| Fund Name: NIGAM NIDHI 2024-25 |
| SRNO | WORK ID | WORK ORDER NO | WORK NAME | ESTIMATE COST & DATE | TENDER AMOUNT & DATE | AGREEMENT DATE & ACTUAL WORK START DATE | TARGET DATE OF WORK COMPLETION | CONTRACTOR NAME & PHONE NO. | ENG. NAME AND PHONE NO | FUND NAME | STATUS | Work Progress | Work Before Start | Work In-Progress | Work After Compelition |
| Fund Name: Awasthapna |
|
1
| 713 | 178 | Ward - 46 Mansi Vihar Road improvement by Dense from H.No. 159 to 151 via H.No. 144 and from H.No. 218 to 210 via H.No. 204. | 16.44 20/02/2024 | 16.44 31 Jan 2024 | 31 Jan 2025 31 Jan 2025 | | R.G. Builtach Engg. Ltd. | Rajender SinghJunior Engineer | NIGAM NIDHI 2024-25 | Completed |
|
|
|
|
|
2
| 1111 | 90 | Construction of Government Ayurvedic/Unani Hospital. | 60.00 23/10/2023 | 60.00 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | | Sanjay Gangwar 8178016821 Junior Engineer | Awasthapna | Completed |
|
|
|
|
|
3
| 1112 | 88 | Construction work of storm drain for water drainage for external development work under Pradhan Mantri Awas Yojana in Rajnagar Extension area. | 539.00 23/10/2023 | 539.00 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Sunil Garg & Co. | Preeti BansalJunior Engineer | Awasthapna | In Progress |
|
|
|
|
| Fund Name: 15th Finance Commission(SWM) |
|
4
| 1113 | 71 | Construction work of drain for water drainage of Ward 51, Pratap Nagar Prime Minister Housing Scheme. | 58.20 22/09/2023 | 58.20 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | A.H. Cons. | SHIV KUMAR SAROJJunior Engineer | Awasthapna | Completed |
|
|
|
|
|
5
| 1114 | 75 | Construction of drain by RCC from IMS College to Road No. 04 big drain in Ward 24, Bulandshahr Road Indian Area. | 557.09 23/09/2023 | 557.09 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | DKS Infra India Pvt. Ltd. | Rajender SinghJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
6
| 1115 | 68 | Construction work of RCC drain for the damaged drain from Ward-68, Brijvihar Sai Prayas Medical Centre to D-349 and from Sri Durga Temple to Balbharati School. | 147.79 22/09/2023 | 147.79 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | Zuber Cons. | POOJA SINGHJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
7
| 1116 | 66 | Ward-78, Shalimar Garden Main, on 80 feet road from plot no. 41 to 790, construction work of residual drain and RCC drain construction work on both sides of the road from 80 feet road to Bikaner Sweets. | 228.50 22/09/2023 | 228.50 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | | Vinod Kumar 8650930015 Junior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
8
| 1117 | 74 | Construction of RCC drain in Ward - 59, Old City Navyug Market from Morena Gajak Shop via Ambedkar Park to GDA culvert/Atlas Cycle Shop and from Police Chowki (Allahabad Bank) to Remains Showroom. | 148.71 23/09/2023 | 148.71 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | Madan Cons. | Preeti BansalJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
9
| 1118 | 72 | Ward-67 Sanjaynagar: Construction work of damaged drain at various places from State Bank of India to Fortune Hotel via Yashoda Hospital. | 105.00 22/09/2023 | 105.00 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | Kotak Builders | Rajender SinghJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
10
| 1119 | 73 | Under Vasundhara Zone, RCC drain construction work from Sec-10 crossing the road near water tank through Sec-11 to Canal Service Road and from Mahavir Chowk to Canal Service Road, Parshuram Chowk to Canal Service Road and from Atal Chowk to Gurudwara Marg. | 467.43 23/09/2023 | 467.43 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | Shreeji Infra. Project Pvt.Ltd | POOJA SINGHJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
11
| 1120 | 69 | Construction of RCC drain from Marshall Palace to NH-9 in Ward 24 Kavi Nagar. | 82.50 22/09/2023 | 82.50 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | Kotak Builders | Rajender SinghJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
12
| 1121 | 69 | Construction of drain by RCC from Rose Valley Public School to Mangat Gurjar's house in Ward No. 1, Christian Nagar Bagu, under Vijayanagar Zone. | 31.56 23/09/2023 | 31.56 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | Keshram Cons. | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
13
| 1122 | 70 | Ward-55: Construction of RCC drain from Kuti Mandir to Krishna Park via Garhwali Park. | 36.96 23/09/2023 | 36.96 13 Oct 2023 | 02 Dec 2023 02 Dec 2023 | | Keshram Cons. | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
14
| 1123 | 67 | Construction of residual drains in WAD-72 Kaushambi. | 63.00 22/09/2023 | 63.00 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | north india developers | POOJA SINGHJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
| Fund Name: 15th Finance Commission(AQI/NCAP) |
|
15
| 1124 | 70 | Ward-25 South Site GT Industrial Area: Construction of drain work by RCC from Balaji Traders to Carbon Factory big drain. | 112.75 22/09/2023 | 112.75 12 Oct 2023 | 01 Dec 2023 01 Dec 2023 | | Zuber Cons. | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(SWM) | Completed |
|
|
|
|
|
16
| 1125 | 82 | Road improvement work by Danes on Rakesh Marg from Shani Mandir to GT Road. | 98.80 03/10/2023 | 98.80 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Aspiration Kansa. | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
17
| 1126 | 76 | Road repair work by Dense from Kalkagarhi Chowk to the top of the bridge via Holy Child Square. | 51.74 03/10/2023 | 51.74 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | King Cons | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
18
| 1127 | 81 | Ward-59, from Navyug Market GDA Corner via Siddharth School to Durga Bhabhi Chowk to the corner of Hapur Road Valmiki Park and the road in front of Udupi Hotel and road near Bank of India behind Ambedkar Park by Danes. | 167.00 03/10/2023 | 167.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | DKS Infra India Pvt. Ltd. | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
19
| 1128 | 64 | Improvement work of the main road from Kanavani culvert to Gurjar Chowk via Buddha Chowk under Vasundhara Zone. | 46.47 20/09/2023 | 46.47 10 Oct 2023 | 29 Nov 2023 29 Nov 2023 | | G.M. Cons. | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
20
| 1129 | 91 | Improvement work of main road from Bridge Vihar Road to Municipal Corporation Public Service Centre and Shanti Marg, Maharana Pratap Marg and from Delhi Border to near railway line in Ramprastha and Chandra Nagar under Vasundhara Zone. | 70.00 23/10/2023 | 70.00 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Shreeji Infra. Project Pvt.Ltd | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
21
| 1130 | 65 | Road improvement work through C.C. on the damaged road from Navjeevan Hospital to H.No. 8/198 Shiv Mandir in Block 8, Ward-80, Rajendra Nagar. | 48.48 20/09/2023 | 48.48 10 Oct 2023 | 29 Nov 2023 29 Nov 2023 | | Star Enterprises | Vinod KumarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
22
| 1131 | 93 | Repair work of damaged road from Gol Park to Shanti Chowk in Ward-80 and 83 Rajendra Nagar by Dense. | 55.29 23/10/2023 | 55.29 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | G.M. Cons. | Vinod KumarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
23
| 1132 | 78 | Road construction work from NH-09 to Municipal Corporation Girls Inter College in Ward 24, Mehrauli. | 59.83 03/10/2023 | 59.83 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Modern Engg. Assoc. | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
24
| 1141 | 86 | Ward-24: Road widening work from Diamond Flyover to NH-9. | 488.00 23/10/2023 | 488.00 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Shantanu Kans. | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
25
| 1142 | 51 | Road construction work from NH-09 to Tigri roundabout under Vijaynagar zone. | 309.96 01/09/2023 | 309.96 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
26
| 1143 | 52 | Repair work of damaged roads of Ward-54 Sector-03 by Danes. | 217.98 01/09/2023 | 217.98 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
27
| 1144 | 53 | Repair work of damaged road of Sunday Market in Ward-73 Shalimar Garden Ex-II by Dense. | 37.11 01/09/2023 | 37.11 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Kamlesh Engg. | Vinod KumarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
28
| 1145 | 54 | Ward-54 Vasundhara Sector-01 LIG and MIG Colony, all roads and road between LIG and MIG will be improved by Danes. | 150.00 01/09/2023 | 150.00 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
29
| 1146 | 55 | Resurfacing work in Ward-62 Govindpuram J-Block (from Maruti Washing Center to Temple, from J-127 to J-49, from J-65 to J-29, from J-09 to Park Corner, from J-87 to Park Side) | 267.90 01/09/2023 | 267.90 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
30
| 1147 | 56 | Construction work of internal road from Holy Heart School to Chowk in Ward-58 A-Block, Sector-09, Mawai Vijayanagar. | 68.95 01/09/2023 | 68.95 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | north india developers | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
31
| 1148 | 57 | Road improvement work by Danes from the road in front of Ward-14 and 58 Zonal Office and from Vikas Khari's house to B-49 and B-27 Singh House to B-34 and A-103 Charan Singh Sharma and E-160 to E-163 via Raju wali gali till E-177. | 29.97 01/09/2023 | 29.97 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Kamlesh Engg. | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
32
| 1149 | 58 | Work of resurfacing of service road from KD 16 to KD-01 in Ward-91 Kavi Nagar. | 48.14 01/09/2023 | 48.14 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Prateek Enterprises | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
33
| 1150 | 59 | Resurfacing work from Hapur Road to St. Mary's Convent School in Ward-47 Shastri Nagar. | 21.87 01/09/2023 | 21.87 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Prateek Enterprises | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
34
| 1151 | 60 | Resurfacing work in Ward-56 Avantika from Gate No. 01 through DD-162 to DD-208. | 45.77 01/09/2023 | 45.77 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Prateek Enterprises | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
35
| 1152 | 92 | In Ward-80 Rajendra Nagar, from Bazirbad Road to Ekta Park and from 150 Feet Road to S.M. World Square, the work of resurfacing the damaged road. | 72.16 23/10/2023 | 72.16 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Modern Engg. Assoc. | Vinod KumarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
36
| 1153 | 61 | In ward-61, repair work of the damaged roads in front of Subhash Park and the main road between 4B and 4C and the road behind Mewar Institute and next to 4A Kamna. | 101.95 01/09/2023 | 101.95 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Shreeji Infraproject Pvt.Ltd | Sanjay GangwarJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
37
| 1154 | 62 | Repair work of various damaged roads of Ward-15 H-Block by DANS. | 46.12 01/09/2023 | 46.12 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | Prateek Enterprises | SHIV KUMAR SAROJJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
| Fund Name: Awasthapna |
|
38
| 1155 | 63 | Construction work of approach road of dumping ground near the pipeline in Kavinagar zone. | 140.00 01/09/2023 | 140.00 21 Sep 2023 | 10 Nov 2023 10 Nov 2023 | | A.K. Cons. | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
| Fund Name: Smart City |
|
39
| 1157 | 94 | Work of constructing a command control center in the municipal corporation headquarters. | 277.97 06/01/2024 | 277.97 26 Jan 2024 | 16 Mar 2024 16 Mar 2024 | | Arun Cons.Co. | Preeti BansalJunior Engineer | Awasthapna | In Progress |
|
|
|
|
|
40
| 1265 | 308/GM(N-9)/E-Tender/2024 | Work on the Senior Care Center project. | 178.00 11/08/2023 | 178.00 01 Dec 2023 | 23 Jan 2024 23 Jan 2024 | | M/s Prem Ganga Associates, Kanpur | Jitendra JauhariJunior Engineer | Smart City | Completed |
|
|
|
|
|
41
| 1266 | 113/GM(N-9)/E-Tender/2024 | Construction of a Zonal Facility Center under the Vijaynagar Zone of the Ghaziabad Municipal Corporation. | 697.00 07/08/2023 | 533.00 11 Dec 2023 | 05 Jan 2024 23 Feb 2024 | | M/s Lakshya Deep Infrastructure, Ghaziabad | Jitendra JauhariJunior Engineer | Smart City | In Progress |
|
|
|
|
|
42
| 1269 | 35G | Work to convert Composite School Madhuban Bapudham into Abhyudaya Composite School. | 172.00 25/03/2023 | 165.51 01 Jul 2023 | 02 Sep 2023 02 Sep 2023 | 31 Jan 2025 | | Rajender Singh 8178016904 Junior Engineer | Smart City | Completed |
|
View
|
View
|
View
|
|
43
| 1270 | 36g | Work to convert Composite School Noornagar Sehani into Abhyudaya Composite School. | 164.00 24/03/2023 | 146.10 01 Jul 2023 | 02 Sep 2023 02 Sep 2023 | 30 Sep 2024 | | Preeti Bansal 8433403327 Junior Engineer | Smart City | Completed |
|
View
|
View
|
View
|
|
44
| 1271 | 9s | Work on the installation of the Surya Namaskar Statue. | 24.95 27/03/2025 | 24.00 23 May 2023 | 24 Jul 2023 24 Jul 2023 | 24 Jul 2023 | | POOJA SINGH 8178016909 Junior Engineer | Smart City | Completed |
|
View
|
View
|
View
|
|
45
| 1273 | 7 | Installation of ITMS (Intelligent Traffic Management System) integrated traffic signals. | 8575.00 12/08/2023 | 8575.00 20 Feb 2024 | 29 Jan 2025 29 Jan 2025 | 28 Oct 2025 | | All JE 0000000000 Junior Engineer | Smart City | In Progress |
|
View
|
View
|
|
|
46
| 1276 | 3 | Design & Implementation of Integrated Command & Control Centre | 247.00 30/10/2024 | 247.00 30 Jan 2024 | 17 Apr 2025 17 Apr 2025 | | Efkon India Pvt Ltd | All JEJunior Engineer | Smart City | In Progress |
|
|
|
|
| Fund Name: BOARD FUND |
|
47
| 1277 | 5 | Integration of CCTV cameras with the Control Center under the Safe City project in Ghaziabad city. | 668.00 25/12/2023 | 668.00 22 Nov 2023 | 04 Mar 2024 04 Mar 2024 | 31 Jan 2025 | | All JE 0000000000 Junior Engineer | Smart City | In Progress |
|
|
View
|
|
| Fund Name: 15th Finance Commission(AQI/NCAP) |
|
48
| 1444 | 511687768914708 | गाजियाबाद नगर निगम के जोनल कार्यालयों, निगम द्वारा संचालित विद्यालयों, नगर निगम मुख्यालय के विभिन्न विभागो में कम्प्यूटर सिस्टम, प्रिन्टर, को-बोर्ड, माउस, पैन ड्राईव आदि सामग्री जेम पोर्टल द्वारा क्रय किये जाने का कार्य। | 8.31 21/12/2023 | 8.29 21 Dec 2023 | 23 Aug 2024 23 Aug 2024 | 07 Sep 2024 | OTHER | SUNIL KUMAR MAURYA 8707646842 Junior Engineer | BOARD FUND | Completed |
|
|
|
|
|
49
| 1133 | 87 | Road widening and divider work for smooth traffic near Ward No. 65, Nasirpur Gate. | 56.83 23/10/2023 | 56.83 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Aspiration Kansa. | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
50
| 1134 | 77 | Resurfacing work from Pink Toilet to Hint Chowk in Ward 84, RDC. | 63.54 03/10/2023 | 63.54 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | RG Buildtech Engg.Ltd | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
51
| 1135 | 89 | Construction work of RCC drain in the remaining part of CC road from Gajji Hotel in Ward-41, Jhandapur Main Market via Ambedkar Park to Gyani Chowk via No. 02 market to Bahar Main Road. | 65.14 23/10/2023 | 65.14 12 Nov 2023 | 01 Jan 2024 01 Jan 2024 | | Mahalaxmi Infra. | POOJA SINGHJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
52
| 1136 | 83 | Road improvement work by patch and Dense from C-04 to GDA Market in Ward-69, C-Block under City Zone. | 35.00 03/10/2023 | 35.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Arun Cons.Co. | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
53
| 1137 | 80 | Road construction work by DANS from Meerut Road to Sihani Garbage Factory under City Zone. | 106.00 03/10/2023 | 106.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Raja Kantra0 | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
54
| 1138 | 85 | Resurfacing work from Diamond Tiraha to Vivekanand Nagar Tiraha in Kavi Nagar Zone. | 112.92 03/10/2023 | 112.92 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | RG Buildtech Engg.Ltd | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
55
| 1139 | 79 | Road improvement work by DENSE on Ward-84 Rajnagar Sector-14,13,11,09,06,03 main roads. | 160.00 03/10/2023 | 160.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | RG Buildtech Engg.Ltd | Rajender SinghJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|
|
56
| 1140 | 84 | Road improvement work from Patel Marg to Shibbanpura Gurudwara to Lal Chowk. | 36.00 03/10/2023 | 36.00 23 Oct 2023 | 12 Dec 2023 12 Dec 2023 | | Prateek Enterprises | Preeti BansalJunior Engineer | 15th Finance Commission(AQI/NCAP) | Completed |
|
|
|
|