's house, from Dharamveer to Umarpal, from Umarpal to Kilni's house and from R.K. Memorial School to house no. 1108 in Ward-43, Kadkad village. 10.71 10/09/2024 10.71 07 Oct 202428 Apr 2025 05 Mar 2025 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1029 482140Construction work of RCC drain and CC road from Bhisam to Prempal and from Prempal to house no. 1067 and from 1067 to Balwant's house and from house no. 1051 to 1046 in ward-43, Kadkad village. 14.89 10/09/2024 14.89 07 Oct 202429 Jan 2025 29 Jan 2025 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1030 483155Construction work of RCC drain and CC road from house no. 732 to 748 from Umrao Singh's house to house no. 772 in ward-43, Kadkad village. 14.16 10/09/2024 14.16 07 Oct 202405 Mar 2024 05 Mar 2025 Maa Padhmawati Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1031 484 Work of drain and interlocking tiles in the damaged street from Vijay Dhobi's house to Shailendra's house in Chitrakoot Colony, Sanjay Colony, Ward 44. 14.66 10/08/2024 14.66 09 Oct 2024  V.S. Buildcon.Co. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
15.00%
1032 485135Work of drain and interlocking tiles in the damaged street from Dhaniram's house to Monu's house in Chitrakoot Colony, Ward 44, Sanjay Colony. 11.08 10/09/2024 11.08 19 Sep 2024 14 Oct 2024 V.S. Buildcon.Co. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
1033 486200Repair work of drain and C.C. in the damaged lane from Sonu's house to Habib and to the house of Hind Public School in ward 44 Sanjay Colony. 10.25 10/09/2024 10.25 21 Oct 202415 Mar 2025 15 Mar 2025 JSS Const. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1034 487201Repair work of drain and C.C. in the damaged lane from Raja's house to S.P. Bhati and from Krishna Kumar Gupta's house to Anwari's house in Ward 44 Sanjay Colony. 11.15 10/09/2024 11.15 21 Oct 2024 24 Mar 2025 Aasma Const. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
1035 488134Construction work of interlocking tiles in the drain and damaged street from Rajwala Sharma's house to Kamala's house in Krishna Gaushala in Ward 45, Karhaida. 12.26 12/09/2024 12.26 19 Sep 2024 14 Oct 2024 V.S. Buildcon.Co. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
1036 489142Construction work of interlocking tiles in the drain and damaged street from Kamala's house to Sone Lal's house in Krishna Gaushala in Ward 45, Karhaida. 10.20 12/09/2024 10.20 19 Sep 2024 14 Oct 2024 Marden Engg. Asso. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
1037 490165Construction work by interlocking tiles in the drain and damaged street from Brijpal Singh's house to Vinod's house in Ward 45, Karhaida. 19.25 12/09/2024 19.25 19 Sep 202415 Oct 2024 15 Oct 2024 V.S. Buildcon.Co. Vinod KumarJunior Engineer MEMBER KOTAIn Progress
0.00%
1038 491103Work of drain and interlocking tiles in Ward 46, Garden Enclave from Rituraj's house to Mukesh's house, from Sonu Chaudhary's house to Omvati's house, from Manmohan flour mill to Ashok's house, from Mukesh's house to Santosh's house, from Santosh's house to Subhash's house. 29.05 10/09/2024 29.05 19 Sep 2024 14 Oct 2024 Marden Engg. Asso. Rajender SinghJunior Engineer MEMBER KOTAIn Progress
50.00%
1039 492110Road improvement work by DANS from SC-317 to SC-334 and SC-24 to SC-12 in Ward 47, Shastri Nagar C-Block. 10.89 10/09/2024 10.89 19 Sep 2024 14 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1040 493108Road improvement work by Danes in Ward 47, Shastri Nagar F-Block from SF-20 to SF-120, SF-120 to 116, in front of market, from SF-76 to SF-143, SF-153 to SF-166, SE-99A, 99B, 99C. 21.61 10/09/2024 21.61 19 Sep 202415 Oct 2024 14 Oct 2024 RG Buildtech Engg. Ltd. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1041 49487Road repair work through C.C. on the damaged road from Ali Mohammad to Dasna Wale Doctor in Ward-48, Sector-12, Mirzapur. 12.36 10/09/2024 12.36 19 Sep 202427 Dec 2024 14 Oct 2024 Mahima Const. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1042 49599Construction work of interlocking tiles and drain from Gurudwara to C/90 near Electricity House in C Block, Nandgram, from Neeraj Medical to C/72 and from F/380 to F/372 in F Block. 12.15 10/09/2024 12.15 19 Sep 2024 14 Oct 2024 Asutosh Kumar Cont Preeti BansalJunior Engineer MEMBER KOTAIn Progress
90.00%
1043 49692Construction work of interlocking tiles and drain from Rishi Kirana Store C/812 near Shiva Temple in Ward-49 Nandgram C Block. 21.75 10/09/2024 21.75 19 Sep 202428 Nov 2024 14 Oct 2024 Rishu Const Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
1044 497128Work of drain and C.C. road from Rakesh Tyagi to Ravindra Tyagi and from Subodh Tyagi to Vinod and Neeraj Tyagi and from Amarnath Tyagi to Sushil Tyagi and Surendra Tyagi to Neeraj Tyagi in Ward-50, Sadik Nagar. 10.38 10/09/2024 10.38 19 Sep 202418 Mar 2025 14 Oct 2024 Balaji Const.Co. Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
1045 49891In Ward-50, Sadik Nagar, from Satish Chandra's house to Sachin's house and from Deepchand's house to Mahesh Sharma's house via R.K. Sharma, drain and C.C. road work. 10.09 10/09/2024 10.09 19 Sep 2024 14 Oct 2024 Shyama Const. Preeti BansalJunior Engineer MEMBER KOTAIn Progress
0.00%
1046 49986Construction work of drain and C.C. road from Tejveer Tyagi's house to Keshav Tyagi via Anil Tyagi's house in Ward-50, Saddik Nagar and from Bijendra Kumar Tyagi to Tikaram Prajapati. 16.88 10/09/2024 16.88 19 Sep 2024 14 Oct 2024 Juber Const Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
1047 50084Road improvement work by Danes in the internal lanes of Gate No. 09 in Ward-51, G Block. 29.90 10/09/2024 29.90 19 Sep 2024 14 Oct 2024 Prateek Enter. SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
1048 50185Road improvement work by Danes in the internal lanes of Gate No. 10 in Ward-51, G Block. 29.99 10/09/2024 29.99 19 Sep 2024 14 Oct 2024 Prateek Enter. SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
0.00%
1049 502168Work of construction of CC road and drain repair from house no. B/237 to B/347 in Ward-52, Panchvati B Block. 12.02 12/09/2024 12.02 19 Sep 202425 Feb 2025 25 Feb 2025 Shree Radhya Const. NAGENDRA SHARMAJunior Engineer MEMBER KOTACompleted
100%
1050 503102Work of drain and interlocking tiles from Bake Lal's house to Ravi Pal's house in Ward 53, Raispur. 10.34 10/09/2024 10.34 19 Sep 202413 Dec 2024 14 Oct 2024 Vinod kumar Contr. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1051 504121Construction work of CC road from house no. 801 to house no. 773/3 and from house no. 773/3 to the corner of our park in Sadbhavna Society, ward-54. 13.39 10/09/2024 13.39 07 Oct 202416 Dec 2024 16 Dec 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1052 505124Construction work of C.C. road from house no. 820 to Shahbeen clinic in Sadbhavna society in ward-54 and on society park road. 13.02 10/09/2024 13.02 07 Oct 202416 Dec 2024 16 Feb 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1053 50667Repair work of damaged road from house 0-5/798 to Children's Park in Ward-54 Vasundhara Sector-05 by Dense. 14.97 10/09/2024 14.97 19 Sep 202422 Nov 2024 14 Oct 2024 Prateek Enter. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1054 50788Construction work of interlinking tiles road in house no. 393 to 435, 467 to corner of park and from 392 (Prince Property) to 535 (Krishna Park) in ward-55, D block. 19.74 10/09/2024 19.74 19 Sep 2024 14 Oct 2024 S G Enterprises SHIV KUMAR SAROJJunior Engineer MEMBER KOTAIn Progress
30.00%
1055 508100Road improvement work by DANS in Ward 56, Chiranjiv Vihar Sector-05 from 05/29 to 05/49. 10.47 10/09/2024 10.47 19 Sep 2024 14 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1056 509114Road improvement work by Dans from AE-59 to AE-64, AE-65 to AE-74, AE-49 to AE-31 in Ward 56, Avantika I. 14.93 10/09/2024 14.93 19 Sep 202430 Dec 2024 14 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1057 510116Road improvement work by DANS from CC-05 to CC-01/16 and CC-01/06 to CC-01/11 and CB-27 to CC-01/20 in Ward 56, Avantika Pratham. 19.33 10/09/2024 19.33 19 Sep 2024 15 Oct 2024 Prateek Enter. Rajender SinghJunior Engineer MEMBER KOTACompleted
100%
1058 51183Improvement work through drain and interlocking tiles from Subodh Tyagi to Likheram Tyagi and from Narendra Tyagi to water tank and from Subhash Tyagi to Rajkishore and from Rajkishore to Brajkishore in ward-57 Makanpur. 13.68 10/09/2024 13.68 19 Sep 202406 Nov 2024 15 Oct 2024 Shri Balaji Enter. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
1059 51264In ward-57 Makanpur, from Devendra Tyagi to Surendra Tyagi, from Vinod Tyagi to Mangu Tyagi and from Devendra Tyagi to Rame and till Bijendra Tyagi, road improvement work through drain and C.C. 14.47 10/09/2024 14.47 19 Sep 202406 Nov 2024 14 Oct 2024 Shri Balaji Enter. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
1060 513100Road improvement work through drain and CC from Devendra Gupta to Satyapal Tyagi and from Devendra to Jaiveer in ward-57 Makanpur. 13.04 10/09/2024 13.04 19 Sep 202411 Nov 2024 15 Oct 2024 Shri Balaji Enter. POOJA SINGHJunior Engineer MEMBER KOTACompleted
100%
1061 514136In ward 58 Mawai, the damaged road from Devdutt Sharma to Kuldeep Sharma, Amarnath to Sunita Panchal, Babulal to Raj Bahadur and Shri Chhote Lal to Mangeram Tyagi was repaired using C.C. 11.91 10/09/2024 11.91 26 Nov 2024 24 Dec 2024 Pardhan Const. SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
1062 515127Road repair work through C.C. on damaged road from H.No. A-22 to A-543, A-543 to Sarvesh, A-587 to A-591, A-557 to A-583 in Ward-58, Mawai. 11.79 10/09/2024 11.79 26 Nov 202403 Jan 2025 24 Dec 2024 Nirban Infra SHIV KUMAR SAROJJunior Engineer MEMBER KOTACompleted
100%
1063 51687Ward - 59, Old City Chandrapuri, near Shalimar Paints, Rajkumar and Rajbir, near Choudhary Chai Wala, Navyug Market, near State Bank and near stationery shop, work of drain repair and interlocking tiles on side track at various places. 14.56 12/09/2024 14.56 19 Sep 2024 14 Oct 2024 Madan Const Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
1064 51795Ward-59, Purana Shahar Gate Wali Gali, from Sumit's house to Anant Sharma's house via Lavkush's house and in Pandit ji's lane, C.C. road and drain construction work. 10.80 12/09/2024 10.80 19 Sep 2024 14 Oct 2024 Navdha Const Preeti BansalJunior Engineer MEMBER KOTAIn Progress
60.00%
1065 518126Ward-59, Old City, Old Munsfi Bazaar, from Balaji Packing to Jaimata Trading, Amarpali Saree Center, Hindon Tailors via Guruji Enterprises and near the mosque, work of drain and CC road and interlocking tiles. 12.65 12/09/2024 12.65 19 Sep 2024 14 Oct 2024 Navdha Const Preeti BansalJunior Engineer MEMBER KOTACompleted
100%
1066 51990Ward-59, Old City, near the clock tower in the old Munsfi market, from Bhavani Kambal to Rajendra Box Wala and in the lanes of Balaji, Pinky and Jai Bhagwan and Jai Banke Bihari, construction work of drain and C.C. road. 12.88 12/09/2024 12.88 19 Sep 2024 14 Oct 2024 Madan Const Preeti BansalJunior Engineer MEMBER KOTAIn Progress
10.00%
1067 520123Repair work of damaged road from A 158 to 170 and 132 to 144 in ward 61 sector 10 by Dense. 14.68 10/09/2024 14.68 07 Oct 202416 Dec 2024 16 Dec 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
Fund Name: NIGAM NIDHI 2024-25
1068 521116Repair work of damaged road from A 44 to 220 in Ward 61 Sec 10 by Dense. 14.96 10/09/2024 14.96 07 Oct 202416 Dec 2024 16 Dec 2024 R.G. Builtach Engg. Ltd. Sanjay GangwarJunior Engineer MEMBER KOTACompleted
100%
1069 707174Construction work of interlocking tiles road and drain near Shani temple in Ramanujam Yadav market on Ramteeram Road, Ward-88. 1.72 07/12/2024 1.72 26 Dec 202418 Mar 2025 18 Mar 2025 A.P Const. NAGENDRA SHARMAJunior Engineer NIGAM NIDHI 2024-25Completed
100%
1070 708170Thermoplastic paint and cat eye work in city zone from Chaudhari mode to Daulatpura flyover, from Rakesh Marg to Shani Mandir, Dudheshwarnath Mandir and at various intersections on Patel Marg. 7.71 07/12/2024 7.71 31 Jan 202501 Mar 2025 01 Mar 2025 A.K.&Asso. Preeti BansalJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
1071 709173Thermoplastic paint and cat eye work at various intersections in City Zone from Thakurdwara to Meerut Tiraha, Nandgram Mode to Sihani Chungi, Sihani Police Chowki to Kalkagarhi via Aryanagar Square and Rajnagar Express. 8.98 07/12/2024 8.98 31 Jan 202517 Mar 2025 17 Mar 2025 Trinetra Infra Preeti BansalJunior Engineer NIGAM NIDHI 2024-25In Progress
0.00%
Fund Name: MEMBER KOTA
1072 710194Work of raw site track interlocking tiles in front of Buddha Park and in front of the houses in front of 6/1 and 6/136 in Ward-86, Rajendra Nagar Sector-05. 8.16 09/09/2024 8.16 31 Jan 202520 Feb 2025 20 Feb 2025 Solanki Const. Sanjay GangwarJunior Engineer NIGAM NIDHI 2024-25Completed
100%
1073 557156Road improvement work by CC from D 92 to D 113 in D Block of Ward 75, Lajpat Nagar and improvement work of RCC drain and CC road from D 184 to D 21. 29.85 12/09/2024 29.85 19 Sep 2024 15 Oct 2024 Univershal Vanchar Vinod KumarJunior Engineer MEMBER KOTAIn Progress
10.00%

.
.